Road Paving Work on Municipal Road Kumagai Line
About This Opportunity
This is a works contract in the construction and civil works, transport and logistics and urban development and housing sectors, with a focus on Roads, Bridges, Dams and Municipal Services. Located in Japan, Asia, this opportunity is open to firms and consortiums. Proposals must be submitted before July 7, 2029.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from JapaneseRoad Paving Work on Municipal Road Kumagai Line
Contact (Regarding Bidding Project): 12-3 Tono-machi, Tomioka, Anan City (Regarding Bid Execution): 12-3 Tono-machi, Tomioka, Anan City Anan City Phone Number 0884-22-1595 Construction Department, Civil Engineering Division - Times indicated in this bid information are in 24-hour format.
Please submit by 9:15 AM on Tuesday, July 7, Reiwa 8.
- Those who have not attended the site briefing session cannot participate in the bidding. However, this does not apply if a site briefing session is not held.
- This notice of designation may be canceled under certain circumstances.
Dietary approval not required Contract guarantee exemption Breakdown sheet submission required Design amount (excluding tax) 2,020,000 yen Bid submission period July 2, Reiwa 8 to July 6, Reiwa 8 Design drawings etc. viewing location Anan City website July 6, Reiwa 8 June 30, Reiwa 8 Design drawings etc. viewing period Designated contractor Site briefing session date and time (Monday) - From 15:00 to District Reiwa 8 October 5 A B Construction Department, Civil Engineering Division The day after contract conclusion In-house management department Work name Work location Construction period - Road paving work on Municipal Road Kumagai Line Anan City Kumagai-cho Shirudani Paving (Tuesday) 8:30 AM Anan City Hall 3rd Floor, Conference Room 307 (Thursday) From to Bid security Applicable minimum price system Bid information (Monday) From Site briefing session location Bid opening date and time Regardless of whether it is, the bid amount shall be an amount equivalent to 100/110 of the estimated desired contract amount.
Exemption Remarks - This bid is an electronic bidding project utilizing the Tokushima Prefecture Electronic Bidding System.
- This bid will be executed and the contract will be concluded based on the bidder's precautions, Anan City Contract Regulations, Anan City Public Works Standard Contract Agreement, and Anan City Electronic Bidding System Operation Standards.
If there are no bids, the bidding will be closed.
An amount equivalent to (the amount obtained by adding the amount equivalent to the amount to be added, and if there is a fraction of less than 1 yen, the fraction is rounded down) will be the winning bid price. Therefore, bidders must be taxable or exempt from consumption tax and local consumption tax. When determining the winning bid, the bid amount plus 100/100 of that amount 0884-22-3804 General Affairs Department, General Affairs Division - Proxy bidding by other construction-related contractors is not permitted for this bid.
Anan City Phone Number - The bid execution will be conducted once, and a valid bid within the range of the estimated price will be accepted. - If you wish to decline this designation, please submit a withdrawal notice.
- Please view the design documents etc. listed in the notice of designation and submit the bid form and breakdown sheet.
