Ethiopia Flood Management Project

P176327 · Ethiopia · Eastern and Southern Africa · Financing: I, D, A, E, 1

Governance & Public AdministrationConstruction & Civil WorksArchitecture & Engineering ServicesHumanitarian & Emergency ResponseEnvironment & ClimateWater & Sanitation
81 tenders in the planPlan updated 2026-08-1033 notices on BidsFactory · 0 open · 23 awardedProject page at the World Bank

Procurement plan: every tender of the project

  • Contract staff hiring for key the position of Embankment Engineer

    Plannedpipeline.cat.individual
  • Contract staff hiring for key the position of Communication specialist

    Plannedpipeline.cat.individual
  • Contract staff hiring for key the position of Project Accountant

    Plannedpipeline.cat.individual
  • Procurement of Video Cameras with accessories useful for recording features of site level activities and for efficient communication of E-FMP project of MoWE

    PlannedGoodsRFB
  • Procurement of two monitoring & mapping drones for flood-vulnerable areas of prior flood-prone river basins

    PlannedGoodsRFB
  • Consultancy service for annual environmental & social audit including validation workshop with relevant stakeholders

    PlannedConsultingCQS

    View noticeWinner: GETACHEW SIMEGN ENVIRONMENTAL CONSULTANCY SERVICES· Awarded 2026-07-31

  • Consultancy Services for the Construction Supervision and Contract Administration of the Different Structural Works in Rift Valley & Awash Basins

    PlannedConsultingCQS
  • Procurement of Structural works Construction On Flood Protection Projects to Improve Community Mobility and Water Access in the Middle and Lower Awash, in Various Lots within the Afar Region

    PlannedWorksRFB
  • Procurement of Flood Protection works in the downstream side of New Bridge for stabilization of Kulfo River of Arba Minch City

    PlannedWorksRFB
  • rocurement of Satellite-Derived Digital Terrain Model (DTM), DSM, and Orthophoto Products Under The Ethiopian Flood Management Project (EFMP)

    PlannedNon-consulting servicesDirect selection

    View noticeWinner: CONSTELLPORT PTE. LTD.· Awarded 2026-04-21Contract amount (Premium)

  • Procurement of Urgent Emergency Flood Protection Works for the removal of debris and boulders, including river dredging and sediment removal, from underneath the bridge and along the upstream and downstream sections of the Kulfo River in Arba Minch.

    PlannedWorksDirect selection

    View noticeWinner: MAMO MENGESHA GWWC (BOKUCON CONSTRUCTION)· Awarded 2026-05-07Contract amount (Premium)

  • Procurement of Mobile device and application software and installation for mobiles used for hydrological data collections

    PlannedGoodsRFB
  • Consultancy Services for Construction Supervision of Flood Protection Works Downstream of the New Bridge for Stabilization of the Kulfo River in Arba Minch City

    PlannedConsultingCQS
  • Procurement of Structural Works Construction on Flood Protection to Improve Community Mobility and Water Access in Various Lots in the Rift Valley

    PlannedWorksRFB
  • Procurement of Structural Works for Community Mobility Improvement, Water Access to Riverside Farmland, and Flood Protection Works in the Upper Awash under Various L

    PlannedWorksRFB
  • Procurement of hydrological instruments for hydrological data and forecasting

    PlannedGoodsRFB
  • Procurement of Civil works for Construction of Amibara Right side embankment works at Awash river Basin in different lots

    PlannedWorksRFB

    View notice

  • Consultancy Service for Supervision of Amibara Right side embankment works of Awash river Basin in different lots

    AdvertisedConsultingQCBS

    View notice

    Advertised 2026-06-30

    Estimate (Premium)
  • Consultancy service for Designing flash flood forecasting& early warning system for A wash, Wabishebele, Omo-Gibe, RVL & Genale dawa & system installation for selected areas in priority basins & Research based Operation of flash flood system & application

    AdvertisedConsultingQCBS

    View notice

    Advertised 2026-06-23

    Estimate (Premium)
  • Consultancy services for establishment of integrated hydrology early warning data sharing, development of of pilot models & information products for selected top priority hydrological services(Omo-Gibe, Awash & rift valley) and development of web portal

    AdvertisedConsultingQCBS

    View notice

    Advertised 2026-06-20

    Estimate (Premium)
  • Consultancy Service for Basin level study for strategic study basins to identify and prioritize physical flood risk reduction investments, feasibility study, and detailed design for prioritized investments (2basins-Genalle-Dawa and Wa

    AdvertisedConsultingQCBS

    View notice

    Advertised 2026-06-18

    Estimate (Premium)
  • Consultancy Service for Basin level study for strategic study basins to identify and prioritise physical flood risk reduction investments, and feasibility study for prioritized investments (2 basins-Abay and Baro-Akobo)

    AdvertisedConsultingQCBS

    View notice

    Advertised 2026-06-17

    Estimate (Premium)
  • Procurement of hydrologicaltelemeter devices for 100 ob serving hydrological stations and installation of equipment

    AdvertisedGoodsRFB

    Advertised 2025-11-17

    Estimate (Premium)
  • Consulting services for Integrated Advanced Project Management System, Contract Management System & OCR-Based Digitalization, AI-Powered Digital Archiving System and Advanced National KPI Management and Data Analytics System (ANKMDAS)

    AdvertisedConsultingQCBS

    Advertised 2025-11-17

    Estimate (Premium)
  • Consultancy service for Diagnostic of urban flood risk status and management at the country level

