Tenders/Bukhara Region Water Supply and Sewerage
Closed🇺🇿UzbekistanServices

Bukhara Region Water Supply and Sewerage

Asian Infrastructure Investment Bank (AIIB)
Published: Apr 2, 2025
Updated: Apr 28, 2026
Source: AIIB - Asian Infrastructure Investment Bank

This tender is closed

The submission deadline for this tender has passed. It is no longer accepting bids.

Browse open Water & Sanitation tenders in Uzbekistan

Description

AIIB Specific Procurement Notice: Bukhara Region Water Supply and Sewerage. Member: Uzbekistan. Sector: Water. Published: April 2, 2025.

*OFFICIAL USE ONLY Specific Procurement Notice (SPN) Procurement of Works (Two-Envelope Tendering Process Without Prequalification) Country: Republic of Uzbekistan Employer: JSC Bukhoro Suv’Taminoti Project: Bukhara Region Water Supply and Sewerage Project (Phase 1) Loan No.: L0314A Contract Title: “Construction and Reconstruction Works for Water Supply and Distribution in Peshku District of Bukhara Region (Lot 1 & 2).” PN Reference/Tender No: BWSP-S/RFB/21-22 Tender Document Issued On: 04.04.2025 1. The Republic of Uzbekistan has received financing from the Asian Infrastructure Investment Bank (AIIB or the Bank) toward the cost of the Bukhara Region Water Supply and Sewerage Project (Phase 1) and intends to apply part of the proceeds toward payments under the following contracts for Construction and Reconstruction Works for Water Supply and Distribution in Peshku District of Bukhara Region (Lot 1 & 2). The tendering process will be governed by the Bank’s Procurement Instructions for Recipients (PIR) dated July 2024; 2. The JSC Bukhoro Suv’Taminoti now invites sealed tenders from eligible Tenderers for Construction and Reconstruction Works for Water Supply and Distribution in Peshku District of Bukhara Region (Lot 1 & 2). The works include: Lot No 1: BWSP-W/RFB/21 Main Water Transmission Line, Susanna, Kudrashekh & Karakalpak WDUs, and Water Supply System No. Component Scope of Works 1 Transmission Line ▪ Construction of 57,65 km of water main line ▪ Construction of new water reservoir (2x1000 m3) ▪ Construction of pumping station and check point Susanna WDUs & 2. ▪ Construction of chambers, septic tank, drainage pump chamber, generator Network ▪ Construction of water pipelines and supply networks is planned for a length of 14,34 km 315-63 mm ▪ Construction of new water reservoir (2x900 m3) ▪ Reconstruction of pumping station and check point Kudrashekh WDUs ▪ Reconstruction of water reservoir (2x200 m3) 3. & Network ▪ Construction of chambers, septic tank, drainage pump chamber, generator ▪ Construction of water pipelines and supply networks is planned for a length of 24,8 km 250-63 mm ▪ Construction of new water reservoir (2x1400 m3) ▪ Construction of pumping station and check point Karakalpak WDUs 4. ▪ Construction of chambers, septic tank, drainage pump chamber, generator & Network ▪ Construction of water pipelines and supply networks is planned for a length of 120,62 km 315-63 mm Lot No 2: BWSP-W/RFB/22 Olong, Dedaroz & Hoja Peshku WDUs, and Water Supply System No. Component Scope of Works ▪ Construction of new water reservoir (2x1600 m3) ▪ Construction of pumping station and check point Olong WDUs & 1. ▪ Construction of chambers, septic tank, drainage pump chamber, generator Network ▪ Construction of water pipelines and supply networks is planned for a length of 34,47 km 315-63 mm ▪ Construction of new water reservoir (2x2500 m3) ▪ Construction of new workshop building, administration building, car parking, Dedaroz WDUs & 2. internal and external lighting system Network ▪ Reconstruction of pumping station and check point ▪ Reconstruction of water reservoir (2x1000 m3) *OFFICIAL USE ONLY No. Component Scope of Works ▪ Construction of chambers, septic tank, drainage pump chamber, generator ▪ Construction of water pipelines and supply networks is planned for a length of 184,54 km 500 mm CS (7 km) and 315-63 mm ▪ Construction of new water reservoir (2x1000 m3) ▪ Construction of pumping station and check point Hoja Peshku 3. ▪ Construction of chambers, septic tank, drainage pump chamber, generator WDUs & Network ▪ Construction of water pipelines and supply networks is planned for a length of 76,24 km 315-63 mm The construction period is twenty-four (24) months for each lot. Qualification requirements are set out in Section III Evaluation and Qualifications Criteria of the tender document. Tendering will be conducted through International Open Competitive Tendering procedures as specified in the Bank’s Procurement Instructions for Recipients (PIR) dated July 2024 and is open to all eligible Tenderers as defined in the PIR; 4. Interested eligible Tenderers may obtain further information from Project Office JCS “Uzsuvtaminot” at the address indicated in para.8 and inspect the Tender Document during office hours 9:00 to 16:00 (Tashkent time); 5. To purchase the Tender documents in English, eligible Tenderers should: • Write to address indicated in para.8 requesting the Tender documents for the package BWSP-W/RFB/21-22: Construction and Reconstruction Works for Water Supply and Distribution in Peshku District of Bukhara Region; Lot No 1: BWSP-W/RFB/21 Main Water Transmission Line, Susanna, Kudrashekh & Karakalpak WDUs, and Water Supply System Lot No 2: BWSP-W/RFB/22 Olong, Dedaroz & Hoja Peshku WDUs, and Water Supply System • Pay a non-refundable fee of either (a) USD

About This Opportunity

This is a services contract in the water and sanitation sector. Located in Uzbekistan, Central Asia, this opportunity is open to firms and consortiums.

Published through AIIB - Asian Infrastructure Investment Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for services in the water and sanitation sector. Service contracts are typically evaluated on both technical quality and price, and may require bidders to demonstrate relevant experience and qualified personnel.

Sectors & Categories

Key Details

Contract Type
Services
Eligibility
Firms / Consortiums
Language
English

Source

aiib
AIIB - Asian Infrastructure Investment Bank
Multilateral

Contracting Authority

Asian Infrastructure Investment Bank (AIIB)
🇺🇿Uzbekistan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.