Civil Engineering Work Special Specifications (Applicable from April 1, Reiwa 8) Article 1 Road paving work on Municipal Road Kumagai Line shall be performed in accordance with this Special Specifications and the "Tokushima Prefecture Civil Engineering Work Common Specifications July Reiwa 6", "Tokushima Prefecture Civil Engineering Work Construction Management Standards", and "Tokushima Prefecture Work Inspection Standards". In case of overlapping content, this Special Specifications shall take precedence. In addition, the Tokushima Prefecture version shall be used for the Civil Engineering Work Major Submission Documents Checklist (Chronological) [For Contractors] and forms. 2. However, the guidelines, standards, and manuals indicated in the "Applicable Standards" in each chapter of the Common Specifications shall be the latest revised versions. This does not apply if they are revised during the construction period. (Changes to the Civil Engineering Work Major Submission Documents Checklist (Chronological) [For Contractors]) Article 2 Changes to the Civil Engineering Work Major Submission Documents Checklist (Chronological) [For Contractors] are as follows. (Reading of Checklist) "Confirmation of Intent Regarding Work Performance Evaluation" in Submission Document 87 shall not be used. (Supplementary Notes to the Civil Engineering Work Common Specifications) Article 3 Supplementary notes to the "Tokushima Prefecture Civil Engineering Work Common Specifications July Reiwa 6" are as follows. (Reading of Common Specifications) [Change] In "1-1-1-24 Construction By-products", "Construction By-product Information Exchange System (hereinafter referred to as "COBRIS")" shall be read as "COBRIS Plus". (Site Manager and Chief Engineer, etc.) [Change] 1-1-1-15 Site Manager and Chief Engineer, etc. 1. Appointment Notice (4) The contractor shall attach the following to the appointment notice. ② If a supervising engineer is appointed (total subcontract amount of 50 million yen or more), the supervising engineer's qualification certificate and supervising engineer's training completion certificate (front and back of each). (Accident Report) [Change] 1-1-1-40 Accident Report The contractor shall immediately notify the supervisor if an accident occurs during the construction work. In addition, if instructed by the supervisor and in the case of an accident subject to registration in the construction accident database system, the contractor shall submit an accident report by the date specified by the supervisor and register the accident information in the construction accident database system. (Completion Marker) [Addition] 1-1-1-57 Installation of Completion Marker If the contractor wishes, the names of the engineers involved in the work can be recorded on a post (Form No. 2) or a plate (Form No. 3) for the following works (structures). Target Works (Structures): Retaining walls, culverts, bridge superstructures, bridge substructures, tunnels, weirs, water gates, sluice gates (pipes), sabo dams, sheds, slopes, (pumping) drainage stations Target Engineers: Name of supervising (chief) engineer (Heatstroke Countermeasures Trial) Article 4 This work is a trial work that corrects site management costs according to the number of days with a maximum daily temperature of 30°C or higher. The "Guidelines for Correction of Site Management Costs Contributing to Heatstroke Countermeasures (hereinafter referred to as "Trial Guidelines")" separately established shall be applied. 2. In the case of scattered work locations, corrections can be made for each scattered location according to the number of days with a maximum daily temperature of 30°C or higher. 3. For night work, corrections can be made for days with a maximum temperature of 30°C or higher during working hours. 4. For the trial, the method of measuring temperature and the method of reporting measurement results shall be discussed with the supervisor in advance. The measurement method shall use the temperature announced by the Japan Meteorological Agency in Anan City (target: maximum daily temperature of 30°C or higher) or the heat index (WBGT) announced by the Ministry of the Environment (target: maximum daily WBGT of 25°C or higher). (Special Specifications for This Work) Article 5 Special specifications for this work are as follows. 1. General Meeting The contractor shall hold a general meeting regarding the work with the client before commencing the work. 2. Work Schedule The contractor shall report the progress at the end of each month by the 10th of the following month to the supervisor. 