Road Bridge Improvement (Improvement) Construction (Ancillary Facilities) Price Competition
26-41360-0168
We will conduct a conditional general competitive tender, and hereby announce it in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act (Showa 22, Cabinet Order No. 16) and Article 246, Paragraph 1 of the Fukushima Prefecture Financial Regulations (Showa 39, Fukushima Prefecture Ordinance No. 17).
August 17, Reiwa 8
Takahiro Sato, Director of Fukushima Prefecture Minami-Aizu Regional Development Bureau
1. Matters for Tender
Construction Number | Construction Name | Construction Location | Construction Overview | Completion Deadline
26-41360-0168 | Road Bridge Improvement (Improvement) Construction (Ancillary Facilities) | Kaneyatsu, Tadami-machi, Minami-Aizu-gun (National Route 289) | Road ancillary facility installation, N=1 set | December 28, Reiwa 8
Estimated Price: To be publicly announced after contract conclusion.
Mixed Bidding | Reconstruction JV Only | Reconstruction JV | Tender Announcement
Applicable/Not Applicable | Details when applicable:
Road ancillary facility installation, N=1 set | Low Bid Price Investigation | Comprehensive Evaluation Method
Not Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction for which a minimum reserve price will be set based on Article 167-10, Paragraph 2 of the Enforcement Order. It will be publicly announced after the contract is concluded.
* This is a construction to which the comprehensive evaluation method is applied, which determines the successful bidder by comprehensively evaluating factors other than price and price.
* The method for determining the successful bidder candidate and the comprehensive evaluation method are as specified in the tender explanation document. A benchmark price will be set for this tender.
* This is a construction to which the low bid price investigation system applies based on Article 167-10-2, Paragraph 2 of the Enforcement Order. The investigation benchmark price will be publicly announced after the contract is concluded.
* If a bid below the investigation benchmark price is submitted, the bidder with the highest evaluation score may not necessarily be the successful bidder. Please cooperate with the low bid price investigation.
Construction Start Period | Applicable/Not Applicable | Details when applicable:
* If applicable, construction started on or after April 1, Reiwa 8.
* If not applicable, construction started by March 31, Reiwa 8.
Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document.
* This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000).
Applicable | Applicable/Not Applicable | Applicable/Not Applicable
* This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies.
* The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document.
* To participate in electronic bidding, advance registration is required at the following address.
* Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
* Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
* The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions.
* This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned.