Atami City Town Development Ordinance Revision Study Services Contract
Atami City Limited General Competitive Bidding Execution Announcement
We will conduct a limited general competitive bid for the following services, and hereby announce and execute it in accordance with the provisions of Article 7 of the Atami City Contract Regulations (Reiwa 20, Atami City Regulations No. 16).
October 28, Reiwa 8
Sakae Saito, Mayor of Atami City
1. Bid Executor: Sakae Saito, Mayor of Atami City
2. Matters for Bidding:
(1) Bid Number: Machi (I) Bid No. 8
(2) Contracted Services Name: Atami City Town Development Ordinance Revision Study Services Contract
(3) Contract Location: Within Atami City
(4) Contract Outline, etc.: As per attached special specifications.
(5) Completion Date: March 30, Reiwa 11
(6) Estimated Contract Price: To be announced after the fact.
(7) Minimum Reserve Price: Set.
3. Qualifications Required for Bidders:
(1) Not subject to the provisions of Article 167-4 of the Local Autonomy Act Enforcement Order (Showa 22, Cabinet Order No. 16, hereinafter referred to as "Enforcement Order").
(2) Must be registered in Atami City Construction Work, etc. Competitive Bidding Participation Qualifications "Survey and Construction Consulting, etc." and registered in Civil Engineering Consulting (Urban Planning).
(3) Must have a business office within Shizuoka Prefecture.
(4) The assigned chief engineer must be a person with qualifications as a Professional Engineer (Construction Department/Urban and Regional Planning) or a Registered Professional Engineer (Urban Planning and Regional Planning Department).
(5) Must have completed at least one project related to the formulation of basic plans or master plans for town development, commissioned by local governments within Shizuoka Prefecture, within the past 5 years.
(6) Not subject to supervisory disposition from the competent ministry based on relevant laws.
(7) Not within the period of suspension of bidding based on the "Atami City Construction Contract, etc. and Goods Procurement, etc. Bidding Participation Qualification Suspension Measures Ordinance" (Heisei 4, Atami City Notice No. 49).
4. Matters Concerning Obtaining Design Documents, Drawings, etc.:
(1) Period: From Wednesday, October 28, Reiwa 8, until the day before the bid execution date.
(2) Method: Distributed via the Atami City website, etc.
5. Matters Concerning Submission of Bid Qualification Confirmation Application:
Those who wish to participate in this bid must submit an application form as follows. However, confirmation of bidding qualifications will be finalized by detailed confirmation of bidding qualifications conducted before the bid.
(1) Deadline: Until Wednesday, November 11, Reiwa 8 (excluding Saturdays, Sundays, and holidays), from 9:00 AM to 4:00 PM. FAX or in-person submission.
(2) Submission Location: Atami City Hall, Tourism and Construction Department, Town Development Division, 1-1 Chuo-cho, Atami City. Phone: 0557-86-6381 FAX: 0557-86-6416
(3) Documents: Submit "Bid Qualification Confirmation Application" (Form No. 1), "Qualifications and Work Experience List of Assigned Engineers, etc." (Form No. 3) as prescribed by the "Atami City Limited General Competitive Bidding Execution Guidelines" and the specified attached documents in 7.(5).
6. Matters Concerning Bidding and Bid Opening:
(1) Bid Submission: For bids submitted in person, the amount written on the bid form shall exclude consumption tax, etc.
(2) Bid Execution Date and Time: Friday, November 13, Reiwa 8, 10:15 AM.
(3) Bid Opening Location: 2nd Conference Room, 4th Floor, 1st Building, Atami City Hall, 1-1 Chuo-cho, Atami City. Phone: 0557-86-6381
(4) Documents Required for Bidding: Bid form, Bid Qualification Confirmation Notice, Contract Cost Calculation Document. (Contract Cost Calculation Document should be submitted if requested by the city.) Power of Attorney (if authorized by the representative). Seal (registered seal) on Power of Attorney.
(5) Bid Security and Contract Security:
① Bid Security: Waived.
② Contract Security: To be paid (10% or more of the contract amount). However, it can be substituted by providing interest-bearing national or local bonds, or a guarantee from a financial institution or guarantee company. Furthermore, if a performance guarantee bond for public works is provided or a performance guarantee insurance contract is concluded, the payment of contract security will be waived.
