Procurement plan: every tender of the project

  • RAVISHANKAR DAM (RSP) -Supply erection testing & commissioning of new 30mtr Hot dipped galvanized high mast pole with 350watt LED flood light and repair with replacement and fixing LED fixture power cable and panel at 30mtr of 9nos existi

    PlannedWorksRFB
  • Ravishankar Dam(RSP)- Excavation in Spill channel, pilot channel, construction and repair of guide wall & construction of inspection road of Ravishankar Sagar Dam Gangrel

    PlannedWorksRFB
  • Ravishankar Dam (RSP) -Re sectioning of the disturbed dam profile as per design section, Resetting of disturbed u/s rip-rap/pitching, Repair of road, parapet wall s at dam top, Turfing on the d/s face of dam, construction of road dam top to gallery et

    PlannedWorksRFB
  • Ravishankar Dam (RSP)- Elastomeric polyurethane coating on masonry dam of Ravishankar Sagar Dam Gangrel

    PlannedWorksRFB
  • Ravishankar Dam (RSP)- Construction of breast wall in front of Head Regulator, Renovation of gauge well, Repair of damaged portion of bucket floor and end sil l and Protection work of Masonry Dam of Ravishankar Sag

    PlannedWorksRFB
  • Ravishankar Dam (RSP)- Treatment in inspection gallery to open all block ed seepage passages/ports/holes, including cleaning of calcification etc and minimize wherever excessive seepage is there in some of the passages/holes in seepage gallery

    PlannedWorksRFB
  • Ravishankar Dam (RSP)- Supply Erection , Testing & Commissioning of Automatic Remote control Panel PLC Panel/SCADA system CC TV Camera Guide Wave Radar system Type Water Level Sensor, Repair Replacing& Fixing of control Protective

    PlannedWorksRFB
  • Ravishankar Dam (RSP)-Work Of Lighting Arrangement Of Dam Top, Right & Left Guide Bund Garden Supply Installation, Testing &Commissioning Of Led Street Light Fixture, Pole, Cable, AB Cable, Sky Lift/Light Elevator At RSP Gangrel Dam.

    PlannedWorksRFB
  • Ravishankar Dam (RSP)- Repair & Fencing of 1600KVA, 33/11KV & 500KV A, 11/0.43 KV Sub Station with supply installation, Testing& commissioning of 1 No. 250 KVA, 11/0.43 KV new Sub Station and Alternative power supply system (125 & 160KV

    PlannedWorksRFB
  • Procurement of Consultancy Services for the Seismic Monitoring of Water Resources Department Da ms on Nomination Basis by Council of Scientific and Industrial Research - National Geo-Physical Research Institute (CSIR-NGRI), Hyderabad.

    Plannedpipeline.cat.individualDirect selection
  • DRIP Phase II- Construction of Dam Safety Headquarters PMG – Electrification of Block

    PlannedWorksRFB
  • Construction of Guest house and Control Room at Maniyar Head works

    PlannedWorksRFB
  • Engaging consultant for Implementation of Instrumentation in 16 Dams

    Plannedpipeline.cat.individualDirect selection
  • DRIP II - Supply installation Operation and maintenance of Surveillance system in 19 Dams under Irrigation Department.

    PlannedGoodsRFB
  • DRIP Phase II- Construction of Dam Safety Headquarters PMG – Air Conditioning of Blo

    PlannedWorksRFB
  • Reaming work for Instrumentation of Chulliyar Dam

    PlannedWorksRFB
  • Civil and Hydro-Mechanical package of Wa n project Tq. Telhara Dist. Akola (Rehabilitation, Improvement, and Basic Facility of W AN Dam in Akola District of Maharashtra under DRIP-II)

    PlannedWorksRFB
  • Civil and Hydro-Mechanical package of Dnyanganga Medium project Tq. Khamgaon Dist. Buldana (Rehabilitation, Improvement, and Basic Facility of DNYANGANGA Dam in Buldana District of Maharashtra under DRIP-

    PlannedWorksRFB
  • Rehabilitation, Improvement, and Basic Facility of SAPAN Dam in Amravati District of Maharashtra under DRIP-II

    PlannedWorksRFB
  • Dam safety works of Rehabilitation of Lower Wunna Wadgaon Dam under Dam Rehabilitation and Improvement Project, Taluka: Umred District: Nagpur of Maharashtra under DRIP-II

    PlannedWorksRFB
  • Electrical and Hydro-mechanical work of Rehabilitation of Lower Wunna Wadgaon Dam under Dam Rehabilitation and Improvement Project, Taluka : Umred District: Nagpur of Maharashtra under DRIP-II

    PlannedWorksRFB
  • Basic Dam Improvement work of Rehabilitation of Lower Wunna Wadgaon Dam under Dam Rehabilitation and Improvement Project, Taluka : Umred District: Nagpur of Maharashtra under

