Rural Water Supply and Sanitation Project

P162637 · Tajikistan · Europe and Central Asia · Financing: I, D, A, D, 4

24 tenders in the planPlan updated 2026-09-0110 notices on BidsFactory · 0 open · 8 awardedProject page at the World Bank

Procurement plan: every tender of the project

  • Construction Supervision Engineer for Subzone 5.1 of Vose District

    Plannedpipeline.cat.individualDirect selection
  • Audit of consolidated financial statements of State Unitary Enterprise “Khojagii Manziliyu Kommunali” for the fiscal years ended December 31, 2021,

    Plannedpipeline.cat.individualDirect selection
  • Individual Consultant for Institutional Development for the Water Supply and Sanitation Facility in Vose district

    Plannedpipeline.cat.individualDirect selection
  • Individual consultant for geophysical surveys

    Plannedpipeline.cat.individualDirect selection

    View noticeWinner: RAHMONOV SHARIFKHUJA SAYVALIEVICH· Awarded 2026-09-16

  • Procurement of 5,800 water meters for local water utility in Kushoniyon District (Zone 2A)

    PlannedGoodsDirect selection

    View noticeWinner: LLC BALKH-2015· Awarded 2026-09-22Contract amount (Premium)

  • Individual Consultant for Project Impact Assessment

    Closedpipeline.cat.individualDirect selection

    View noticeWinner: RAHIMOV KAMOLJON SHARAFATULLOEICH· Awarded 2026-06-16

    Advertised 2026-06-11

    Estimate (Premium)
  • Engineer for Supervision of Construction of the Package: RWSSP-NCB-W/026-1 «Capital Repair of the Existing Office Facilities of Vose Water Supply and Wastewater Utility and Construction of a New Administrative B

    Closedpipeline.cat.individualDirect selection

    View noticeWinner: SAILONOV DAVRON· Awarded 2026-01-13

    Advertised 2026-01-13

    Estimate (Premium)
  • Capital repair of the existing office facilities of Vosse water supply and wastewater utility and construction of the new administrative building

    ClosedWorksRFB

    Advertised 2025-03-13

    Estimate (Premium)
  • Individual Consultant-Project Manager

    Closedpipeline.cat.individual

    Advertised 2024-06-20

    Estimate (Premium)
  • Baseline Survey (Phase 2) - Design and implementation of a district in the Vakhsh zone

    ClosedConsultingCQS

    Advertised 2022-05-04

    Estimate (Premium)
  • Lot-2: Construction of a pressure-regulating tank "Pushonyi Bolo", a pressure-regulating tank "Pushonyi miyona", a water supply line and a distribution network of the villages "Pushonyi Bolo" and "Pushonyi miyo

    ClosedWorksRFB

    Advertised 2021-10-15

    Estimate (Premium)
  • Construction of water supply systems in zone 5.2, Gulteppa water intake facilities (water conduit, distribution network)

    ClosedWorksRFB

    Advertised 2021-07-22

    Estimate (Premium)
  • Individual consultant to support the institutional assessment of the SUE KMK in the Vakhsh zone

    Closedpipeline.cat.individual

    Advertised 2021-05-26

    Estimate (Premium)
  • Construction of the main water conduit from Zone 5.2 to the site of pressure regulating tanks (PRT) "Dashtidili" of the Vose district.

    ClosedWorksRFB
  • Construction of WASH facilities in schools and medical institutions in the Vosse district Jamoat Tugarak:Строительство уборная на12 очков в 3-школах;Строительство уборная на8- очков в 4-школах;Строительство уборная на8- очков в 3-МЦ;

    ClosedWorksRFB
  • Construction of WASH facilities in schools and medical institutions in the Vosse district, Radjabova Jamoat

    ClosedWorksRFB
  • Construction of a platform for pressure-control tanks zone 2A, 2B (Kushoniyon), Zone 3D (Vakhsh)

    ClosedWorksRFB
  • Reconstruction of Water Treatment Plant (WTP) in Kushoniyon District

    ClosedWorksRFB
  • 026-1 / Capital repair of the existing office facilities of Vosse water supply and wastewater utility and construction of the new administrative building

    ClosedWorksRFB
  • Replication and printing of information materials and promotional products for the social mobilization and behavior change campaign Kushoniyon district

    ClosedGoodsRFQ
  • Design, supply, installation and commissioning the billing system for state unitary enterprise “khojagii manziliyu kommunaly” sue “KMK”.

    ClosedGoodsRFB
  • Communication campaign and social mobilization in Khatlon region, Phase 2 in selected districts of the Vakhsh zone

    ClosedConsultingCQS
  • Regional Individual Consultant on Construction Design Supervision

    Closedpipeline.cat.individualDirect selection
  • Individual Consultant-Project Manager

    Closedpipeline.cat.individual

    View noticeWinner: ASRORZODA FOTEH· Awarded 2026-02-02

Other notices and awards in this project