(6) Invalid Bids: Bids submitted by persons who do not have the necessary qualifications to participate in the bid announced herein, bids submitted by persons who have made false statements in their bid qualification confirmation application or confirmation documents, or bids that violate the conditions of bidding as indicated in the Construction Work Bidding Contract Guidelines, will be deemed invalid.
(7) Determination of Successful Bidder: The successful bidder will be the one who submitted the lowest valid bid within the limit of the estimated price, in accordance with Article 234, Paragraph 3 of the Local Autonomy Act (Showa 22, Law No. 67) and Article 167-10 of the Enforcement Order. However, if a minimum reserve price is set, the successful bidder will be the one who submitted the lowest valid bid among those who bid at or above the minimum reserve price within the limit of the estimated price. The contract amount will be the bid amount plus consumption tax, etc.
7. Other:
(1) Bids from persons falling under Article 18 of the Atami City Contract Regulations will be deemed invalid if they are determined to lack bidding qualifications during the qualification review. Furthermore, unless there are unavoidable circumstances, bids will be invalid if the necessary documents for qualification review are not submitted by the prescribed deadline.
(2) Persons who have made false applications may be subject to suspension of bidding or other measures.
(3) Contract Creation Requirement: Required.
(4) Please read the "Atami City Limited General Competitive Bidding Execution Guidelines," "Atami City Construction Work Bidding Guidelines," and "Contract Terms" carefully.
(5) Specified Attached Documents for Bid Qualification Confirmation Application: Details are in the bid explanation document.
(6) Partial Payment: Yes.
(7) Inquiries: Atami City Hall, Town Development Division. (Phone number: 0557-86-6381)
① Bid Number
② Contracted Services Name
③ Contract Price
④ Minimum Reserve Price: Set.
⑤ Completion Date
⑥ Contract Location
⑦ On-site Explanation: Yes [ ] No [X]
⑧ Bid Location
⑨ Bid Date and Time
⑩ Bidding Method:
- Bids by mail are not permitted.
- The amount written on the bid form shall exclude consumption tax, etc.
- Use the city's designated form for the bid form.
- The contract amount will be the bid amount plus consumption tax, etc.
⑪ Payment Terms: Yes [X] No [ ] 2
⑫ Bid Security
⑬ Contract Security
⑭ Design Document Viewing Location: Distributed via the Atami City website, etc.
⑮ Specifications to be Used
⑯ Documents to be Submitted with Application:
- "Bid Qualification Confirmation Application" (Form No. 1)
- "Qualifications and Work Experience List of Assigned Engineers, etc." (Form No. 3)
- Copy of Construction Consultant Registration Certificate, etc.
- Copy of Assigned Engineer's Qualification Certificate
⑰ Other:
- Please read the "Atami City Construction Work Bidding Guidelines" and "Contract Terms" carefully.
- Please be sure to refer to the "Limited General Competitive Bidding Execution Announcement of Atami City."
- Please be sure to refer to the "Atami City Limited General Competitive Bidding Execution Guidelines."
- Please be sure to refer to the "Atami City Minimum Reserve Price Handling Guidelines."
- Partial Payment: Within [ ] times.
- Must have completed projects related to the formulation of basic plans or master plans for town development commissioned by local governments within Shizuoka Prefecture within the past 5 years. Proof of such experience should be provided.
- Please be sure to refer to the "Atami City Low Bid Price Investigation System Guidelines for Construction Work."
Limited General Competitive Bidding Explanation Document
Post-announcement
Machi (I) Bid No. 8
March 30, Reiwa 11
2nd Conference Room, 4th Floor, 1st Building, Atami City Hall
Atami City Town Development Ordinance Revision Study Services Contract
Special Specifications
Waived
Advance Payment
Atami City Town Development Ordinance Revision Study Services Contract
Survey, Calculation, Design
October 2021
Designer's Name
Reiwa 8 Fiscal Year
Atami City
Shigeru Fukuda
Atami City Town Development Ordinance Revision Study Services Contract
Contract Price
Contract Location
Contracted Services Content
Reason for Execution: This service is to organize the current issues in the city's town development, look ahead to future town development, study the revision of the ordinance, and create a draft of the revision.
