Ulaanbaatar Heating Sector Improvement Project

P170676 · Mongolia · East Asia and Pacific · Financing: I, D, A, 6, 5

Monitoring, Evaluation & LearningGeneral Supplies & Services
95 tenders in the planPlan updated 2026-05-142 notices on BidsFactory · 0 open · 2 awardedProject page at the World Bank

Procurement plan: every tender of the project

  • Measuring and monitoring tools and equipment required for the UBDHC

    PlannedGoodsRFQ

    View noticeWinner: MEASUREMENT· Awarded 2026-08-17Contract amount (Premium)

  • Author`s supervision for Expansion of the 1A main pipeline with a diameter of 2D400mm into 2D600mmfrom point DH-110 to point DH-110-A17, 550meter pair

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-12-16

    Estimate (Premium)
  • Author`s supervision for Expansion of the 2D main pipeline with a diameter of 2D250mm into 400m m and 1A main pipeline replacing and elevating with a diameter of 2D400mm

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-12-16

    Estimate (Premium)
  • Design and budget amendment and Author's supervision consulting services of the newly planned heat pipeline construction from the south side of the Solomon (i-mart) shopping center to the Heat Transfer Center #95 of OSNAUG

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-07-19

    Estimate (Premium)
  • Author`s supervision for Completing the work of the main heat pipeline with a diameter of 2f800mm installed from fixed support 43 in the southwest of TPP2 to District Heating substation 18 in the direction of Moskva district and put into operation.

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-07-19

    Estimate (Premium)
  • the replacement of the 6 kV constant speed pump on the return side of pressure boosting pump station No. 3 with a variable speed pump

    ClosedWorksRFB

    Advertised 2024-04-23

    Estimate (Premium)
  • THE DESIGN AND BUDGET AMENDMENT AND AUTHOR’S SUPERVISION FOR EXPANSION AND CHANNELING OF 0.95KM 2A MAIN PIPELINE WITH A DIAMETER OF2Ø350MM FROM THE POINTDH165 TO POINT DH221 TO

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-02-07

    Estimate (Premium)
  • Author's supervision consulting services for Expansion of 0.95km 2A heating main pipeline with diameter of 2F250/350mm from point DH 165 to point DH 221 to 2F500mm

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-01-16

    Estimate (Premium)
  • Consultancy service to identify the problems by comparing the heating sector planning, regulation, and institutional arrangement, and develop an operational plan of measures to be implemented in the heating sector

    Closedpipeline.cat.individualDirect selection

    Advertised 2024-01-10

    Estimate (Premium)
  • Consulting service for design and, budget /changing the design to pre-insulation/ of 9G main pipeline, expansion, and rehabilitation of the pipeline from point TK-32 to point TK-10 behind TPP-2

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-10-23

    Estimate (Premium)
  • Expansion of 0.95km 2A heating main pipeline with diameter of 2F250/350mm from point DH 165 to point DH 221 to 2F500mm

    ClosedWorksRFB

    Advertised 2023-08-31

    Estimate (Premium)
  • Expansion of 0.95km 2A heating main pipeline with a diameter of 2F250/350mm from point DH 165 to point DH 221 to 2F500mm

    ClosedWorksRFB

    Advertised 2023-05-02

    Estimate (Premium)
  • Author's supervision consulting services for Expansion of 9J heating main pipeline with diameter of 2F250/300mm from point DH 994 to point DH 9107 to 2F400mm

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-04-04

    Estimate (Premium)
  • Author's supervision consulting services for Rehabilitation of old 6 kV distribution facilities of Factory base of UBDHC and pump station No.3

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-03-30

    Estimate (Premium)
  • Author's supervision consulting services for Expansion and rehabilitation of 12G heating main pipeline with diameter of 2F500mm from point DH1280 to point DH1286 to 2F700mm

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-03-28

    Estimate (Premium)
  • Expansion of 0.95 km 2A heating main pipeline with diameter of 2F250/350mm from point DH 165 to point DH 221 to 2F500mm

    ClosedWorksRFB

    Advertised 2023-03-27

    Estimate (Premium)
  • Author's supervision consulting services for expansion and channeling of 2. 4km 4A, B main pipeline with diameter of 2f250/350mm from point DH408 to pint DH221 to 2f400mm

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-02-17

    Estimate (Premium)
  • Author's supervision consulting services for Expansion of 9A,B heating main pipeline with diameter of2F400/500mm from point IZ 918 to point DH 935 (point 4 8) to 2F700mm

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-02-03

    Estimate (Premium)
  • Design and budget amendments, and author's supervision consulting service for Expansion and rehabilitation of 9G heating main pipeline from point TK-10 to point TK-32 behind TPP-2 (expansion of existing 2f400 mm diameter pipeline to 2F500 m

    Closedpipeline.cat.individualDirect selection

    Advertised 2022-02-21

    Estimate (Premium)
  • Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699 (667.8m.pair of pipelines with steam pipeline from the fixed pillar of point 183 to the end of the fixed pillar o

    ClosedWorksRFB

    Advertised 2021-12-05

    Estimate (Premium)
  • Consulting service for the author’s supervision for the construction of a temporary steam pipeline to supply for TPP 3 consumers

