ADIF -Consejo de Administración
Public buyer in Spain · procurement notices and contract awards
- Notices
- 137
- Open now
- 9
- Awards with winner
- 63
- Last 12 months
- 137
About ADIF -Consejo de Administración
Since February 2026, BidsFactory has recorded 137 procurement notices from ADIF -Consejo de Administración, a contracting authority in Spain. 137 of them were published in the last 12 months. The most recent one was published on 13 November 2026. October and March are usually its busiest months for new tenders.
Most of its notices concern construction and civil works (46, 34%), followed by transport and logistics (28) and architecture and engineering (25). 89% of the notices are for services and 4% for works. The average window to submit a bid is 44 days from publication.
9 of its tenders are open right now and 63 have been awarded, 63 of them with a named winner. Recent and repeat winners include Northgate España Renting Flexible, ARCELORMITTAL ESPAÑA SA and UTE Control Vegetacion Este.
Among the 1,483 buyers in Spain with a profile on BidsFactory, it ranks 162nd by number of notices; Spain has 9,935 open tenders in total. Its notices are collected from PLACSP - Plataforma de Contratación del Sector Público.
Top sectors
Where it publishes
Open tenders(9)
- Asistencia técnica para la coordinación en materia de seguridad y salud durante la ejecución de los trabajos de mantenimiento y las obras de inversión en las líneas de red convencional incluidas en los ámbitos territoriales noreste y este. 2 lotes
Published: Nov 13, 2026Deadline and budget for membersConsulting
- Perfilado de carril en líneas de Alta Velocidad en explotación
Published: Nov 12, 2026Deadline and budget for membersServices
- Ejecución de las obras del proyecto de construcción línea 400. Tratamiento terraplenes inestables entre los ppkk 370+000 al 376+000.
Published: Nov 4, 2026Deadline and budget for membersServices
- Acuerdo Marco de asistencias técnicas para el control de calidad, cuantitativo, cualitativo, geométrico y pruebas de seguridad durante la ejecución de las obras de supresión de pasos a nivel.
Published: Nov 3, 2026Deadline and budget for membersServices
- Prestación de servicios de mantenimiento del material rodante ferroviario de la serie 310 de la Dirección de Servicios Logísticos
Published: Oct 30, 2026Deadline and budget for membersServices
- Proyecto constructivo para la electrificación de la línea Zaragoza - Teruel - Sagunto, tramo Teruel - Sagunto. Línea aérea de contacto.
Published: Oct 26, 2026Deadline and budget for membersServices
- Ejecución de obras y realización de mantenimiento del sistema de comunicaciones móviles GSM-R cercanías Madrid – C5 – Sur Humanes - Móstoles
Published: Oct 5, 2026Deadline and budget for membersServices
- Obras de ejecución del proyecto de construcción de la nueva estación intermodal de Gijón. Fase 1: remodelación del entorno urbano de la calle Carlos Marx.
Published: Oct 1, 2026Deadline and budget for membersServices
- Ejecución de las obras del proyecto de construcción del soterramiento de la línea de ancho métrico en Torrelavega (Cantabria) y del Proyecto de construcción de las actuaciones complementarias al soterramiento de la línea de ancho métrico en Torrelavega (Cantabria)
Published: Oct 1, 2026Deadline and budget for membersServices
Recent contract awards(63)
- Mantenimiento de las instalaciones de energía de tracción: línea aérea de contacto, telemando de energía, subestaciones, centros de autotransformación y sistemas asociados de LAV levante tramos: Madrid Chamartín-Valencia-Alicante, Xátiva-Torrent y Xátiva-La Encina
Winner: UTE Sacyr TeliceOct 27, 2026Amount: Premium
- Mantenimiento de las instalaciones de energía de tracción: línea aérea de contacto, telemando de energía, subestaciones, centros de autotransformación y sistemas asociados de LAV sur tramos: Madrid- Sevilla, La Sagra-Toledo, Córdoba-Málaga y Antequera-Granada
Winner: UTE Electren Elecnor Syneox CoxOct 27, 2026Amount: Premium
- Servicio de mantenimiento integral de las estaciones dependientes de la Subdirección de Estaciones Centro
Winner: Fulton Servicios Integrales SAOct 27, 2026Amount: Premium
- Ejecución de las obras correspondientes al proyecto constructivo para la renovación de la señalización en la línea C-5 de Madrid cercanías. Tramo: Atocha – Móstoles El Soto.
Winner: UTE Hitachi-sistemOct 27, 2026Amount: Premium
- Ejecución de las obras del proyecto de construcción de la nueva estación de Tres Cantos Norte (Madrid).
Winner: Vias Y Construcciones SAOct 27, 2026Amount: Premium
- Redacción de proyecto constructivo y ejecución de obra para las instalaciones de comunicaciones de la estación de Santander.
