Pacific Regional Connectivity Program 2:FSM Connectivity Project

P130592 · Micronesia · East Asia and Pacific · Financing: I, D, A, D, 1

62 tenders in the planPlan updated 2026-05-292 notices on BidsFactory · 0 open · 2 awardedProject page at the World Bank

Procurement plan: every tender of the project

  • Project Accountant (Replacement)

    Plannedpipeline.cat.individual
  • Project Accountant - OAE

    Closedpipeline.cat.individual

    Advertised 2025-07-10

    Estimate (Premium)
  • Supporting materials for Pohnpei FTTH

    ClosedGoodsDirect selection

    Advertised 2025-04-01

    Estimate (Premium)
  • Accelerated Build Support Services

    ClosedNon-consulting servicesDirect selection

    Advertised 2025-04-01

    Estimate (Premium)
  • Generator for Satellite Gateway

    ClosedGoodsDirect selection

    Advertised 2025-02-12

    Estimate (Premium)
  • Upgrade and Repair of Sub marine Cable Equipment

    ClosedGoodsDirect selection

    Advertised 2025-02-05

    Estimate (Premium)
  • Assess PLSE Suspension

    ClosedNon-consulting servicesDirect selection

    Advertised 2025-01-26

    Estimate (Premium)
  • Vehicles to support construction and maintenance of new network

    ClosedGoodsDirect selection

    Advertised 2024-09-20

    Estimate (Premium)
  • Relocate Pohnpei Terminal Equipment to new OAE Cable Landing Station

    ClosedNon-consulting servicesDirect selection

    Advertised 2024-09-06

    Estimate (Premium)
  • Specialist Advisor to OAE

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-07-30

    Estimate (Premium)
  • Project Management and Technical Support for FTTH Build

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-06-06

    Estimate (Premium)
  • Microduct and fibre for Pohnpei

    ClosedGoodsDirect selection

    Advertised 2024-03-06

    Estimate (Premium)
  • Technical Consultant for Subsea Cable Systems

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-02-09

    Estimate (Premium)
  • Interim Satellite Capacity for Kosrae and South Tawara

    ClosedNon-consulting servicesRFB

    Advertised 2023-04-08

    Estimate (Premium)
  • Financial Advisor to OAE

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-01-31

    Estimate (Premium)
  • 48V Power Equipment to support OAE Hantru Upgrade

    ClosedGoodsDirect selection

    Advertised 2021-10-21

    Estimate (Premium)
  • FSMTCC has access, through and IRU, of 50% of conveyed spectrum in Hantru Spur and -Cable on the route Pohnpei-Guam. The upgrade createsa bandwidth of 2x100Gbs on the route for newly establish ed licensed operators in FSM and the State of Kosrae

    ClosedGoodsDirect selection

    Advertised 2021-10-04

    Estimate (Premium)
  • One Surveyor to assist FTTH Design consultant UCG remotely on Pohnpei. Role is handson the ground to identify and verify, measure and film / photograph along the (planned) route of the network.

    Closedpipeline.cat.individualDirect selection

    Advertised 2021-08-02

    Estimate (Premium)
  • One Surveyor to assist FTTH Design consultant UCG remotely on Pohnpei. Role is handson the ground to identify and verify, measure and film / photograph along the (planned) route of the network.

    Closedpipeline.cat.individualDirect selection

    Advertised 2021-08-02

    Estimate (Premium)
  • One Surveyor to assist FTTH Design consultant UCG remotely on Pohnpei. Role is handson the ground to identify and verify, measure and film / photograph along the (planned) route of the network.

    Closedpipeline.cat.individualDirect selection

    Advertised 2021-08-02

    Estimate (Premium)
  • CEO Contract. Current contract with FSMTCC CEO Pieter Bakker has expired. It is the intention to continue with the current CEO

    Closedpipeline.cat.individualDirect selection

    Advertised 2021-07-01

    Estimate (Premium)
  • Detailed Design & Material Specs

    Closedpipeline.cat.individualDirect selection

    Advertised 2020-06-03

    Estimate (Premium)
  • Administrative projectmanager to support the EMC management committee on all RFB related issues.

    Closedpipeline.cat.individual

    Advertised 2020-05-27

    Estimate (Premium)
  • Hantru-1 upgrade in Pohnpei, FSM, for EMCS

    ClosedGoodsDirect selection

    Advertised 2020-05-04

    Estimate (Premium)
  • FSM EMC Office Support Equipment

    ClosedGoodsRFQ

    Advertised 2020-04-06

    Estimate (Premium)
  • EMC Submarine Cable System Wet Segment

    ClosedWorksRFB

    Advertised 2020-02-17

    Estimate (Premium)
  • Technical Project Manager FSM Back-up

    Closedpipeline.cat.individual

    Advertised 2020-01-15

    Estimate (Premium)
  • Governance Advisor for O AE Board of Directors

    Closedpipeline.cat.individualDirect selection

    Advertised 2019-09-30

    Estimate (Premium)
  • Technical Project Manager to oversee Kosrae Pohnpei CLS civil work implementation

    Closedpipeline.cat.individualDirect selection

    Advertised 2019-08-20

    Estimate (Premium)
  • Legal Advisor to OAE

    Closedpipeline.cat.individualDirect selection

    Advertised 2019-06-25

    Estimate (Premium)
  • Specialist Optical Test Equipment - 3 sets

    ClosedGoodsRFQ

    Advertised 2018-12-17

    Estimate (Premium)
  • 48VDC Power Conversion for Chuuk and Pohnpei CLS's for CP Cable

    ClosedGoodsDirect selection

    Advertised 2018-10-01

    Estimate (Premium)
  • Chuuk fronthaul works

    ClosedWorksRFQ

    Advertised 2018-09-20

    Estimate (Premium)
  • Chuuk Coastal Erosion Mitigation

    ClosedWorksRFQ
  • East Micronesian Cable System Wet Plant

    ClosedWorksRFB
  • Lot 1. Cable Landing Station Pohnpei + Foundation + Fronthaul Work from Beach Man Hole to CLS. Lot 2. Cable Landing Station Kosrae + Foundation + Front haul Work from Beach Man H

    ClosedWorksRFQ
  • OEM support for Hantru Capacity Commissioning

    ClosedWorksDirect selection
  • 48VDC Power Conversion for Chuuk CLS and Pohnpei CLS

    ClosedGoodsRFQ
  • Network Operation Center Implementation Equipment

    ClosedGoodsRFP
  • FSM EMC Project office support Furniture

    ClosedGoodsRFQ
  • Support Vehicle for OAE - Pohnpei

    ClosedGoodsRFQ

    View noticeWinner: TRIPLE J AUTO 1· Awarded 2026-01-09Contract amount (Premium)

  • Hantru-1 Upgrade Pohnpei per EMC IRU Deed

    ClosedNon-consulting servicesRFQ
  • Network Operation Center Design and Implementation

    ClosedNon-consulting servicesRFB
  • Interim Satellite Capacity for Kosrae and South Tawara

    ClosedNon-consulting servicesRFP
  • Interim Satellite Capacity for Kosrae and South Tawara

    ClosedNon-consulting servicesRFB
  • Relocate Ciena Hantru SLTEto new CLS in Pohnpei

    ClosedNon-consulting servicesDirect selection
  • Publicity and Communications (CQS Limited under Guidelines)

    ClosedConsultingCQS
  • Overall Project Manager EM C (FSM share)

    ClosedConsultingRFQ
  • Design for Regional Communications Building at Palikir

    ClosedConsultingCQS
  • Chief Executive Officer (2018 on)

    Closedpipeline.cat.individual
Page 1 of 2