Rural Electrification Project
P170132 · Tajikistan · Europe and Central Asia · Financing: I, D, A, E, 4
Procurement plan: every tender of the project
Supply and installation of 141 units of smart meters for irrigation water pumping stations in Khatlon region.
PlannedGoodsDirect selectionView noticeWinner: TOCHIKGIDROELEKTROMONTAZH, JSK· Awarded 2026-06-19Contract amount (Premium)
Purchase of an electric vehicle for visiting sites included in the project
PlannedGoodsRFQView noticeWinner: LLC SUADO JT· Awarded 2026-07-02Contract amount (Premium)
FINANCIAL STATEMENTS AUDIT OF OJSC “Pamir Energy Company” FOR THE FISCAL YEAR ENDED DECEMBER 31, 2026
PlannedConsultingLCSCONSULTING SERVICES FOR: FINANCIAL STATEMENTS AUDIT OF OJSC “Pamir Energy Company” FOR THE FISCAL YEAR ENDED DECEMBER 31, 2025
AdvertisedConsultingLCSView noticeWinner: GRANT THORNTON DOO· Awarded 2026-01-20
Advertised 2026-10-28
Estimate (Premium)Supply of Equipment and Materials for the 110/35/10 kV Sharifobod Substation, and Supervision of Installation and Commissioning in Khorog, Tajikistan
ClosedGoodsRFBView noticeWinner: HNAC TECHNOLOGY CO., LTD.· Awarded 2026-07-01Contract amount (Premium)
Advertised 2026-03-27
Estimate (Premium)Construction and Installation of the Sharifobod 110/35/10 kV Substation in Khorog, GBAO, Tajikistan
ClosedWorksRFBView noticeWinner: CJSC "BADAKHSHON TADES"· Awarded 2026-06-09Contract amount (Premium)
Advertised 2026-02-04
Estimate (Premium)Construction of Bodomdara S HPP in Roshtqala district and Pshikharv SHPP in Vanj district, VMKB of Republic Tajikistan
ClosedWorksDirect selectionAdvertised 2025-05-30
Estimate (Premium)Repair additional classrooms with energy efficiency technologies in the 1st floor of the secondary school #7 in Khorog. According to these activity, Pamir Energy plans to renovate 4 classrooms, 3 staff’ rooms and 3 school toilets.
ClosedWorksRFQAdvertised 2024-08-15
Estimate (Premium)Construction/rehabilitation of 8 SHPPs in the GBAO district of Darvaz (275kW Yoged, 25kW Gushun), Roshtqala ( 25kW Bodomdara), Vanj (45 kWPshikharv), and Rushan (20kW Ravsharv, 100kW Ravmed, 25 kWJizev, 220kW Darjomch.
ClosedWorksDirect selectionAdvertised 2023-06-30
Estimate (Premium)Construction of 5 SHPPs in the GBAO in Rushan district 15kW Devlokh, 25kW Midenchid, 25kW Bizhravd, 50 kW Achirkh and rehabilitation of 174kW Basid.
ClosedWorksDirect selectionAdvertised 2023-06-30
Estimate (Premium)Design, supply, installation, and commissioning of Solar PV +Wind + BESS.
ClosedWorksRFBAdvertised 2023-05-10
Estimate (Premium)Supply of Electro-Mechanical Equipment for HPPs + Supervision of Installation Works and Commissioning.
ClosedGoodsRFBAdvertised 2023-04-20
Estimate (Premium)Design + Civil & Electromechanical Works for HPP.
ClosedWorksRFBAdvertised 2023-03-10
Estimate (Premium)Goods for construction of 35kV Transmission line in Vanj valley, GBAO
ClosedGoodsRFBAdvertised 2023-02-07
Estimate (Premium)Construction of 35 Transmission lines in Vanj valley of the GBAO.
ClosedWorksRFBAdvertised 2023-02-02
Estimate (Premium)Design + Construction of the distribution networks.
ClosedWorksRFBAdvertised 2022-11-15
Estimate (Premium)Supply of equipment and materials for construction of distribution networks
ClosedGoodsRFBAdvertised 2022-11-15
Estimate (Premium)Design, supply, and installation of Khorog-Qozideh OHL
ClosedWorksRFBAdvertised 2021-12-15
Estimate (Premium)Quality control and supervision over preparation of biodiversity management plan
Closedpipeline.cat.individualDirect selectionAdvertised 2021-06-10
Estimate (Premium)Preparation of Energy Audit, Detailed Designs, Technical Specifications and Support to Pamir Energy Company during Commissioning and Management Supervision for Energy Efficient Building Renovation
ClosedConsultingCQSAdvertised 2021-05-27
Estimate (Premium)Khorog-Qozideh OHL biodiversity assessment and management plan
ClosedConsultingCQSAdvertised 2021-05-24
Estimate (Premium)Conducting technical studies required for Sebzor HPP project.
Closedpipeline.cat.individualDirect selectionAdvertised 2021-04-14
Estimate (Premium)Horizontal and vertical core recovery boreholes
Closedpipeline.cat.individualDirect selectionAdvertised 2020-07-08
Estimate (Premium)Meter&Data Acquisition System for Pamir Energy
ClosedGoodsDirect selectionAdvertised 2020-06-22
Estimate (Premium)Goods for grid-connection of target settlements to PEC network (goods)
ClosedGoodsRFBAdvertised 2020-05-12
Estimate (Premium)Connection of target settlements to the distribution network and consumer-level wiring in GBAO
ClosedWorksRFBAdvertised 2020-04-27
Estimate (Premium)Project Management Consultant
ClosedConsultingQCBSAdvertised 2020-02-04
Estimate (Premium)Piloting of energy effiency in public facilities
ClosedWorksRFQDesign, supply, and installation of micro-grids in GBAO (works)
ClosedWorksRFBTesting of physical and mechanical properties of soil and rock samples
ClosedNon-consulting servicesRFQSeismic refraction survey
ClosedNon-consulting servicesRFQGeological-geomorphological study
ClosedNon-consulting servicesRFQSpaceborne Synthetic Aperture Radar (SAR) Interferometry Analysis
ClosedNon-consulting servicesRFQDevelopment of financing mechanisms for energy effiency and awareness-raising
ClosedConsultingCQSFinancial statement audit of OJSC “Pamir Energy Company” for the fiscal year ended December 31, 2020
ClosedConsultingLCSCоnsulting services for "Financial Statements audit of OJSC “Pamir Energy Company” for the fiscal year ended December31,2022"
ClosedConsultingLCSCONSULTING SERVICES FOR: FINANCIAL STATEMENTS AUDIT OF OJSC “Pamir Energy Company” FOR THE FISCAL YEAR ENDED DECEMBER 31,2023
ClosedConsultingLCSPreparation of bidding documents for Khorog-Qozideh OHL and support during the tender
Closedpipeline.cat.individualDirect selection