Costa Rica Climate Resilient Recovery and Territorial Development Project
P178049 · Costa Rica · Latin America and Caribbean · Financing: I, B, R, D, 9
Procurement plan: every tender of the project
Purchase of mobile and transportable weather radars
PlannedGoodsRFBRadiosondes and meteorological balloons
PlannedGoodsRFBConsulting firm to develop the terms of reference for preliminary studies, architectural and engineering design of the CNE COE building
PlannedConsultingQCBSTechnical studies Comprehensive project for flood control in the lower basin of the Parrita River and flood control of the Sarapiqui and Sucio River basins
PlannedConsultingQCBSConstruction of protection works on the Turrialba River
PlannedWorksRFBProfessional services for the assessment of infrastructures that will function as accommodation sites in emergency response shelters
PlannedConsultingQCBSTechnical studies and design for protection works on Tuis, Platanillo, Sixaola Rivers
PlannedConsultingQCBSDesign and construction of protection works on the banks of the En Medio Rivers, sector of Barrio Estocolmo and Residencial Corobici 2 San Juan, sector La Lechuza
PlannedWorksRFBProtection works on the Banano River and its tributary Aguas Zarcas River
PlannedWorksRFBTechnical studies for the Design and construction of bridges over Lari River, Korbli Stream, Utsi River, Shirolito River, Pepo Stream and Hone Creek River
PlannedConsultingLCSPurchase and installation of meteorological and hydrological stations
PlannedGoodsRFBTopographic survey for protection works on the Colorado River channels and its tributaries, sectors Viquillas, Rio Claro, Coto, Caracol, Rio Nuevo, Rio Colorado, Conte, Corredores Neilly, Coto 47, Coto 50 51, 59
PlannedConsultingQCBSDesign and construction of flood control works in the lower basin of the Zapote River, Upala
PlannedWorksRFBConstruction of protection works on the Zent Chirripo and Chirripo Matina Rivers
PlannedWorksRFBTechnical studies and design of the CNE COE building
PlannedConsultingQCBS