3. Traffic Guidance Staff 6 traffic guidance staff are included in this work, but safety measures shall be discussed with the supervisor before construction, and changed as necessary. 4. Traffic Restrictions, etc. Regarding traffic restrictions for this work, the supervisor and the contractor shall discuss before commencing construction, and the final decision on the type of restriction shall be based on the "Road Use Permit" from the relevant police station. Construction shall commence after the procedures for traffic restrictions are completed. If road use permission is obtained for complete road closure or vehicle traffic closure as the traffic restriction method for the site, measures such as installing guide signs around the construction site shall be taken to provide prior notification to pedestrians and vehicles at least one week before the start of the restriction. Also, notify relevant organizations at the start and end of the restriction. In the case of complete road closure or vehicle traffic closure, regional compensation (general traffic impact ① and ②) shall not be applied, as no increase in indirect construction costs is expected due to construction. However, if changes to the restriction details are made through consultation between the supervisor and the contractor due to local adjustments, etc., the application of regional compensation (general traffic impact) shall be discussed. 5. Proper Disposal of Construction By-products Tracking surveys may be conducted to confirm the proper disposal of construction by-products upon their removal. 6. Removal of Construction By-products for Recycling The industrial waste generated by the construction of this work shall be transported to the following locations for recycling. (1) Concrete lump receiving location: Daiichi Kensetsu Co., Ltd. Iseki Factory, 302-1 Iseki-cho, Takada-cho, Anan City (2) Asphalt lump receiving location: Daiichi Kensetsu Co., Ltd. Iseki Factory, 302-1 Iseki-cho, Takada-cho, Anan City. When transporting, the "Waste Management and Public Cleansing Act" must be complied with. 7. Safety Measures The contractor shall implement safety measures such as scaffolding, taking into account the site conditions, structure of the building, and construction methods. 8. Obstruction Structures When carrying out construction for this work, care must be taken not to affect adjacent structures or buried objects (such as culverts). If any buried objects of unknown management are discovered during construction, promptly contact the supervisor. Heatstroke Countermeasures Trial Guidelines Anan City HP https://www.city.anan.tokushima.jp/docs/2026022400039/ Contact. 9. Restoration of Cultivated Land, etc. After using cultivated land, etc. for the site, the backfilling shall be done with particular care, removing stones and leveling unevenness to prevent problems with landowners later. After restoration, withdraw after obtaining the consent of the landowner. 10. Disaster Prevention Measures. Earthquakes and other disasters shall be prepared for, prioritizing the safety of human life. 11. Other Other matters deemed necessary shall be discussed with the supervisor as needed.
Mayor Draft Decision Number Vice Mayor Department - Section Chief - Section Chief Assistant Designer Classification Cost Item 3rd Design Change Amount Actual Execution Amount Work Summary Work Days Decision Conditions Section Reason Asphalt Paving L=69.80m W=3.65-8.40m A=305m2 t=4cm Business Name Contract Manager Expenditure Category Item - Work Name Design Amount Road paving work on Municipal Road Kumagai Line Breakdown of the above Anan City Kumagai-cho Shirudani Work Price - Consumption Tax Equivalent Amount Work Location Design Document No. 8 Design Regarding the following work design, please approve the contents. Design Change Reiwa Year Month Day Reiwa Year Month Day Approved Amount Initial Execution Amount Changed Design Amount Work Price Consumption Tax Equivalent Amount Breakdown of the above Number of Days Construction Method Road, Bridge, New Construction, Improvement Business Category Item Section 2nd Design Change Amount Actual Execution Amount Actual Execution Amount 1st Design Change Amount Road paving work on Municipal Road Kumagai Line Work Cost Breakdown Sheet Cost Item - Work Type - Classification - Sub-item Quantity Unit Unit Price Amount Breakdown Unit Price Number Standard Paving Work 01 1 Lot Earthwork Description 1 1 Lot