Contract Cost Breakdown (A)
Item
Work Type
Category
Quantity
Unit
Unit Price
Amount
Details
Atami City Town Development Ordinance Revision Study Services Contract
Work Price
1.0
Unit
Refer to Specification Sheet No. 1
1.0
Unit
Refer to Specification Sheet No. 2
1.0
Unit
Refer to Specification Sheet No. 3
Total Work Price
Consumption Tax
10%
Atami City
Summary Table
Reiwa 8 Fiscal Year Work
Reiwa 9 Fiscal Year Work
Reiwa 10 Fiscal Year Work
Consumption Tax and Local Consumption Tax
Subsequent Contract Costs
Contract Cost Breakdown (A) No. 1
Item
Work Type
Category
Quantity
Unit
Unit Price
Amount
Details
Reiwa 8 Fiscal Year Work
Direct Labor Costs
1.0
Unit
Refer to Specification Sheet No. 1
1.0
Unit
Refer to Specification Sheet No. 2
1.0
Unit
Refer to Specification Sheet No. 3
1.0
Unit
Refer to Specification Sheet No. 4
1.0
Unit
Refer to Specification Sheet No. 5
1.0
Unit
Refer to Specification Sheet No. 6
Subtotal
Direct Expenses (Calculated)
Electronic Deliverables Creation Cost
1.0
Unit
5.1 x (Direct Labor Costs (thousands of yen))^0.38
Survey/Planning Work
Travel Expenses
1.0
Unit
Direct Labor Costs x 1.49%
Atami City
Coordination Meeting Support
Contract Cost Breakdown
Organization of Current Status of Urban Areas and Town Development Issues
Examination of the Operational Status and Impact of the Atami City Town Development Ordinance
Points of Consideration and Direction of Response
Meeting
Report Preparation
Contract Cost Breakdown (B)
Item
Work Type
Category
Quantity
Unit
Unit Price
Amount
Details
Subtotal
1.0
Unit
Total Direct Costs
Indirect Costs
53.85%
Other Costs
1.0
Unit
Direct Labor Costs x α/(1-α) * α: 35%
Total Indirect Costs
Total Work Costs
53.85%
General and Administrative Expenses, etc.
1.0
Unit
Work Costs x β/(1-β) * β: 35%
Total Work Price
(Rounded down to less than 10,000 yen)
Atami City
Table No. 1
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Organization of Current Status of Urban Areas and Town Development Issues
Details
Urban Area Status
Socioeconomic Conditions
Upper-level Related Plans
Town Development Policy
Total
Total
Remarks
Progress of Town Development Projects
Organization of Town Development Issues
Table No. 2
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Examination of Operational Status and Impact of the Atami City Town Development Ordinance
Details
Organization of Operational Status
Organization of Opinions Regarding Ordinance Operation
Examination of Effects and Impacts
Total
Total
Remarks
Table No. 3
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Points of Consideration and Direction of Response
Details
Main Points of Consideration for Revision of Atami City Town Development Ordinance
Direction of Response
Total
Total
Remarks
Table No. 4
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Support for Coordination Meetings within the City
Details
Meeting Operation Support
Preparation of Meeting Materials
Total
Total
Remarks
Table No. 5
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Meeting Consultation
Details
Meeting Consultation
Total
Total
Remarks
Table
Report Preparation
Report Preparation
Contract Cost Breakdown (A) No. 2
Item
Work Type
Category
Quantity
Unit
Unit Price
Amount
Details
Reiwa 9 Fiscal Year Work
Direct Labor Costs
1.0
Unit
Refer to Specification Sheet No. 7
1.0
Unit
Refer to Specification Sheet No. 8
1.0
Unit
Refer to Specification Sheet No. 9
1.0
Unit
Refer to Specification Sheet No. 10
1.0
Unit
Refer to Specification Sheet No. 11
1.0
Unit
Refer to Specification Sheet No. 12
1.0
Unit
Refer to Specification Sheet No. 13
1.0
Unit
Refer to Specification Sheet No. 14
Subtotal
Atami City
Consideration of Responses to Current Issues in Atami City Town Development Ordinance
Consideration of Responses to Future Urban Vision
Consideration of Future Town Development Policies
Contract Cost Breakdown
Coordination Meeting Support
Report Preparation
Contract Cost Breakdown (B)
Item
Work Type
Category
Quantity
Unit
Unit Price
Amount
Details
Direct Expenses (Calculated)
Electronic Deliverables Creation Cost
1.0
Unit
5.1 x (Direct Labor Costs (thousands of yen))^0.38
Survey/Planning Work
Travel Expenses
1.0
Unit
Direct Labor Costs x 1.49%
Subtotal
1.0
Unit
Total Direct Costs
Indirect Costs
53.85%
Other Costs
1.0
Unit
Direct Labor Costs x α/(1-α) * α: 35%
Total Indirect Costs
Total Work Costs
53.85%
General and Administrative Expenses, etc.