    AdvertisedConsultingQCBS

    Advertised 2025-05-09

    Estimate (Premium)
  • Selection and Employment of individual Consultant of Procurement specialist for the EFM of MoWE (Junior)

    Closedpipeline.cat.individual

    Advertised 2025-08-18

    Estimate (Premium)
  • Selection and Employment of individual Consultant of Contract Management Specialist for the EFM project (Supervision Advisor)

    Closedpipeline.cat.individual

    Advertised 2025-08-18

    Estimate (Premium)
  • Selection and Employment of Urban flood management specialist for the FMP of MoWE

    Closedpipeline.cat.individualQCBS

    Advertised 2025-08-04

    Estimate (Premium)
  • Selection and Employment of Senior Hydraulic Engineer for the EFM-Project Management Unit (PMU) of MoWE

    Closedpipeline.cat.individual

    Advertised 2025-03-31

    Estimate (Premium)
  • Contract staff hiring for key the position of Internal Auditor Specialist

    Closedpipeline.cat.individual

    Advertised 2025-03-25

    Estimate (Premium)
  • Selection and Employment of Individual consultant (IC) – Contract Management Specialist for the ET-Flood Management Project -Management Unit (PMU)

    Closedpipeline.cat.individual

    Advertised 2025-03-18

    Estimate (Premium)
  • Selection and Employment of Independent procurement Audit service for three years procurement Audit (2016-2018 Ethiopian Physical years) for Ethiopia Flood Management Project (E-FMP) (P-176327)

    ClosedConsultingQCBS

    Advertised 2025-01-24

    Estimate (Premium)
  • Selection and Employment of Senior Flood Risk Management Technical Team Leader for the FMP of MoWE

    Closedpipeline.cat.individual

    Advertised 2025-01-23

    Estimate (Premium)
  • Selection and Employment of Procurement specialist for the FMP of MoWE

    Closedpipeline.cat.individual

    Advertised 2025-01-22

    Estimate (Premium)
  • Selection and employment of Project Coordinator individual consultant for PMCU to be implemented by MOWE

    Closedpipeline.cat.individual

    Advertised 2024-12-20

    Estimate (Premium)
  • Consultancy service for Basin level study for Rift valley to identify and prioritise physical flood risk reduction investments and conceptual design, detailed design, bidding document of selected physical investments (not including su

    ClosedConsultingQCBS

    Advertised 2024-09-16

    Estimate (Premium)
  • Consultancy service for Basin level study for Omo to identify and prioritise physical flood risk reduction investments and conceptual design, detailed design, bidding document of selected physical investments (not including supervision of civil work)

    ClosedConsultingQCBS

    Advertised 2024-09-16

    Estimate (Premium)
  • Selection and Employment of Financial Management specialist for the FMP of MoWE

    Closedpipeline.cat.individual

    Advertised 2024-09-10

    Estimate (Premium)
  • Procurement of Awash River bed dredging/widening and related works in lower Awash- Asayta and Afambo woredas under fast track approach before the flood period

    ClosedWorksRFB

    Advertised 2024-05-24

    Estimate (Premium)
  • Procurement of Awash River bed dredging/widening and related works in Upper Awash- Illu, Ejire, Sebeta Hawas, Dawo, Ejeresa lefo, Bora and Liben Chikala woredas under fast track approach before the fl

    ClosedWorksRFB

    Advertised 2024-05-24

    Estimate (Premium)
  • Procurement of River bed dredging/widening and related works in Middle Awash - Amibara, Dulessa, Gewane and Gelehalo woredas under fast track approach before the flood period

    ClosedWorksRFB

    Advertised 2024-05-24

    Estimate (Premium)
  • Procurement of Office Furniture (Tables, Chairs, Shelves)

    ClosedGoodsRFQ

    Advertised 2024-05-02

    Estimate (Premium)
  • Selection and Employment of Financial Management specialist for the EFM-Project Management Unit (PMU) of MoWE

    Closedpipeline.cat.individual

    Advertised 2024-01-19

    Estimate (Premium)
  • Selection and Employment of Social Specialist for the EFM-Project Management Unit (PMU) of MoWE

    Closedpipeline.cat.individual

    Advertised 2023-12-13

    Estimate (Premium)
  • Selection and Employment of Environmental specialist for the EFM-Project Management Unit (PMU) of MoWE

    Closedpipeline.cat.individual

    Advertised 2023-12-13

    Estimate (Premium)
  • Selection and Employment of Monitoring, Evaluation and reporting officer for the EFM-Project Management Unit (PMU) of MoWE

    Closedpipeline.cat.individual

    Advertised 2023-12-13

    Estimate (Premium)
  • Selection and Employment of Senior Hydrologist for the EFM-Project Management Unit (PMU) of MoWE

    Closedpipeline.cat.individual

    Advertised 2023-12-13

    Estimate (Premium)
  • Procurement of office equipment (computers, printers, laptops, accessories etc.) for Ethiopian Flood Management Project PMU staff

    ClosedGoodsRFQ

    Advertised 2023-12-07

    Estimate (Premium)
  • Selection and Employment of individual Consultant of Procurement specialist for the EFM-Project Management Unit (PMU) of MoWE

    Closedpipeline.cat.individualDirect selection

    Advertised 2023-11-22

    Estimate (Premium)
  • Selection and Employment of individual Consultant for security risk assessment study for the Ethiopia Flood Management Project by MoWE

    Closedpipeline.cat.individual

    Advertised 2023-08-31

    Estimate (Premium)
Page 1 of 2