[Construction Works] Announcement of General Competitive Bidding for Contract No. Kenko Dokaikai 3-11-1 Prefectural Single Road New Construction and Improvement (General Portion) (Debt)
Form No. 2 Bid Announcement Individual Matters [Post-Qualification Type] Gifu Prefectural Ibi Development Office Director Yoshiyasu Kubota
1. Construction to be Bid On
(1) Construction Number: Kenko Dokaikai 3-11-1
Construction Name: Construction Name Construction Name
(2) Construction Location: General Prefectural Road Suien-Manseki Line, Suien area, Ibi Town, Ibi District, Gifu Prefecture.
Line Adjustment
(3) Construction Overview:
Construction Length L = 165.6m, W = 6.0 (7.5)m
Earthwork: Excavation V = 620m3, Embankment V = 220m3, Slope shaping A = 90m2
Slope Work: Vegetation base spraying A = 30m2, Sodding A = 60m2
Block Retaining Wall Work: Toe protection A = 80m2
Paving Work: A = 794m2
Drainage Structure Work: Free slope side ditch L = 19m, PU side ditch L = 41m, BF type side ditch L = 45m, Catch basin N = 4 units
(4) Construction Period
(5) Estimated Price: 41,393,000 yen (including consumption tax and local consumption tax)
(6) Low Bid Price Investigation System: Yes
(7) Minimum Reserve Price System: No
(8) (9) (10) (11) (12) (13) (14) (15) (16) (17) Bid Announcement (Individual Matters)
Announcement of General Competitive Bidding for Prefectural Single Road New Construction and Improvement (General Portion) (Debt) Works
This construction project is a comprehensive evaluation bidding project (regional type) where the successful bidder is determined by comprehensively evaluating factors other than price, including the submission of technical proposals.
This construction project is subject to the obligation of separate demolition and recycling of specified construction materials, etc., based on the Act on the Recycling of Construction Materials, etc. (Law No. 104 of 2000).
This construction project will be conducted using the electronic bidding system. However, if it is difficult to use the electronic bidding system, written submission may be permitted with prior approval from the head of the ordering organization.
An announcement of post-qualification type general competitive bidding for the Prefectural Single Road New Construction and Improvement (General Portion) (Debt) Works is hereby made in accordance with the provisions of Article 127 of the Gifu Prefectural Accounting Regulations (Gifu Prefectural Ordinance No. 19 of 1957) (hereinafter referred to as the "Regulations").
The bid announcement shall consist of "Form No. 1 Bid Announcement Common Matters [Post-Qualification Type]" and this document. "Form No. 1 Bid Announcement Common Matters [Post-Qualification Type]" is posted on the Gifu Prefecture website.
This bid will be executed using the electronic bidding system. However, if you have changed your company name, address, or representative and have not updated your IC card, please participate using the paper-based bidding method.
If you continue to use your IC card, your bid may be invalidated or you may be subject to suspension of bidding qualification.
Please contact us if you have any questions.
September 1, Reiwa 8 (2026)
280 days from the date of contract.
Prefectural Single Road New Construction and Improvement (General Portion) (Debt) Works (Electronic Bidding Eligible Project)
This construction project involves remote on-site presence in construction sites.
For details, please refer to the "Trial Guidelines for Remote On-site Presence in Construction Sites."
This construction project is a trial project for human resource development type comprehensive evaluation bidding, aimed at supporting the securing and training of human resources in the construction industry and improving the work environment.
This construction project is subject to a trial for the correction of site management costs to facilitate heatstroke prevention measures, and the correction of site management costs will be made during the change of design based on the daily maximum temperature.
This construction project utilizes the ASP-based information sharing system.
For details, please refer to the "Gifu Prefecture Information Sharing System Operation Manual (Construction Version)."
This construction project is a model project for improving the working environment of construction workers.
For details, please refer to the "Gifu Prefecture Ordered Construction Site Environmental Improvement Model Project Implementation Guidelines."
This construction project is a model project for a complete two-day weekend system (Saturday and Sunday) (site closure), based on the principle of a complete two-day weekend.
For details, please refer to the "Gifu Prefecture Ordered Complete Two-Day Weekend System (Saturday and Sunday) Project Implementation Guidelines."
This construction project is a model project utilizing the Construction Career Up System.
For details, please refer to the "Gifu Prefecture Ordered Construction Career Up System Utilization Model Project Implementation Guidelines."
2. Bid Participation Qualifications
The qualifications required to participate in the bidding for this construction project are as follows.
(a) (b) (c) Comprehensive evaluation bidding projects with a contract amount between 10 million yen and 45 million yen.
3. Responsible Section
Bid Section: Gifu Prefectural Ibi Development Office 0585-23-1111, Postal Code 501-0603, 1-1 Kaminosato, Ibi River Town, Ibi District, Gifu Prefecture.