    Closedpipeline.cat.individualDirect selection

    Advertised 2021-07-05

    Estimate (Premium)
  • Construction of temporary steam-pipeline to supply for TPP 3 consumers

    ClosedWorksRFQ

    Advertised 2021-06-10

    Estimate (Premium)
  • Consulting service for the author’s supervision with the amendment of the drawing and budget for expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699

    Closedpipeline.cat.individualDirect selection

    Advertised 2021-04-02

    Estimate (Premium)
  • Consulting service for the author’s supervision with the amendment of the drawing and budget for expansion and rehabilitation of 2F400/1F600mm 3G main pipeline to 2F700mm from TK-521 to TK-328

    Closedpipeline.cat.individualDirect selection

    Advertised 2021-04-02

    Estimate (Premium)
  • Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699 (from point 12 to point 36 with 214 m.pair pipelines with steam pipeline (in the property of TPP-3))

    ClosedWorksRFB
  • Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699 (664m.pair of pipelines with steam pipeline from the fixed pillar of point 36 inside the property of TPP-3 JSC to the fixed pillar of point 66

    ClosedWorksRFB
  • Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699 (628.5m.pair of pipelines with steam pipeline from the fixed pillar of point 66 to the end of the fixed pillar of

    ClosedWorksRFB
  • Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699 (From the fixed pillar of point 125 to the end of the fixed pillar of point 183 with636m.pair of pipelines with s team pipeline)

    ClosedWorksRFB
  • Expansion and rehabilitation of 2F400/1F600mm 3G main pipeline to 2F700mm from TK-521 to TK-328

    ClosedWorksRFB
  • Expansion and rehabilitation of 2F800mm diameter 5A main pipeline to 2F1000mm from TPP-3 to the point 1699 (from point 12 to point 36 with 214 m.pair pipe lines with steam pipeline/ in the property of TPP-3)

    ClosedWorksRFB
  • Expansion and channeling 1.1km 4A heating main pipeline with a diameter of 2F250/350mm from point DH408 to point DH 436 to 2F400mm

    ClosedWorksRFB
  • Expansion and channeling 1.3km 4B heating main pipeline with diameter of 2F250/350mm from point DH 436 to point DH 221 to 2F400mm

    ClosedWorksRFB
  • Expansion of 9J heating main pipeline with a diameter of 2F250/300mm from point DH 994 to point DH 9107 to 2F400mm

    ClosedWorksRFB
  • Expansion of 9A,B heating main pipeline with a diameter of 2F400/500mmfrom point IZ 918 to point DH 935 (point 48) to 2F700mm

    ClosedWorksRFB
  • Expansion and rehabilitation of 12G heating main pipeline with diameter of 2F500mm from point DH1280 to point DH1286 to 2F700mm

    ClosedWorksRFB
  • Rehabilitation of old 6kW distribution facilities of "Industrial base" of UBDHC

    ClosedWorksRFB
  • Expansion and rehabilitation of heating network pressure pumping station no.7

    ClosedWorksRFB
  • UBDH Company's emergency call center and training room renovation

    ClosedWorksRFQ
  • Expansion and rehabilitation of 9G heating main pipeline from point TK-32 to point TK-10 behind TPP-2 (expansion of existing 2f400 mm diameter pipeline to 2F500 mm diameter)

    ClosedWorksRFB
  • Renovation work of the training room for improving and practicing the skills of maintenance workers and welders

    ClosedWorksRFQ
  • UBDHC data server equipment, installation, and maintenance of server room

    ClosedWorksRFQ
  • Expansion and rehabilitation of 9G heating main pipeline from point TK-32 to point TK-10 behind TPP-2 (expansion of existing 2f400 mm diameter pipeline to 2F500 mm diameter)

    ClosedWorksRFB
  • Establishment of a practical training room for improving and practicing the professional skills of heat pipeline and equipment repair workers and welders

    ClosedWorksRFQ
  • Completing the work of the main heat pipeline with a diameter of 2f800mm installed from fixed support 4 3 in the southwest of TPP2 to District Heating substation 1 8 in the direction of Moskva district and put into operatio

    ClosedWorksRFB
  • 9G main pipeline, expansion, and rehabilitation of the pipeline from point TK-32 to point TK-10 behind TPP-2 (expansion of existing 2Ф400 mm diameter without channel pipeline to 2Ф500mm diameter)

    ClosedWorksRFB
  • Construction of a new heat pipeline and Water Heat Transfer Center from the east side of the Narlag shopping center to the north-west side of the 6th micro district or the 28th school

    ClosedWorksRFB
  • Newly planned heating pipeline work from the south side of Solomon (e-mart) shopping center to Heat transfer Center No. 95 of OSNAAUG

    ClosedWorksRFB
  • Replacing and elevating the 1A main pipeline with a diameter of 2f400mmfrom point DH-116-A6 to point DH-116-A16, 0.578 km pair, from point DH116-А1 to point DH116-А2, 0.150 km pair, a total of 0.730 km pair

    ClosedWorksRFB
  • Expansion of the 2D main pipeline, 0.282 km p air of pipeline with a diameter of 2f250mm from DH-264 point to DH-269 point to 2Ф400mm

    ClosedWorksRFB
  • The replacement of the 6 kV constant speed pump on the return side of pressure boosting pump station No. 3 with a variable speed pump

    ClosedWorksRFB
Page 1 of 2