Improvement of Solid Waste Management to Support Regional and Metropolitan Cities

P157245 · Indonesia · East Asia and Pacific · Financing: I, B, R, D, 9

Environment & ClimateGeneral Supplies & ServicesGovernance & Public AdministrationConstruction & Civil WorksUrban Development & HousingArchitecture & Engineering Services
268 tenders in the planPlan updated 2026-10-2180 notices on BidsFactory · 0 open · 57 awardedProject page at the World Bank

Procurement plan: every tender of the project

  • Supervision for Construction of Solid Waste Treatment Facility (TPST) Refuse Derived Fuel (RDF) at Bandung City

    PlannedConsultingCQS
  • Preparation of a Feasibility Study and Basic Design of Integrated Waste Processing Sites (TPST) for Cilegon City, Padang City, Tuban Regency, and Gianyar Regency

    PlannedConsultingCQS
  • INTEGRATED CONSTRUCTION MANAGEMENT CONSULTANT DESIGN AND CONSTRUCTION OF TPST INDRAMAYU DISTRICT

    PlannedConsultingCQS
  • Procurement Of Domestic Waste water Sampling Equipment

    PlannedGoodsRFQ
  • Procurement Of Water Content And Rdf Product Size Measuring Instruments

    PlannedGoodsRFQ
  • Individual Construction Consultancy Services– Environmental Engineering Expert (Team Coordinator) Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Waste Management Planning Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Mechanical Engineering Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Electrical Engineering Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Building Structure Engineering Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Construction Safety/HSE Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Quantity and Cost Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Environmental Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Geotechnical Engineering Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Quantity and Cost Analyst 1 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Waste Processing Analyst Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Quantity and Cost Analyst 2 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Quantity and Cost Analyst 3 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– Waste Processing Machinery Analyst Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– CAD Operator/Drafter 1 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– CAD Operator/Drafter 2 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services– CAD Operator/Drafter 3 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services –Waste Management Planning Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Environmental Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services –Mechanical Engineering Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Electrical Engineering Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Building Structure Engineering Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Quantity and Cost Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Construction Safety / HSE Expert Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services –Waste Processing Analyst Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Quantity and Cost Analyst 1 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Quantity and Cost Analyst 2 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services –Waste Processing Machinery Analyst Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – CAD Operator / Drafter 1 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – CAD Operator/Drafter 2 Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP Phase 1 & 2

    Plannedpipeline.cat.individual
  • Individual Construction Consultancy Services – Environmental Engineering Expert (Team Coordinator) Technical Planning for Optimization of Integrated Waste Processing Facility (TPST) ISWMP P

    Plannedpipeline.cat.individual
  • improvement of microbiology laboratory infrastructure at the sanitation engineering center

    PlannedWorksRFQ
  • Steering Committee Support Consultant for the ISWMP Program to Support the National Strategic Integrated Solid Waste Management Program.

    PlannedConsultingCQS
  • Assistance in the Formation/Strengthening of Waste Collection Service Governance Organizations in a Segregated Manner at the Village/Village Level in Cilegon City

    PlannedNon-consulting servicesRFB

    View noticeWinner: GLOBAL MUTU UTAMA· Awarded 2026-07-06Contract amount (Premium)

  • Provision of Transportation Facilities for Waste, TPST Processed Outputs, and Residual Waste in Cimahi City and Indramayu Regency.

    PlannedGoodsRFB
  • Provision of Waste Transportation Facilities in Denpasar City and Gianyar Regency

    PlannedGoodsRFB

    View noticeWinner: SENTRABUMI PALAPA UTAMA· Awarded 2026-06-15Contract amount (Premium)

  • Assistance in the Establishment and Strengthening of Governance Organizations for Source-Segregated Waste Collection Services at the Village Level in Bali (Denpasar City and Gianyar Regency)

    PlannedNon-consulting servicesRFB
  • Provision of Waste Transportation Facilities in Tuban Regency

    PlannedGoodsRFB

    View noticeWinner: SENTRABUMI PALAPA UTAMA· Awarded 2026-07-10Contract amount (Premium)

  • Provision of Garbage Motorcycles Phase 1 of Upstream Garbage Collection Facilities in Denpasar City

    PlannedGoodsRFB

    View noticeWinner: DUTATEKNOLAYAN ABADITAMA· Awarded 2026-07-28Contract amount (Premium)

  • Provision of Pickup Trucks Phase 1 of Upstream Waste Collection Facilities in Denpasar City and Gianyar Regenc

    PlannedGoodsRFB

    View noticeWinner: PRAKARSA TEKNIK UTAMA· Awarded 2026-07-28Contract amount (Premium)

  • Provision of Garbage Motorcycles Phase 2 of Upstream Garbage Collection Facilities in Denpasar City

    PlannedGoodsRFB

    View noticeWinner: DUTATEKNOLAYAN ABADITAMA· Awarded 2026-08-24Contract amount (Premium)

  • Procurement of Garbage Motorcycles (Phase 1) for Upstream Waste Collection Facilities in the City of Karawang and Depok Regency

    PlannedGoodsRFB

    View noticeWinner: MULIA BERKAHTAMA ABADI· Awarded 2026-08-06Contract amount (Premium)

  • Procurement Of Equipment For Testing Chlorine Levels Of Rdf Products

    PlannedGoodsRFQ
  • Procurement of furniture for the microbiology laboratory of the sanitation engineering center

    PlannedGoodsRFQ
  • Provision of Pickup Car Phase 2 for Waste Collection Facilities in the Upstream Area of Tuban Regency

    PlannedGoodsRFB

    View noticeWinner: PT. SENTRABUMI PALAPA UTAMA· Awarded 2026-08-28Contract amount (Premium)

Page 1 of 6