8 High Water Enterprise Planning No. 479
PUBLIC NOTICE
Electronic bidding for post-bid review type limited general competitive bidding will be conducted as follows, in accordance with the provisions of Article 5 of the Kochi City Contract Regulations (Showa 40, Regulation No. 4), as applied mutatis mutandis by Article 5 of the Kochi City Waterworks and Sewerage Bureau Contract Regulations (Showa 47, Waterworks Bureau Regulation No. 2).
September 17, Reiwa 8
Kochi City Waterworks and Sewerage Bureau Administrator
Mifumi Yamamoto
1. Matters for Bidding
(1) Work Name: Kagami River Water Pipe Bridge Repainting Work
(2) Work Location: Tōjinmachi - Yakuchimachi, Kochi City.
(3) Outline of Work: Water pipe bridge repainting
- SP φ900 x 2 lines, φ500 x 1 line L=149.0m A=2,580㎡
(4) Construction Period: From the day after the contract is concluded until March 15, Reiwa 9.
(5) Estimated Price: To be announced after the bid.
(6) Minimum Reserve Price: Yes (To be announced after the bid).
2. This work is subject to the "Procedure for Inquiries Regarding Estimated Price Calculations."
3. Matters concerning the qualifications required for bidding participants and other bidding-related matters are attached separately.
- 2 -
Separate Sheet 1: Matters concerning the qualifications required for bidding participants
Bidding Participation Type: Single Entity
Regional Requirements: Must have its main business office (headquarters) within Kochi City.
Industry: Painting Work
Grade Classification: A grade as of the announcement date.
Permit Classification: Specific or General
Construction Experience, etc.:
Must have completed work that meets the requirements of the "Kochi City Waterworks and Sewerage Bureau Post-Bid Review Type Limited General Competitive Bidding Implementation Guidelines" (hereinafter referred to as "Implementation Guidelines"), as well as the following requirements (proof of construction work, etc., required).
- Steel bridge repainting work including painting of main girders, etc. (contracting industry type is not specified).
Planned Personnel:
Must be able to assign personnel who meet the following requirements, in addition to the provisions of the Implementation Guidelines.
- Must meet the qualification requirements to be engaged as a chief engineer or supervising engineer under Article 26 of the Construction Business Act for the permitted industry of this work.
Ongoing Projects: In accordance with the provisions of Article 4, Items 8 and 9 of the Implementation Guidelines.
2. Participation Application and Bidding Schedule, etc.
Participation Application:
In accordance with Article 7 of the "Implementation Guidelines for Post-Bid Review Type Limited General Competitive Bidding" (hereinafter referred to as "Implementation Guidelines"), those who wish to participate in the bidding must indicate their intention to participate by submitting the bidding documents by the bid submission deadline.
Design Document Inspection:
- Period: From 9:00 AM on September 17, Reiwa 8 until the bid submission deadline.
- Location: Kochi City Waterworks and Sewerage Bureau, 3rd Floor, Planning and Finance Division.
- Electronic Data Viewing:
- Period: From September 17, Reiwa 8 until October 16, Reiwa 8.
- Location: Kochi City Waterworks and Sewerage Bureau, Planning and Finance Division Website.
Inquiries Reception and Response:
- Reception Period: From 9:00 AM on September 17, Reiwa 8 to 4:30 PM on September 29 of the same year.
- Location: Kochi City Waterworks and Sewerage Bureau, 3rd Floor, Planning and Finance Division.
- Submission Method: Submit by FAX or in person (mail is not accepted).
- Response Period: October 2, Reiwa 8.
- Response Method: From the response date until the bid form submission deadline, it will be available for viewing at the Kochi City Waterworks and Sewerage Bureau, 3rd Floor, Planning and Finance Division, and will also be posted on the Kochi City Waterworks and Sewerage Bureau, Planning and Finance Division Website.
- 3 -
Bidding Method, etc.:
This work will be conducted using the Kochi City Electronic Bidding System in accordance with the "Kochi City Waterworks and Sewerage Bureau Electronic Bidding Operation Standards."
Documents to Submit:
1. Bid Form (input via electronic bidding system).
2. Construction Cost Breakdown.
Document Submission Acceptance Period:
From 8:00 AM on October 5, Reiwa 8 to 5:00 PM on October 7, Reiwa 8.
(Please submit after confirming the answers to inquiries.)
Bid Opening:
- Bid Opening Date and Time: 10:00 AM on October 8, Reiwa 8.
- Bid Opening Location: Kochi City Waterworks and Sewerage Bureau, 3rd Floor, Planning and Finance Division.
Inquiry Regarding Estimated Price Calculation:
In accordance with the "Kochi City Waterworks and Sewerage Bureau Construction Work, etc. Estimated Price Calculation Inquiry Procedure Guidelines" (Revised April 1, Reiwa 6; hereinafter referred to as "Guidelines"), inquiries regarding the calculation of the design amount will be accepted.
- "Gold-Included" Design Document Disclosure Time: From 1:00 PM on October 8, Reiwa 8 until the end of the inquiry period.
- Location: Kochi City Waterworks and Sewerage Bureau, 1st Floor, Pipeline Management Division.
- Inquiry Period: From 1:00 PM on October 8, Reiwa 8 to 4:00 PM on October 9 of the same year.
- Inquiry Method: In accordance with Article 8 of the Guidelines, by electronic mail or in person.
