Cameroon Water Security Project
P180321 · Cameroon · Western and Central Africa · Financing: I, D, A, 7, 7
Procurement plan: every tender of the project
Supply of operating materials, equipment and tools to CAMWATER
PlannedGoodsRFBSupply of IT equipment and office furniture in two (02) lots
PlannedGoodsRFBAcquisition and installation of the tom2pro software for the accounting of the SEWASH CAMWATER project
PlannedGoodsRFQAcquisition of IT and office equipment, IT consumables, computer software and office supplies under emergency procedure
PlannedGoodsRFQRecruitment of a consultant responsible for the supervision and control of the rehabilitation, strengthening and extension works of the drinking water supply systems of the city of Yaoundé
PlannedConsultingQCBSDesign, Supply and Installation of a modern workshop for the reconditioning of electromechanical and electrical equipment and the calibration of meters at the General Directorate – CAMWATER in Douala
PlannedWorksRFBSubscription of insurance services in the context of carrying out the activities of UTE-SEWASH (one firm year and three conditional years)
PlannedNon-consulting servicesRFBAcquisition and configuration of the TOM2PRO multi-site, multi-station and multi-project software including user training and support at the SEWASH Project Management Unit
PlannedGoodsRFQAcquisition de cinq (05) véhicules pick-up double cabine 4x4 pour l'Unité de Gestion du Projet SEWASH
PlannedGoodsDirect selectionSupply and installation of IT and office equipment, computer software, communication equipment and videoconferencing equipment and systems with installation accessories at the UGP SEWASH in four (04) lots
PlannedGoodsRFBSupply and installation of office equipment and furniture at the SEWASH Project Management Unit in two (02) separate lots
PlannedGoodsRFBSelection of a security company for the surveillance of persons, property and premises of the Water Security Project Management Unit in Cameroon (SEWASH)
PlannedNon-consulting servicesRFQRecruitment of an independent audit firm for the financial and accounting audit of the Project for two fiscal years (2026 and 2027)
PlannedConsultingLCSRecruitment of an independent verification agent for PBCs for two fiscal years (2026 and 2027)
PlannedConsultingLCSRecruitment of a consultant responsible for the supervision and control of the design, supply and installation works of a modern workshop for the reconditioning of electromechanical equipment and calibration
PlannedConsultingQCBSRecruitment of a consultant responsible for the supervision and control of the construction and turnkey equipment works of an R+2 building housing the offices of UTE SEWASH
PlannedConsultingQCBSRecruitment of a consultant for the accounting and financial audit for the years 2026, 2027 and 2028
PlannedConsultingLCSMaintenance service for raw water electro-pump units at Akomnyada and rehabilitation of tanks for the SA classic unit
PlannedNon-consulting servicesRFBRehabilitation, strengthening and extension of the drinking water supply system in the cities of Yaoundé
PlannedWorksRFBRehabilitation, strengthening and extension of the drinking water supply system in the cities of Douala
PlannedWorksRFBTurnkey construction and equipping of an R+2 building housing the UTE SEWASH offices
PlannedWorksRFBSubscription of an annual health insurance policy for the staff of the SEWASH Project (UGP and local unit) and their dependents
PlannedNon-consulting servicesRFQRecruitment of a Project Management Consultancy for the control and supervision of the construction works of 30 mini drinking water supply systems and 758 institutional ecological latrines in the rural areas of the Adamaoua region
PlannedConsultingQCBSRecruitment of a Project Management Consultancy for the control and supervision of the construction works of 30 mini drinking water supply systems and 870 institutional ecological latrines in the rural areas of the North region
PlannedConsultingQCBSRecruitment of a Project Management Consultancy for the control and supervision of the construction works of 43 mini drinking water supply systems and 1272 institutional ecological latrines in the rural areas of the Far North region
PlannedConsultingQCBSRecruitment of a consultant responsible for the supervision and control of the rehabilitation, strengthening and extension works of the drinking water supply systems of the city of Douala
PlannedConsultingQCBSRecruitment of a consultant for the design of the SEWASH-CAMWATER project monitoring and evaluation system
PlannedConsultingQCBSConvention de financement au bénéfice de la NASLA pour la formation des cadres et agents des CTD et Communes en charge de de l’exploitation et la gestion des Centres concédés par la CAMWATER, aux métiers de l’eau et de l’assainissement
Plannedpipeline.cat.individualDirect selectionSupply and installation of security systems (cameras and video surveillance, intrusion detection system, electronic access control) and communication networks (internet) in the premises of the UGP SEWASH in two (02) lots
PlannedGoodsRFQRecruitment of a consulting firm for the development of the Master Plan for Drinking Water Supply in Rural Areas (SDAEP-MRU)
PlannedConsultingQCBSRecruitment of a consulting firm for the development of the Master Plan for Liquid Sanitation
PlannedConsultingQCBSRecruitment of a consulting firm for the completion of complementary studies on seven (07) sites of hillside dams in the North region (Muzeké; Babanguel, Darpata, Dembo, Djeck-Djeck, Mousgoy, Bassira)
PlannedConsultingQCBSRecruitment of a Firm for the technical, economic, financial, environmental and social studies for the construction of Faecal Sludge Treatment Plants in the Adamaoua, Far North and North regions
PlannedConsultingQCBSSupply and installation of air conditioners and blinds in the premises of the SEWASH Project Management Unit
PlannedGoodsRFQSupply and commissioning of a generator set with accessories at the SEWASH Project Management Unit
PlannedGoodsRFQConstruction of 30 resilient mini drinking water supply systems from submersible pumps powered by solar systems with storage batteries in the rural areas of the Adamaoua region
PlannedWorksRFBConstruction of 2,900 institutional ecological latrines (markets, schools, churches, mosques, etc.) in the rural areas of the Adamaoua, North and Far North regions in 03 separate lots
PlannedWorksRFBAcquisition of IT consumables and office supplies at the SEWASH Project Management Unit in two (02) separate lots
PlannedGoodsRFQCarrying out maturation studies for a modernization program for the development of SAEPs in the urban and peri-urban area for phase 2 of the SEWASH project and updating the ESAs of the Douala SAEP reconfiguration project
PlannedConsultingQCBSUpdating Study of the Urban and Peri-urban Hydraulics Master Plan of Cameroon (PDHUPC)
PlannedConsultingQCBSImplementation of a deployment model for participatory connections at CAMWATER
PlannedConsultingQCBSStudy for the Implementation of a monitoring system for surface water resources
PlannedConsultingQCBSImplementation of an economic and financial model at CAMWATER
PlannedConsultingQCBSSubscription of an annual comprehensive automobile insurance policy for 05 (five) vehicles at the Water Security Project Management Unit in Cameroon (SEWASH)
PlannedNon-consulting servicesRFQConstruction of 73 resilient mini drinking water supply systems from submersible pumps powered by solar systems with storage batteries in the rural areas of the North and Far North regions in 02 separate lots
PlannedWorksRFBRecrutement d'un consultant pour la réalisation de l'audit comptable et financier des exercice 2029, 2030 et période de grâce
PlannedConsultingLCS