Construction Section: Gifu Prefectural Ibi Development Office 0585-23-1111, 2nd Floor, Gifu Prefectural Ibi General Government Building.
For construction projects with a contract amount of less than 10 million yen, the main office must be located in the Ibi area specified in "Table 3" of "Form No. 1 Bid Announcement Common Matters [Post-Qualification Type]" and be registered in the Gifu Prefecture Construction Work Bid Participation Qualification Register.
Category: Road Division, Road Section 1
Registered business type and total score in the Gifu Prefecture Construction Work Bid Participation Qualification Register:
Location requirements:
Other requirements:
Design and other service contractors:
Construction performance requirements:
Company: Union Co., Ltd.
Specific/General (Civil Engineering Construction)
Provided that the performance is for construction ordered by the national government or Gifu Prefecture, excluding those with a construction performance evaluation score of less than 65 points.
General Affairs Division, Management Coordination Section
Civil Engineering Construction - Total score of 930 points or more.
Required construction industry permit (Ext. 326)
Address:
Technician placement requirements (Ext. 305)
From Reiwa 23 (2011) to the application deadline, the contractor must have experience as the prime contractor in the following types of construction.
(Limited to joint ventures with an investment ratio of 40% or more.)
Must have a Class 1 or Class 2 Civil Engineering Construction Management Engineer (Civil Engineering), or a Professional Engineer (Construction Department), or equivalent qualifications.
Responsible Section/Construction Industry Act: Civil engineering works, completed and delivered, with a contract cost of 21 million yen or more.
For this construction project, the chief technician or supervising technician assigned must meet the following criteria (a) and (b), and must be able to be assigned at the beginning of the contract period for this construction project. However, the chief technician and supervising technician must be assigned exclusively from the start of on-site construction for this project.
However, exclusivity is not required if any of the following (1) to (3) apply.
From Reiwa 23 (2011) to the application deadline, the contractor must have experience as a chief technician, supervising technician, assistant supervising technician, or site manager for civil engineering works with a contract cost of 13 million yen or more, as the prime contractor, for completed and delivered construction projects. However, this excludes experience as an additional technician required in addition to the chief technician, supervising technician, or assistant supervising technician as stipulated by the Construction Industry Act when concluding a contract at a price below the low bid price investigation standard price (experience as a chief technician or supervising technician includes experience as a specially permitted chief technician, specially permitted supervising technician 1 and 2 (including specially permitted supervising technicians under the Construction Industry Act revised on October 1, 2020), and chief/supervising technicians under Article 26-5 of the Construction Industry Act. Furthermore, experience as a chief technician, supervising technician, assistant supervising technician, or site manager as a member of a joint venture is limited to those with an investment ratio of 40% or more).
For construction projects with a contract amount between 10 million yen and 45 million yen, if the average construction performance evaluation score for the relevant work type in Gifu Prefecture-ordered projects in Reiwa 7 and 6 (or Reiwa 5 and 4 if no such performance record exists) is 75 points or higher, the contractor must have received such a score.
Technician concurrent employment conditions: As specified in "1. Matters Related to Bid Participation Qualifications" of "Form No. 1 Bid Announcement Common Matters [Post-Qualification Type]."
(1) The contractor for the design work, etc., for this construction project is as follows.
This construction project allows for the application of Special Exemption 1, Special Exemption 2, and Article 26-5 of the Construction Industry Act.
Telephone Number:
4. Bidding Schedule:
Design document viewing:
From 9:00 AM on Tuesday.
Download from the electronic bidding system.
Until 4:00 PM on Tuesday.
Inquiry acceptance:
From 9:00 AM on Tuesday.
Via electronic bidding system.
Until 4:00 PM on Friday.
* For paper bidders, submit to the bid section.
Response viewing:
From 9:00 AM on Tuesday.
Via electronic bidding system.
Until 4:00 PM on Tuesday.
Also available for viewing at the bid section.
Application for viewing submission:
From 9:00 AM on Tuesday.
Via electronic bidding system.
Until 4:00 PM on Monday.
Until Thursday.
Via electronic bidding system.
From 9:00 AM on Monday.
Until 4:00 PM on Tuesday.
Bid Opening:
Via electronic bidding system.
From 9:00 AM on Wednesday.
From 1:00 PM on Wednesday.
Submit to the bid section.
Until 4:00 PM on Friday.
Submit to the bid section.
Written (free format).
Respond in writing.
Bid result announcement:
Via the bid information service or the prefectural website.
Also available for viewing at the bid section.
* For paper bidders, hand-delivery is permitted, but submission by mail or electronic transmission is not accepted.
(Same period and dates).
Note: Submission documents are described in "Form No. 1 Bid Announcement Common Matters [Post-Qualification Type]."
5.