Paving Work Description 2 1 Lot Temporary Work (including traffic guidance staff) Description 3 1 Lot Direct Construction Cost Total Common Temporary Work Cost Total 1 Lot Common Temporary Work Cost (Ratio) 1 Lot Common Temporary Work Ratio Portion 1 Lot Net Construction Cost 1 Lot Site Management Cost 1 Lot Construction Cost 1 Lot General Management Cost, etc. 1 Lot Work Price 1 Lot Consumption Tax Equivalent Amount 1 Lot Total Anan City 1 Municipal Road Kumagai Line Road Paving Work Form No. 1 Breakdown Sheet Earthwork 1 Lot Per Name - Specifications Quantity Unit Unit Price Amount Breakdown Unit Price Number Standard Concrete Paving Slab Demolition 1 Lot Paving Slab Crushing P 1 Concrete Paving Slab Thickness 15cm or less 100 m2 Shell Transport Paving Slab Crushing P 2 Machine (No noise measures required, thickness 15cm or less) 10 m3 Concrete Lump (Unreinforced) 30cm or less 10 m3 Asphalt Paving Slab Demolition 1 Lot Paving Slab Cutting P 3 Asphalt Paving Slab 15cm or less 9 m Paving Slab Crushing P 4 Asphalt Paving Slab Thickness 15cm or less 200 m2 Shell Transport Paving Slab Crushing P 2 Machine (No noise measures required, thickness 15cm or less) 8 m3 Asphalt Lump 30cm or less 8 m3 Total Anan City 2 Municipal Road Kumagai Line Road Paving Work Form No. 2 Breakdown Sheet Paving Work 1 Lot Per Name - Specifications Quantity Unit Unit Price Amount Breakdown Unit Price Number Standard Unevenness Leveling Work P 5 60mm or more, less than 68mm 101 m2 Unevenness Leveling Work P 6 28mm or more, less than 34mm 205 m2 Surface Layer (Roadway/Shoulder) 1 Layer Finish Thickness 40mm P 7 Recycled Dense Graded Asphalt Concrete (13) 305 m2 Total Anan City 3 Municipal Road Kumagai Line Road Paving Work Form No. 3 Breakdown Sheet Temporary Work (including traffic guidance staff) 1 Lot Per Name - Specifications Quantity Unit Unit Price Amount Breakdown Unit Price Number Standard Traffic Guidance Staff B Execution 1 6 persons/day Total Anan City 4 Municipal Road Kumagai Line Road Paving Work Form No. 1 Construction Unit Price List Traffic Guidance Staff B 1 person/day Per Name - Specifications Quantity Unit Unit Price Amount Breakdown Unit Price Number Standard Traffic Guidance Staff B Miscellaneous Expenses (Rounding) 1 Lot Total Per Unit Anan City 5 Municipal Road Kumagai Line Road Paving Work Form No. 1 Construction Package Paving Slab Crushing Concrete Paving Slab Thickness 15cm or less 1 m2 Per Name - Specifications Amount Composition Ratio (%) Amount Composition Ratio (%) Standard Area Unit Price Estimated Area Unit Price Breakdown Unit Price Number Standard [Machinery] Backhoe (Crawler Type) [Rear Ultra-small Swing Type] Heaped 0.45m3 (Struck 0.35m3) [Labor] General Civil Engineering Foreman Operator (Special) General Laborer [Materials] Light Oil [Rounding Adjustment] [Conditions] [J1] = 2 Paving Slab Type Concrete Paving Slab [J2] = 1 Obstacles None [J3] = 1 Noise and Vibration Measures None [J4] = 4 Paving Slab Thickness 15cm or less [J6] = 1 Loading Work Yes [J7] = 1 Breakdown of Costs All Costs Anan City 6 Municipal Road Kumagai Line Road Paving Work Form No. 2 Construction Package Shell Transport Paving Slab Crushing Machine (No noise measures required, thickness 15cm or less) 1 m3 Per Name - Specifications Amount Composition Ratio (%) Amount Composition Ratio (%) Standard Area Unit Price Estimated Area Unit Price Breakdown Unit Price Number Standard [Machinery] Dump Truck [On-road, Diesel] 10t Load Class [Labor] Operator (General) [Materials] Light Oil [Rounding Adjustment] [Conditions] [J1] = 3 Shell Generation Work Paving Slab Crushing [J2] = 3 Loading Method Classification Machine (No noise measures required, thickness 15cm or less) [J3] = 1 DID Zone None [JA] = 5 Transport Distance 11.5km or less [JJ] = 1 Breakdown of Costs All Costs Anan City 7 Municipal Road Kumagai Line Road Paving Work Form No. 3 Construction Package Paving Slab Cutting A...
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on June 30, 2026. Last refreshed 15 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 徳島県阿南市
徳島県阿南市 has issued 63 procurement notices on BidsFactory, including 19 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 7, 2026.
Frequently asked questions about this tender
When does this tender close?
The submission deadline is July 7, 2029. You have 1065 days left to prepare and submit your proposal to the contracting authority.
Who is the contracting authority?
This notice was issued by 徳島県阿南市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.