Tenders/Road Bridge Improvement (Improvement) Construction (Ancillary Facilities) Price Competition
Open🇯🇵JapanWorks

Road Bridge Improvement (Improvement) Construction (Ancillary Facilities) Price Competition

Auto-translated from Japanese
Original title: 道路橋りょう改良(改良)工事(付属物)価格競争
福島県
Published: Aug 17, 2026
Updated: Sep 4, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the architecture and engineering, transport and logistics and construction and civil works sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the architecture and engineering sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Road Bridge Improvement (Improvement) Construction (Ancillary Facilities) Price Competition 26-41360-0168 We will conduct a conditional general competitive tender, and hereby announce it in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act (Showa 22, Cabinet Order No. 16) and Article 246, Paragraph 1 of the Fukushima Prefecture Financial Regulations (Showa 39, Fukushima Prefecture Ordinance No. 17). August 17, Reiwa 8 Takahiro Sato, Director of Fukushima Prefecture Minami-Aizu Regional Development Bureau 1. Matters for Tender Construction Number | Construction Name | Construction Location | Construction Overview | Completion Deadline 26-41360-0168 | Road Bridge Improvement (Improvement) Construction (Ancillary Facilities) | Kaneyatsu, Tadami-machi, Minami-Aizu-gun (National Route 289) | Road ancillary facility installation, N=1 set | December 28, Reiwa 8 Estimated Price: To be publicly announced after contract conclusion. Mixed Bidding | Reconstruction JV Only | Reconstruction JV | Tender Announcement Applicable/Not Applicable | Details when applicable: Road ancillary facility installation, N=1 set | Low Bid Price Investigation | Comprehensive Evaluation Method Not Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction for which a minimum reserve price will be set based on Article 167-10, Paragraph 2 of the Enforcement Order. It will be publicly announced after the contract is concluded. * This is a construction to which the comprehensive evaluation method is applied, which determines the successful bidder by comprehensively evaluating factors other than price and price. * The method for determining the successful bidder candidate and the comprehensive evaluation method are as specified in the tender explanation document. A benchmark price will be set for this tender. * This is a construction to which the low bid price investigation system applies based on Article 167-10-2, Paragraph 2 of the Enforcement Order. The investigation benchmark price will be publicly announced after the contract is concluded. * If a bid below the investigation benchmark price is submitted, the bidder with the highest evaluation score may not necessarily be the successful bidder. Please cooperate with the low bid price investigation. Construction Start Period | Applicable/Not Applicable | Details when applicable: * If applicable, construction started on or after April 1, Reiwa 8. * If not applicable, construction started by March 31, Reiwa 8. Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned. The requirements for assigning a site supervisor under Special Exception Article 2, Item 2 are as specified in the tender explanation document. * This is a construction for which the separation and recycling of construction materials, etc., and the recycling of specified construction material waste, etc., are mandated by the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). Applicable | Applicable/Not Applicable | Applicable/Not Applicable * This is a construction to which the Fukushima Prefecture Construction System Pre-submission Method applies. * The disqualification criteria, investigation details, and forms for the Fukushima Prefecture Construction System Pre-submission Method are as specified in the tender explanation document. * To participate in electronic bidding, advance registration is required at the following address. * Electronic Bidding System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html * Electronic Browsing System (Address): https://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html * The site supervisor may be allowed to be the site supervisor for this construction upon application by the successful bidder, with the approval of the ordering party. In this case, the ordering party may impose necessary conditions. * This is a construction where a site supervisor who falls under Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Site Supervisor under Special Exception Article 2, Item 2") can be assigned.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on August 17, 2026. Last refreshed 17 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 福島県

福島県 has issued 187 procurement notices on BidsFactory, including 15 currently open and 68 awarded contracts. Activity concentrates in Construction & Civil Works, Transport & Logistics, and Architecture & Engineering Services. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: September 18, 2026.

Frequently asked questions about this tender

What type of contract is this?

This is a Works contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 福島県 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

福島県
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.