Winner: Cox T&i SLOct 27, 2026Amount: Premium
- Ejecución de las obras del proyecto constructivo de instalaciones de seguridad y comunicaciones para la adaptación al tercer carril y ampliación a 750 metros del tramo La Encina-Alicante
Winner: UTE Alstom-inst-syneoxOct 27, 2026Amount: Premium
- Sexto pedido contra acuerdo marco de control de la vegetación en líneas convencionales y de ancho métrico de la red ferroviaria de interés general (RFIG). 6 lotes. Lote 4: Subdirección de Operaciones Este.
Winner: UTE Control Vegetacion EsteOct 15, 2026Amount: Premium
- Sexto pedido contra acuerdo marco de control de la vegetación en líneas convencionales y de ancho métrico de la red ferroviaria de interés general (RFIG). 6 lotes. Lote 2. Subdirección de Operaciones Norte.
Winner: UTE Aplinher-sintraOct 15, 2026Amount: Premium
- Cuarto pedido contra el acuerdo marco 4.25/27510.0034 para el suministro de carril para la renovación de vía. Tramo: entre estaciones de Guillarei, Redondela y Vigo-Guixar, líneas 810 y 812 y entre la estación de Redondela y la bifurcaciónArcadede la línea 824 Redondela – Santiago. Actuación n.º 2
Winner: Arcelormittal España SAOct 8, 2026Amount: Premium
- Redacción de proyecto y ejecución de obra para la actuación de mejora de la infraestructura. Refuerzo de taludes y mejora de los sistemas de drenaje longitudinal actuales entre los ppkk 208+280 – 208+860. Línea 500 (Bif. Planetario – Bif. Casa de la Torre). Provincia: Cáceres.
Winner: UTE Miv Sur L6 2025Sep 24, 2026Amount: Premium
- Quinto pedido contra Acuerdo Marco de control de la vegetación en líneas convencionales y de ancho métrico de la red ferroviaria de interés general (RFIG). Expte: matriz 2.23/28520.0095. Lote 1 – Subdirección de Operaciones Noroeste
Winner: Seanto SLSep 24, 2026Amount: Premium
- Ejecución de las obras y realización del mantenimiento del proyecto constructivo de la subestación eléctrica de tracción y centros de autotransformación asociados del tramo Ronda-Algeciras de la línea Bobadilla-Algeciras.
Winner: Citracc Rail SASep 24, 2026Amount: Premium
- Obras de ejecución del proyecto constructivo de la nueva estación Casilla de los Pinos en Dos Hermanas
Winner: UTE Comsa SAU - Martin Casillas SLUSep 24, 2026Amount: Premium
- Obras de ejecución del proyecto de construcción de actuaciones de mejora del drenaje frente a inundaciones en la línea Madrid-Valencia a su paso por el término municipal de Benifaió (Valencia)
Winner: UTE Drenajes BenifaioSep 24, 2026Amount: Premium
- Obras del proyecto de ejecución de edificio ferroviario de oficinas en Santander
Winner: UTE Edificio Ferroviario SantanderSep 24, 2026Amount: Premium
- Inspección, ensayos y reparación especializada de transformadores de tracción en subestaciones de la Red de Alta Velocidad
Winner: Siemens Energy SASep 24, 2026Amount: Premium
- Quinto pedido contra Acuerdo Marco de control de la vegetación en líneas convencionales y de ancho métrico de la red ferroviaria de interés general (RFIG). 6 lotes. lote 5: Subdirección de Operaciones Centro
Winner: Ferrovial Construccion SASep 16, 2026Amount: Premium
- Quinto pedido contra Acuerdo Marco de servicios para el contrato de control de la vegetación en líneas convencionales y de ancho métrico de la red ferroviaria de interés general (RFIG). 6 lotes. Expte. matriz n.º 2.23/28520.0095 - Lote 3. subdirección de Operaciones Noreste. Acuerdo Marco Exp.: 2.23/28520.0107
Winner: UTE Control Vegetacion NoresteSep 16, 2026Amount: Premium
- Quinto pedido contra Acuerdo Marco de control de la vegetación en líneas convencionales y de ancho métrico de la red ferroviaria de interés general (RFIG). 6 lotes. Lote 6 - Subdirección de Operaciones Sur. Expte. nº. 2.23/28520.0110
Winner: UTE Vegetacion Rfig Lote 6Sep 16, 2026Amount: Premium
Questions about ADIF -Consejo de Administración
- How many tenders does ADIF -Consejo de Administración publish?
- ADIF -Consejo de Administración has published 137 procurement notices on BidsFactory since 2026, about 137 a year (137 in the last 12 months). 9 are open for bids right now.
- What does ADIF -Consejo de Administración buy?
- Its tenders are mostly in construction and civil works, transport and logistics and architecture and engineering, and 89% of them are for services.
- Who wins ADIF -Consejo de Administración's contracts?
- 63 of its contract awards name the winning supplier. Companies that have won its contracts include Northgate España Renting Flexible, ARCELORMITTAL ESPAÑA SA and UTE Control Vegetacion Este.
- How long do bidders have to respond to ADIF -Consejo de Administración's tenders?
- On average 44 days pass between publication and the submission deadline of its tenders.