Sierra Leone Water Security and WASH Access Improvement Project

P507588 · Sierra Leone · Western and Central Africa · Financing: I, D, A, E, 5

Water & SanitationGovernance & Public AdministrationConstruction & Civil WorksMonitoring, Evaluation & LearningSecurity, Defense & JusticeEnergy & Power
41 tenders in the planPlan updated 2026-11-1220 notices on BidsFactory · 0 open · 12 awardedProject page at the World Bank

Procurement plan: every tender of the project

  • Supply and Installation of Accounting Software and the Training of Project staff

    PlannedNon-consulting servicesRFQ
  • Upgrading the exciting Engineering Design and Management Systems (EDAMS)

    PlannedNon-consulting servicesRFP
  • Consultancy Service for Asset Inventory Systems ( Updating GIS Mapping)

    PlannedConsultingLCS
  • Consultancy Service to study the potential to increase the Micro hydro power generation of Guma and to develop floating solar power generation, dam, kongo Dam, Babadorie

    PlannedConsultingLCS
  • Upgrading the Babadorie Water Treatment Plant and rehabilitation of service reservoir s and pumping station

    PlannedWorksRFB
  • Consultancy Service for Construction Supervision of priorities investment in urban water service ( Angola Reservoir and Upgrading of Babadorie Water Treatment Plant)

    PlannedConsultingLCS
  • Consultancy Service for the Development of Suitable Design, and Standards for WASH Infrastructure that are Energy Resilient

    Plannedpipeline.cat.individual
  • Consultancy Service for Capacity assessment and develop comprehensive institutional and staff capacity building Plan for each sector

    PlannedConsultingQCBS
  • Consultancy Service to prepare for parallel performance based PPPs, to install water meters, to generalize metering and reduce NRW reduction in GVWC service area

    PlannedConsultingQCBS
  • Consultancy Service for the Development of Training programs, material , manual and curriclum for entry level staff

    PlannedConsultingLCS
  • Consultancy Service to assess PPP options to leverage private sector value addition to improve the quality of service and to extend access to WASH Service in Sierra Leone

    PlannedConsultingQCBS
  • The Supply of Data Collection Equipment S/N Equipment/Item Quantity 1 Tablet (Android) 100 2 Power Bank 100 3 Dip meter 18 4 Solar torchlight 100 5 Database management software 1 6 Laptops 16 7 Data boundle 10000(mbps)

    PlannedGoodsRFQ
  • Procured and Installed Hydrological Monitoring Equipment, Water Quality Equipment and Regents

    PlannedGoodsRFB
  • Construction of WASH Administrative Building including a National Water Quality Lab

    PlannedWorksRFB
  • Consultancy Service for the Development of WASH Sector M&E Framework

    Plannedpipeline.cat.individual
  • Consultancy Service for the Establishment of the WASH Sector Information Management System Platform.

    PlannedConsultingQCBS
  • The provision of Environmental, Social Impart Assessment and Design, Construct, Operate Resilient Fecal Sludge Treatment Plant in the Eastern Part of Freetown and WARD C, Western Rural District, Upgrading the King tom Plant and the Construction of 48 Toi

    PlannedWorksRFP
  • Procurement and Installation of 23,000 Smart Meters

    AdvertisedGoodsRFB

    View notice

    Advertised 2026-09-01

    Estimate (Premium)
  • Consultancy Service for City Wide Sanitation for WARD C and FCC

    AdvertisedConsultingQCBS

    View notice

    Advertised 2026-08-26

    Estimate (Premium)
  • Construction of 60,000m3 raw water storage for the Angola WTP.

    AdvertisedWorksRFB

    View notice

    Advertised 2026-08-17

    Estimate (Premium)
  • Development and Implementation of a Knowledge Management System

    AdvertisedNon-consulting servicesRFP

    View notice

    Advertised 2026-07-29

    Estimate (Premium)
  • Consultancy Service for National Raw Water Resource Master Plan

    AdvertisedConsultingQCBS

    View notice

    Advertised 2026-07-28

    Estimate (Premium)
  • Consultancy for a Behavior Change Study, Developing a Behavior Change Communication (BCC) Strategy and Implementation Plan (CLEAN AND GREEN SALONE)

    AdvertisedConsultingQCBS

    Advertised 2026-07-23

    Estimate (Premium)
  • Consultancy Service for Topographic Survey, Ge technical Investigation, Detailed Architectural and Engineering Design and Construction Supervision