1.0
Unit
Work Costs x β/(1-β) * β: 35%
Total Work Price
(Rounded down to less than 10,000 yen)
Atami City
Table No. 7
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Consideration of Responses to Current Issues in Atami City Town Development Ordinance
Details
Consideration of Revision Direction
Identification and Response to Issues of Revision
Total
Total
Remarks
Table No. 8
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Consideration of Responses to Future Urban Vision
Details
Consideration of Revision Direction
Identification and Response to Issues of Revision
Total
Total
Remarks
Table No. 9
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Consideration of Future Town Development Policies
Details
Consideration of Policies
Creation of Policy Draft
Total
Total
Remarks
Table No. 10
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Consideration of Responses to Specific Projects
Details
Consideration of Revision Direction
Identification and Response to Issues of Revision
Total
Total
Remarks
Table No. 11
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Support for Coordination Meetings within the City
Details
Meeting Operation Support
Preparation of Meeting Materials
Total
Total
Remarks
Table No. 12
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Organization of Revision Policies
Details
Organization of Revision Policies for Atami City Town Development Ordinance
Direction of Response for Related Ordinances
Total
Total
Remarks
Table No. 13
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Meeting Consultation
Details
Meeting Consultation
Total
Total
Remarks
Table No. 14
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Report Preparation
Details
Report Preparation
Total
Total
Remarks
Contract Cost Breakdown (A) No. 3
Item
Work Type
Category
Quantity
Unit
Unit Price
Amount
Details
Reiwa 10 Fiscal Year Work
Direct Labor Costs
1.0
Unit
Refer to Specification Sheet No. 15
1.0
Unit
Refer to Specification Sheet No. 16
1.0
Unit
Refer to Specification Sheet No. 17
1.0
Unit
Refer to Specification Sheet No. 18
1.0
Unit
Refer to Specification Sheet No. 19
1.0
Unit
Refer to Specification Sheet No. 20
Subtotal
Direct Expenses (Calculated)
Electronic Deliverables Creation Cost
1.0
Unit
5.1 x (Direct Labor Costs (thousands of yen))^0.38
Survey/Planning Work
Travel Expenses
1.0
Unit
Direct Labor Costs x 1.49%
Atami City
Meeting Consultation
Report Preparation
Atami City Town Development Ordinance Revision Draft Creation
Contract Cost Breakdown
Consideration of Responses to Future Urban Vision
Support for Coordination Meetings within the City
Hearing from Academics, etc.
Contract Cost Breakdown (B)
Item
Work Type
Category
Quantity
Unit
Unit Price
Amount
Details
Subtotal
1.0
Unit
Total Direct Costs
Indirect Costs
53.85%
Other Costs
1.0
Unit
Direct Labor Costs x α/(1-α) * α: 35%
Total Indirect Costs
Total Work Costs
53.85%
General and Administrative Expenses, etc.
1.0
Unit
Work Costs x β/(1-β) * β: 35%
Total Work Price
(Rounded down to less than 10,000 yen)
Atami City
Table No. 15
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Consideration of Responses to Future Urban Vision
Details
Consideration of Revision Direction
Identification and Response to Issues of Revision
Total
Total
Remarks
Table No. 16
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Consideration of Responses to Future Town Development Policies
Details
Consideration of Policies
Creation of Policy Draft
Total
Total
Remarks
Table No. 17
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Consideration of Responses to Specific Projects
Details
Consideration of Revision Direction
Identification and Response to Issues of Revision
Total
Total
Remarks
Table No. 18
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Support for Coordination Meetings within the City
Details
Meeting Operation Support
Preparation of Meeting Materials
Total
Total
Remarks
Table No. 19
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Organization of Revision Policies
Details
Organization of Revision Policies for Atami City Town Development Ordinance
Direction of Response for Related Ordinances
Total
Total
Remarks
Table No. 20
Job Title
Chief Engineer
Chief Engineer
Senior Engineer
Engineer (A)
Engineer (B)
Engineer (C)
Technician
Work Content
Report Preparation
Details
Report Preparation
Total
Total
Remarks