Philippines Digital Infrastructure Project
P176317 · Philippines · East Asia and Pacific · Financing: I, B, R, D, 9
Procurement plan: every tender of the project
Consultancy Services for Technical Feasibility Study (Assessments, design and qualitycontrol/supervision) Phase 1 and 2
PlannedConsultingQCBSConsultancy Services for Commercial Transactions Manual (Business model, sustainability model, drafting of bidding documents, assisting tender process) Phase 1 and 2
PlannedConsultingQCBSProcurement of Three (3) Units of Project Vehicle
PlannedGoodsRFQConsultancy Services for the Assessment for the Development of a Robust Cybersecurity Policy and Legal Framework
PlannedConsultingQCBSConsultancy Services for the Assessment, high-level design, preparation of bidding documents and TORs, supervision, and quality control for Network Security
PlannedConsultingQCBSConsultancy Services for the Assessment for the enhancement of Cybersecurity awareness and education and capacity building and training of CERTs and SOCs staff
PlannedConsultingQCBSMiddle Mile Level 2 (from DICTMetropolitan Points of Presence (mPoPs))
PlannedWorksRFBInternet Protocol/Multiprotocol Label Switching
PlannedGoodsRFBDesign and implementation for the enhancement of security in Government Critical Information Infrastructures (CII) primarily focusing on the backbone
PlannedWorksRFBProcurement of Construction of CERTs and SOCs.
PlannedWorksRFBProcurement of goods for CERT s and SOCs, including hardware and software purchases
PlannedGoodsRFBDetailed design, purchase, and build Last-Mile in Region XIII
PlannedWorksRFBDetailed design, purchase, and build Last-Mile in Region XI
PlannedWorksRFBEnvironmental Specialist
Plannedpipeline.cat.individual1 5-year Indefeasible Right of Use (IRU) for Domestic Submarine Dark Fiber Optic Cable Connectivity with Terrestrial Backhaul Links
PlannedNon-consulting servicesRFBProcurement Specialist
Plannedpipeline.cat.individualProcurement of Subscription to AI-Assisted Procurement Evaluation Platform for the Philippine Digital Infrastructure Project
PlannedNon-consulting servicesDirect selectionProcurement of Project Management and Implementation Support (Project Integrator Firm for PDIP)
Plannedpipeline.cat.individualDirect selectionRegional Cluster No. 1: Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Northern Mindanao and Caraga (Region 10 and Region 13)
AdvertisedWorksRFBAdvertised 2026-08-23
Estimate (Premium)Regional Cluster No. 2: Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Southern and Western Mindanao (Region 1 1 and Region 12)
AdvertisedWorksRFBAdvertised 2026-08-23
Estimate (Premium)Regional Cluster No. 3: Design and Build of the Phase 4 And 5 Middle Mile Level 1 Fiber Optic Cable for Western and Northern Mindanao (Regions 9 and BARMM)
AdvertisedWorksRFBAdvertised 2026-08-23
Estimate (Premium)Regional Cluster No. 4: Design and Build of the Phase 4 and 5 Middle Mile Level 1 Fiber Optic Cable for Central Eastern& Negros Visayas (NIR, Regions 7 & 8)
AdvertisedWorksRFBAdvertised 2026-08-23
Estimate (Premium)Telecom Facilities and Civil Works for the National Fiber Backbone Phases 4 and 5
AdvertisedWorksRFBAdvertised 2026-08-07
Estimate (Premium)Senior Regional Coordination and Implementation Support Consultant
Advertisedpipeline.cat.individualDirect selectionAdvertised 2026-07-09
Estimate (Premium)Network Infrastructure Planning, Engineering, and Quality Assurance Consultant
Advertisedpipeline.cat.individualDirect selectionAdvertised 2026-07-09
Estimate (Premium)Consultancy Services for Environmental and Social Infrastructure Assessments Phase 1 and 2
AdvertisedConsultingQCBSAdvertised 2026-03-11
Estimate (Premium)Environmental Specialist
Closedpipeline.cat.individualAdvertised 2026-03-12
Estimate (Premium)Social Development Specialist
Closedpipeline.cat.individualAdvertised 2026-03-12
Estimate (Premium)Advertised 2026-03-08
Estimate (Premium)Monitoring and Evaluation Specialist
Closedpipeline.cat.individualAdvertised 2026-01-16
Estimate (Premium)Advertised 2026-01-16
Estimate (Premium)Assistant Project Manager
Closedpipeline.cat.individualAdvertised 2026-01-16
Estimate (Premium)Detailed Design and Build of the National Fiber Backbone Phases 4 and 5
ClosedWorksRFBAdvertised 2025-11-21
Estimate (Premium)Procurement Specialist
Closedpipeline.cat.individualAdvertised 2025-10-16
Estimate (Premium)Connectivity Specialist
Closedpipeline.cat.individualAdvertised 2025-10-07
Estimate (Premium)Project Manager
Closedpipeline.cat.individualAdvertised 2025-08-26
Estimate (Premium)Financial Management Specialist
Closedpipeline.cat.individualAdvertised 2025-08-14
Estimate (Premium)Senior Procurement Specialist
Closedpipeline.cat.individualAdvertised 2025-08-14
Estimate (Premium)Detailed design, purchase, and build of the National Fiber Backbone (Phase 4 and 5)
ClosedWorksRFBMiddle Mile Level 1 (excluding towers and Microwave (MW) equipment)
ClosedWorksRFBDomestic Submarine Cable Network
ClosedNon-consulting servicesRFBCybersecurity Specialist
Closedpipeline.cat.individualProcurement of Project Management and Implementation Support (Project Integrator Firm for PDIP)
ClosedNon-consulting servicesDirect selection