    AdvertisedConsultingLCS

    Advertised 2026-07-10

    Estimate (Premium)
  • Construction of protective barriers, catchment and effective monitoring systems in five critical sub catchment in the Western Area

    AdvertisedWorksRFB

    View noticeWinner: 3M DEVELOPMENT AND CONSTRUCTION· Awarded 2026-08-03Contract amount (Premium)

    Advertised 2026-05-18

    Estimate (Premium)
  • Supply , Delivery, Maintenance of 8 Water Bowers

    AdvertisedGoodsRFB

    View noticeWinner: CHRISTTALINE ENTERPRISEContract amount (Premium)

    Advertised 2026-05-18

    Estimate (Premium)
  • Consultancy Service for Gum a Full Inspection and Dam Safety Assessment, Feasibility Study, Detailed Design and Preparation of Tender Documents for the Rehabilitation and Upgrading/Heightening of Guma Dam including Diversion of Upper Sussex

    AdvertisedConsultingQCBS

    Advertised 2026-05-07

    Estimate (Premium)
  • Consultancy Service Feasibility Study, detailed design and preparation of tender document for the toothik and Kongo Dam, WTP and related transmission and distribution

    AdvertisedConsultingQCBS

    Advertised 2026-05-07

    Estimate (Premium)
  • Consultancy Service to review , complete and consolidate existing sector policies and regulation to ensure that they contribute to delivering on WASH priorities

    AdvertisedConsultingQCBS

    Advertised 2026-05-05

    Estimate (Premium)
  • Procurement Leakage detection Equipment

    AdvertisedGoodsRFB

    View noticeWinner: A A ENTERPRISE JV WITH INFINITI· Awarded 2026-08-18Contract amount (Premium)

    Advertised 2026-04-16

    Estimate (Premium)
  • Consultancy Service for the Establishment of the WASH Sector Information Management Systems Platform

    ClosedConsultingCQS

    Advertised 2026-08-20

    Estimate (Premium)
  • Procurement and Delivery of Six Vehicles

    ClosedGoodsRFB

    View noticeWinner: RAAL TRADING COMPANY· Awarded 2026-08-03Contract amount (Premium)

    Advertised 2026-05-28

    Estimate (Premium)
  • Procurement of 18 computers (12 laptops and 6 desktops) and Accessories for Implementing Agencies and Partners(MWRS-6, Guma-2, FCC-2, WARD C-2, NWRMA-2, SALWACO-2 and EWRC-2) and 8 printers/ photocopiers/scanners (MWRS-2, Guma-1, FCC-1, WA

    ClosedGoodsRFQ

    View noticeWinner: ALTITUDE LOGISTICS COMPANY· Awarded 2026-05-06Contract amount (Premium)

    Advertised 2026-04-07

    Estimate (Premium)
  • Procurement of office furniture

    ClosedGoodsRFQ

    View noticeWinner: ESS BEE INTERNATIONAL LIMITED· Awarded 2026-05-04Contract amount (Premium)

    Advertised 2026-04-01

    Estimate (Premium)
  • Procurement of 22 Motor bikes for the Implementing Agencies under the project

    ClosedGoodsRFQ

    View noticeWinner: NYAMBE ENTERPRISE· Awarded 2026-04-28Contract amount (Premium)

    Advertised 2026-03-23

    Estimate (Premium)
  • The Supply and Installation of Accounting Software and the Training of Accounting Staff for the Project

    ClosedNon-consulting servicesRFQ

    View noticeWinner: DISS DEVELOPMENT ET SYSTEMES DE SUIVI· Awarded 2026-03-05Contract amount (Premium)

    Advertised 2025-12-01

    Estimate (Premium)
  • Construction of 60,000M3 raw water storage for the Angola WTP

    ClosedWorksRFB
  • The Development of a National water resources master plan. including updating the national inventory of ground and surface water abstraction

    ClosedConsultingQCBS
  • Consultancy Service for Environmental, Social Impart Assessment for Freetown City Council and WARD C

    ClosedConsultingQCBS
  • Design, Construct, Operate Resilient Fecal Sludge Treatment Plant in the Eastern Part of Freetown and WARD C, Western Rural District, Upgrading the King tom Plant and the Construction of 48 Toilets for F CC & 50 Toilets for WARD C (

    ClosedWorksRFP
  • Design, Construct, Operate Resilient Fecal Sludge Treatment Plant in the Eastern Part of Freetown and WARD C, Western Rural District, Upgrading the King tom Plant and the Construction of 48 Toilets for F CC & 50 Toilets for WARD C (

    ClosedWorksRFP