Resilient Action for Development and Disaster Recovery Himachal Pradesh
P513815 · India · South Asia · Financing: I, B, R, D, 9
Procurement plan: every tender of the project
Selection of consultancy services :to engage non transport sector(Building) Technical Consultants to provide specialized engineering and advisory support to the PIU house d in HPPWD Shimla for the effective delivery of the READY
PlannedConsultingCQSACTIVITY 342 (NIRMAND)Periodic Maintenance of N ore to Luhri road (MDR-120) KM 0/000 to 65/765 (SH:- Providing annual surfacing including surface correction with WBM grading-3 and providing and applyin
PlannedRFB(ACTIVITY No. 2, Man di II, RF )A.M.P. for Parla Kasan Rachhera Harizan Basti road (Village road) Km 0/00 to 1/00 & 2/00 to 3/00, Roda Nallah to Karkoh road (Village road) Km 4/00 to 5/00 an 6/00 to 8/00, and Madan Ka Ghar to Samar
PlannedRFB(ACTIVITY No. 3 Sun der Nagar Division ) AMP on Sundernagar to Malohroad km 0/0 to5/565 (SH:- Providing and laying 25 mm. thick Mix seal surfacing in km 3/0 to
PlannedRFBACTIVITY No 4 (Sunder Nagar Division) AMP on Jachh Prechhi road km 0/0 to 8/00 (SH:- Repair of pot hole BUSG & Providing and laying 25 mm thick bituminous concrete in km 4/0 to 8
PlannedRFBACTIVITY No-6(Nerchowk)AMP on Majhiali Kothi Gehri road,Talyahad Sarkaghat road and Reur Duragapur road(SH:- P/L25mm thick BC on Majhiali to Kothi Gehri road km1/0to4/0 Talyahad Pingla Thona Sarkaghat road km16/0to17/0 a
PlannedRFBACTIVITY- 7 (KARSOG DIVISION) Periodical Maintenance on Shimla Mandi road via Tattapani (Sub Head:- P/L Tack Coat, B.C. 25 mm and Thermoplastic Paint in Km. 57/00 to 59/00)& Periodical Maintenance on Chamunallah to Bagsha
PlannedRFBACTIVITY NO 10 (KARSOG) Periodical Maintenance on Churag to Kalti road, (Sub Head:- Providing and laying Tack coat, B.C. 25 mm and Thermoplastic paint Km. 2/00 to 3/00) and Chindi Bakhras road (Sub Head:-
PlannedRFBACTIVITY 13 (JANJHELI)Periodical Maintenance on Mandi Gagal Chail Janjehli Chhatri Ranabag Nagan road Km. 0/00 to 82/00 (SH;- Providing and Laying 25 mm thick bitumen concrete in Km. 4 3/00 to 44/00,45/00 to 46/00
PlannedRFBACTIVITY 14 (JANJEHLIA) NAME OF WORK Periodical Maintenance on Bags aid Murhag road Km. 0/00 to 5/00 (SH;- Providing and Laying 25 mm thick bitumen concrete in Km. 2/00 to 5/00)
PlannedRFBACTIVITY 15 (JHANJELI)NAME OF WORK Periodical Maintenance on Leh Tahchroad Km. 0/00 to 9/00 (SH;- Providing and Laying 25 mm thick bitumen concrete in Km. 0
PlannedRFBACTIVITY 17 (THALOUT) Periodical maintenance on Sansoi to Kashana road km 0/0 to 6/250 (SH- Providing and laying pre mix carpet 25 mm thick in
PlannedRFBACTIVITY 18 (MANDI I) NAME OF WORK:- Periodic maintenance of Padhar Nauhli Uperli road(HP0804MDR05630402-03) MDR Roads under Annual maintenance Plan for the year 2025-26. (SH:- Providi
PlannedRFBACTIVITY 20 (MANDI I) Periodic maintenance of Bhiuli Tabela Skore road (SH:- Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplasti
PlannedRFBACTIVITY 22 (BAIJNATH)Periodic maintenance of Tibtian Colony Bir Keori Road (SH: Providing and laying bituminous concrete 25 mm thick tack coat, thermoplastic strip and re
PlannedRFBACTIVITY NO 101 (GHUMARWIN)Annual Maintenance Plan for the year 2025-26 (PMGSY Road) on Trauntra to Barota road km 0/00 to 2/00 (SH:-Providing and laying 25mm thic