    PlannedWorksRFB
  • Rehabilitation, Improvement, and Basic Facility of Upper Wardha Dam in Amravati District of Maharashtra under DRIP-II(Civil Work, Mechanical works, Electrical works & Instrumentation w

    PlannedWorksRFB
  • Procurement of Laptops, desktops and printers for Dam Engineers and at SPMU

    PlannedGoodsRFQ
  • Surveying and preparation of drawings for existing dams and reservoirs, its appurtenant structures and location of Instruments position. -for dams in south zone ( Kallada,Maniyar Barrage, Bhootathankettu Barrage, Malankar

    PlannedNon-consulting servicesRFQ
  • Neyyar Dam - Surveying and preparation of drawings for existing dams and reservoirs, its appurtenant structures and location of Instruments position. - Pilot Project

    PlannedNon-consulting servicesRFQ
  • Surveying and preparation of drawings for existing dams and reservoirs, its appurtenant structures and location of Instruments position. -for dams in central zone ( Chimmoni, Vazhani, Peechi, Malampuzha, Kanjirappuzha, Chulliyar, Meenkara, Moolathar

    PlannedNon-consulting servicesRFQ
  • Surveying and preparation of drawings for existing dams and reservoirs, its appurtenant structures and location of Instruments position. -for dams in north zone ( Kuttiyadi, Karappuzha, Pazhassy)

    PlannedNon-consulting servicesRFQ
  • Engaging Architect for construction of Phase II of Dam Safety Headquarters

    PlannedConsultingQCBS
  • DRIP II - Engagement of Design Expert

    Plannedpipeline.cat.individualDirect selection
  • DRIP II - KIP Electrical Works- Lighting over dam and surrounding areas (saddle dam, weir, main gate etc)

    PlannedWorksRFB
  • Improvement to Domkutch Dam under DRIP- Phase-II

    PlannedWorksRFB
  • DRIP II - Purchase of Vehicle

    PlannedGoodsRFQ
  • Civil and Hydro-Mechanical works for rehabilitation of Kanher Dam Dist. Satara, Maharashtra

    PlannedWorksRFB
  • Supply, installation, testing, commissioning of instrumentation for Kanher Dam Dist. Satara, Maharashtra

    PlannedWorksRFB
  • Civil & Electrical works for rehabilitation of Koyana Dam, Dsit Satara, Maharashtra.

    PlannedWorksRFB
  • Supply, installation, testing, commissioning of Tiltmeter and Uplift Pressure Cell for Koyana Dam, Di st. Satara, Maharashtra.

    PlannedWorksRFB
  • Appointment of Procurement Consultant (Smt. Kirtee Phadke) for three months (can be extended as and when required) in SPMU Maharashtra

    Plannedpipeline.cat.individualDirect selection
  • DRIP II - Engaging Environmental and Social Consultancy Firm

    PlannedConsultingQCBS
  • Civil Package 1 for rehabilitation of Jayakwadi Dam, Paithan Dist. Aurangabad

    PlannedWorksRFB
  • Civil Package 2 for rehabilitation of Jayakwadi Dam, Paithan Dist. Aurangabad

    PlannedWorksRFB
  • Electrical Components for rehabilitation of Jayakwadi Dam, Paithan Dist. Aurangabad

    PlannedWorksRFB
  • Replacement of rubber seal of sluice and stop log gate of Retam Barrage under DRIP-II

    PlannedWorksRFB
  • Procurement of Furniture and Procurement of Laptop, Desktop and other IT Equipment etc.

    PlannedGoodsRFB
  • DRIP II - Karapuzha Dam - Soil test for reviewing the stability of existing earth dam and Soil investigation for river training wall - Investigation Work

    PlannedNon-consulting servicesRFQ
  • Package 1 –Civil Work Package of Manjra dam Dist. Beed (Rehabilitation, Improvement & Basic facilities of Manjra Dam in Beed Dist. of Maharashtra under DRIP

    PlannedWorksRFB
  • Increasing Surveillance during operations. (e.g. installation of CCTVs) Installation of 20 Cctv including installation costs in 1 dam for solar and V-sat (if no internet) Installation of cctvs including installation costs in 39 dams

    PlannedGoodsRFQ
  • Purchasing Internet under component B.1.4(e) of DRIP-II

    PlannedNon-consulting servicesRFQ
  • DRIP II - Detailed investigation of seepage at downstream of Malankara dam (MV IP) using tracer technique

    PlannedNon-consulting servicesRFQ
  • Hirring Agency for supplying ManPower ( Computer Operator, Sweeper) for Establishing a QA and QC system at QCD-2 Lucknow

    PlannedNon-consulting servicesRFQ