- Submission Location: Kochi City Waterworks and Sewerage Bureau, 1st Floor, Pipeline Management Division.
- Email address: kc-240400@city.kochi.lg.jp
- Whether an inquiry has been made will be posted on the "Bidding Schedule, Results, and Contract Information" page of the Kochi City Waterworks and Sewerage Bureau Planning and Finance Division website.
- Publication of Confirmation Results, etc.: If an inquiry is made, it will be posted on the Kochi City Waterworks and Sewerage Bureau Planning and Finance Division website. Publication Date: October 14, Reiwa 8.
Other:
In accordance with Article 12 of the Guidelines, when a successful bid candidate is determined, the bidding qualification requirements, etc., as stipulated in Article 10 of the Implementation Guidelines, will be reviewed.
Submission of Confirmation Documents (for successful bid candidates only):
- Submission Deadline: Within 2 days from the date requested (excluding holidays).
- Location: Kochi City Waterworks and Sewerage Bureau, 3rd Floor, Planning and Finance Division.
- Documents to Submit: Bidding Qualification Confirmation Form. Please prepare this in advance so it can be submitted promptly after the inquiry period for estimated price calculation ends.
- Submission Method: In person, by FAX, or by email (mail is not accepted).
Successful Bid Determination:
Within 2 days from the date of submission of the confirmation form (excluding holidays), the successful bidder will be determined.
Contract Guarantee:
Required.
Location for Display of Contract Terms:
Kochi City Waterworks and Sewerage Bureau, 3rd Floor, Planning and Finance Division.
3. Other:
(1) Bidders must comply with the "Kochi City Waterworks and Sewerage Bureau Construction Work, etc. Competitive Bidding Rules (for Electronic Bidding)" (Revised August 26, Reiwa 6) and the "Kochi City Waterworks and Sewerage Bureau Electronic Bidding Operation Standards" (Revised April 1, Reiwa 6).
(2) If a bidder falls under Article 4, Item 6 or 7 of the Implementation Guidelines among those who have completed the bidding procedures, they will not be granted bidding eligibility. Furthermore, if facts falling under the same item are discovered after bid opening, the bid of that person will be disqualified.
(3) If there are no bidders within the range of the estimated price and the minimum reserve price as a result of the bid opening, a re-bid will be conducted after the bid opening procedure for this work, in accordance with Article 13, Paragraph 3 of the Kochi City Waterworks and Sewerage Bureau Electronic Bidding Operation Standards. If a re-bid is conducted, the bidding participants will be notified via the electronic bidding system (or by other appropriate means for paper bidders).
(4) If a successful bid candidate fails to submit the bidding qualification confirmation form by the deadline, or is deemed not to have bidding eligibility, they will be disqualified.
(5) The successful bidder must conclude the contract within 10 days from the date of notification of successful bid determination. If electronic contracting is desired, submit an "Electronic Contract Acceptance Form" via email after the successful bid determination.
(6) If the successful bidder falls under any of the following circumstances between the date of successful bid determination and the date of contract conclusion, the successful bid determination may be canceled.
A. When the requirements of Article 4, Items 1, 2, 4, or 5 of the Implementation Guidelines are no longer met.
B. When the bidder has been subjected to suspension of designation or similar measures from the Kochi City Waterworks and Sewerage Bureau in accordance with the "Kochi City Competitive Bidding Designation Suspension Measures Ordinance" (established July 1, 1994) (hereinafter referred to as the "Designation Suspension Ordinance").
C. When the bidder falls under a case subject to the Designation Suspension Ordinance.
D. When the bidder has received a business suspension order under Article 28, Paragraph 3 or 5 of the Construction Business Act.
E. When bidding eligibility requirements are no longer met due to other reasons.
(7) If any false statements are found in the submitted documents related to the bidding and contract for this work, the contract may be canceled.
(8) The successful bidder must submit the "Pledge Regarding Compliance with the Antimonopoly Act (Kochi City Waterworks and Sewerage Bureau)" dated December 26, 2011, by the time of contract conclusion. Failure to do so will be considered a withdrawal from the bid, and the contract will not be concluded.
(9) The successful bidder must notify the client of any events that may affect the construction period or contract amount, along with the necessary information to grasp the situation of such events, between the successful bid determination and the contract conclusion, in accordance with Article 20-2, Paragraph 2 of the Construction Business Act.
(10) The contractor shall choose between interim advance payment or partial payment at the time of contract conclusion. Changes after contract conclusion will not be permitted.
(11) This work is a "Two-Day Weekend Work" under the Kochi City Waterworks and Sewerage Bureau "Two-Day Weekend Work" Implementation Guidelines.
(12) Bidders who fall under Article 4, Item 8 A, B, or C of the Implementation Guidelines by the time of bid opening cannot participate in the bidding. Furthermore, if a bidder who falls under the same item becomes the successful bidder before the determination of the successful bidder(s) after bid opening (if there are multiple successful bidders for the same type of work on the same day, determination will proceed in order of descending estimated price), the bid will be invalidated. However, this does not apply to cases falling under Article 4, Item 9 of the Implementation Guidelines.
(13) Other conditions are as specified in the Implementation Guidelines.
4. Department in Charge:
Kochi City Waterworks and Sewerage Bureau, Planning and Finance Division, Contract Section
Address: 1-15-20 Harikikita, Kochi City (Kochi City Waterworks and Sewerage Bureau, 3rd Floor)
Tel: 088-821-9208
FAX: 088-843-6523