PlannedRFBACTIVITY NO 102 (GHUMARWIN)Annual Maintenance Plan for the year 2025-26 (PMGSY Road) on Bhadrog to Upper Bhadrog road km 2/00 to 2/600 (SH:-Providing and laying 25mm thick Bitumin
PlannedRFBACTIVITY 104 (GHUMARWIN)Annual Maintenance Plan for the year 2025-26 (MDR Road) on Ghumarwin to Talai road km 0/00 to 4/00 (SH:-Providing and laying 25mm thick Bituminous Concrete including rep
PlannedRFBACTIVITY 201 (DEHRA )Periodic Renewal on Kaloha Pragpur Dhaliara Dadasiba Sansarpur Terrace Road for the Year 2025-26 under MDR (SH: P/L 30mm thick Bituminous Concrete with Paver Finisher in KM 1 0/00 to 11/00, 11/00 to 11/
PlannedRFBACTIVITY 105 (GHUMARWIN)Annual Maintenance Plano n link road Barota to Kudi Ghat km 0/00 to 1/00 and Karot Dibla Ropari road km 2/00 to 2/500 (SH:-Providing and laying 25mm thic
PlannedRFBACTIVITY 202 (JAWALAMUKI) Periodic Renewal on Kural Dhatti Parmala road for the year 2025-26 under village Road (SH:- Providing and laying 25mm thick bituminous concrete with Paver Finish
PlannedRFBACTIVITY 106 (UNA) Periodical maintenance Una-Aghar Barsar Jhau Bhambla Nerchowk km 0/0 to 2/0) (SH:-P/L 25 mm thick BC, edge line & Zebracrossing, Cat eyes)
PlannedRFBACTVITY 203 (JAWALAMUKHI) NAME OF WORK: Periodic Renewal on Tip Uperala to Tip Bullah road for the year 2025-26 under village Road (SH:- Providing and laying 25mm thick bituminous concrete with Paver Finisher in Km 2/00 to 2/500).
PlannedRFBACTIVITY 107 (UNA) Periodical maintenance link road to village Fatehpur 0/0 to 0/700( SH:- P/L 25 mm thick BC, edge lines & cat
PlannedRFBACTIVITY 23 (BAIJNATH DIVISION) Periodic maintenance of Sansai Chobinroad (Link road to Patel Nagar road) (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and re
PlannedRFBACTIVITY 24 (BAIJNATH)Periodic maintenance of Pantehar to Manghlota Road (SH: Providing and laying bituminous concrete 25 mm thick tack coat, thermoplastic strip and repair of
PlannedRFBACTIVITY 25 (BAIJNATH)Periodic maintenance of road from Gadiara to Madho Nagar (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 10/700 t
PlannedRFBACTIVITY 26 (BAIJNATH)Periodic maintenance of Gowal Tikkar to Suhru Road (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of po
PlannedRFBACTIVITY 27 (BAIJNATH)Periodic maintenance of Mahalpatt to Talashan road (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of po
PlannedRFBACTIVITY 204 (JAWALMUKHI) NAME OF WORK: Periodic Renewal on Gahlian to Rajol Palai road for the year 2025-26 under village Road (SH:-Providing and laying 25m
PlannedRFBACTIVITY 28 (BAIJNATH)Periodic maintenance of D harer to Sansal via Panjala Road (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair
PlannedRFBACTIVITY 29 (BAIJNATH)Periodic maintenance of Bahi Rangher via Chobu Nagehar Krishana Nagar (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic
PlannedRFBACTIVITY 108 (UNA) Periodical maintenance on Bharolian Badehar Charatgarh road km.0/0 to 4/200 ( SH:-P/L 25 mm thick BC, edge lines & cat eyes)
PlannedRFBACTIVITY 205 (JAWALAMUKHI) Periodic Renewal on Jamuli to Basdi road for the year 2025-26 under village Road (SH:- Providing and laying 25mm thick bituminous concrete with Pav
PlannedRFBACTIVITY 30 (BAIJNATH)Periodic maintenance of Link road to Village Dhandole Road (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repai
PlannedRFBACTIVITY 31 (BAIJNATH)Periodic maintenance of R akkar Sagoor Tikkari Road HP0411VR0052 (SH: Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip
PlannedRFBACTIVITY 109 (UNA) Periodical maintenance on link road to Harijan basti village Dehlan km.0/0 to 1/0( SH:- P/L 25 mm thick BC with waste plastic additive, edge lines & cat eyes)
PlannedRFBACTIVITY 206 (JAWALAMUKHI) NAME OF WORK: Periodic Renewal on Nahllian Pihri Bhagrolu Da Ghatta road for the year 2025-26 under village Road (SH:- Providing and laying 25mm thick bituminous concrete with Paver Finisher in Km 4/000
PlannedRFBACTIVITY 32 (BAIJNATH)Periodic maintenance of Kangoo Da Proh Salehra Road (SH: Providing and laying bituminous concrete 25 mm thick tack coat, thermoplastic strip and repair of
PlannedRFBACTIVITY 110 (UNA) Periodical maintenance on Dehlan to Basdehra road km.0/0 to 1/0 & 1/0 to 1/55 0) ( SH:- P/L 25 mm thick B C, edge lines & cat eyes)
PlannedRFBACTIVITY 33 (JOGINDER NAGAR) Periodical Maintenance of Sandha Pattan Lad Bharol Basahi Banwar Kotli Road HP0801MDR05728150 under Annual Maintenance Plan 2025-26 Major District Road (SH:- Providing and laying built-up spray grout, Take Coat, Bit
PlannedRFBACTIVITY 111 (UNA) Periodical maintenance on Bangarh Nangran road km .0/0 to 3/0 ( SH:-P/L 25 m m thick BC, edge lines & c at eyes)
PlannedRFBACTIVITY 112 (UNA) Periodical maintenance on Basoli Chattara road km.0/590 to 1/0 & 1/0 to 2/0 ) (SH:- P/L 25 mm thick BC,edge lines & cat eyes)
PlannedRFBACTIVITY 208 (JAWALAMUKHI)Periodic Renewal on Surani to Gandwal road for the year 2025-26(SH:-Providing and laying 25mm thick bituminous concrete with Paver Finisher in K
PlannedRFBACTIVITY 113 (BHARWAIN)Periodical Renewal coat 25 mm thick Bituminous Concrete with paver on link road Gondpur to Jandoh Kude t Km. 1/0 to 1/200 for the ye
PlannedRFBACTIVITY 36 (JOGINDER NAGAR) Periodical Maintenance of Machhyal to Bata Ri Bihunroad (SH:- Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 4/
PlannedRFBACTIVITY 210 (KOTLABEHAR) Periodic Renewal for the year 2025-26 on Kaloha Pragpur Dhaliara Da da Siba Sansarpur Terrace road, MDR-046 (SH: Providing and laying 25mm thick bituminous concrete in Km
PlannedRFBACTIVITY 211 (KOTLABEHAR) Periodic Renewal for the year 2025-26 on Rakkar Chaplah upper Bharol i Tikker Shantla road, MDR -103 (SH: Providing and laying 25mm bituminous co
PlannedRFBACTIVITY 40 (BAJNAR)Annual Maintenance Plan for the Year 2025-26 on Bhuntar to Garsa road Km. 0/0 to 14/0. ( SH :- P/L Grade-III, tack coat, Bituminous concrete 25mm thick and road marking with hot applied thermoplastic compound in Km.3/0 to 5/0
PlannedRFBACTIVITY 41(BANJAR)Annual Maintenance Plan on Kakroo Nallah to Shogiroad Km.0/ to 10/0( SH :- P/L Grade-III, tack coat, Bituminous concrete 25mm thick and road marking with hot applied thermoplastic compound in Km4/0 to 5/
PlannedRFB
Other notices and awards in this project
- (ACTIVITY-1, Mandi II RF). Motipur Dudar Dhamyana road (Km 2/00 to 6/00, Bari Dhanyari road (Village road) Km 4/00 to 5/300, (SH:- Providing and laying 25 mm thick bituminous concrete and thermoplastic paint lining in curve portion only)
- Selection of consultancy services :to engage non transport sector(Building) Technical Consultants to provide specialized engineering and advisory support to the PIU housed in HPPWD Shimla for the effective delivery of the READY-HP Project
- ACTIVITY 42(MANALI)
Annual periodic Maintenance Plan for the year 2025-26 on Sainik
Chowk Bhunter Ramshilla Naggar Manali left bank road (under MRD) Km. 13/500 to 52/345).
Winner: SHANOO SHARMA· Awarded 2025-10-22Contract amount (Premium)
- (ACTIVITY No. 3 Sunder Nagar Division ) AMP on Sundernagar to Maloh road km 0/0 to
5/565 (SH:- Providing and laying 25 mm. thick Mix
seal surfacing in km 3/0 to 5/570)
Winner: VIJAY KUMAR· Awarded 2025-06-02Contract amount (Premium)
- ACTIVITY 133 (DHARAMPUR)
Periodical maintenance on link road Kalyun to Answai Km 0/0 to 2/0, etc (SH: Providing and laying 25mm thick bituminous concrete in various (VILLAGE ROADS)
Winner: MOHINDER PAL· Awarded 2025-04-23Contract amount (Premium)
- (ACTIVITY-1, Mandi II RF). Motipur Dudar Dhamyana road (Km 2/00 to 6/00, Bari Dhanyari road (Village road) Km 4/00 to 5/300, (SH:- Providing and laying 25 mm thick bituminous concrete and thermoplastic paint lining in curve portion only)
Winner: HEMANT KUMAR· Awarded 2025-04-08Contract amount (Premium)
- ACTIVITY NO 5 (Ner Chowk Division) Annual Maintenance Mandi Gagal Chail Chowk Janjehli Chhatri Rana Bag Nagan road km 0/0 to 16/190. (SH:- P/L 25mm Thick bituminous concrete on Mandi Gagal Chail Chowk Janjehli Chhatri Rana Bag Nagan road km 14/0 to 16/190
Winner: NAWAL KISHOR & SON· Awarded 2025-03-29Contract amount (Premium)
- ACTIVITY 37(JOGINDER NAGAR)
Periodical Maintenance of Dhelu Har to Tikroo road (SH:- Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 4/00 to 4/390 and 1/000 to 1/450) .
Winner: ANURAG SHARMA· Awarded 2025-03-21Contract amount (Premium)
- ACTIVITY NO 83 (BILASPUR-I)
(SH:- Providing and laying 25mm thick Bituminous concrete on link road Galu Jole to Panchayat HQ. road KM. 0/00 -1/00, 2/00 to 3/00. Talyana Hawani Churari road Km. 0/00 to 1/00. Hawan Peer Bhyanu road Km. 0/00 to 1/00 & 1/00 t
Winner: SURINDER PAL· Awarded 2025-03-20Contract amount (Premium)
- ACTIVITY 198 (DEHRA)
Periodic Renewal on Jawalamukhi Dehra Jawali Raja-Ka-Talab Road for the Year 2025-26 under MDR (SH: P/L 30mm thick Bituminous Concrete with Paver Finisher in KM 11/00 to 12/00 and 12/00 to 13/00).
Winner: VP SHARMA· Awarded 2025-02-24Contract amount (Premium)