[Electronic Bidding] [Electronic Contract] Purchase of Sample Preparation System
About This Opportunity
This is a supplies contract in the general supplies and Research sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums. Proposals must be submitted before September 3, 2026.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for the supply of goods in the general supplies sector. Supply contracts typically require bidders to demonstrate product compliance with technical specifications, delivery capacity, and relevant certifications. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from Japanese[Electronic Bidding] [Electronic Contract] Purchase of Sample Preparation System
We will tender the following by general competitive bidding.
1 Qualification of Bidders (1) Those who are not subject to the provisions of Article 70 and Article 71 of the Public Finance and Accounting Act.
(3) Other qualifications for bidders (as attached) 2 Deadline for submission of bids 3 Mailing of bids 4 Other For details, refer to the "Tender Document".
Contract Management Number 0812C00370 General Competitive Bidding Announcement Reiwa 8/07/10 Director of Procurement and Contracts Naoya Matsumoto National Research and Development Agency Japan Atomic Energy Agency Subject Purchase of Sample Preparation System Quantity 1 set Bid Method (1) Total price.
(2) Submission of documents and bidding will be conducted through the electronic bidding system.
Method of Distributing Tender Documents Organization's website (Tender Information, etc.) or the contracting officer Deadline for Distribution Until Reiwa 8/07/27 Tender Explanation Meeting Date and Time and Location None Bid Deadline and Location Reiwa 8/09/03 10:00 Via Electronic Bidding System.
Bid Opening Date and Time and Location Reiwa 8/09/03 10:00 Via Electronic Bidding System.
Contract Period (Delivery Date) Reiwa 9/03/31 Delivery (Implementation) Location International Research Center for Nuclear Materials and Fuel Cycle, Decommissioning and Environmental Management (International Research Building) Contract Terms Sales Contract Terms Contracting Officer Finance and Contracts Department, Business Contracts Division 1 Sumika Yamada (External: 080-9410-0449 Extension: 803-41010 E-mail: yamada.sumika@jaea.go.jp) (2) Those who are rated in grades A, B, C, or D in "Sales of Goods" for the relevant fiscal year in either the national qualification for participation in competitive bidding (unified qualification for all ministries) or the qualification for participation in competitive bidding of the National Research and Development Agency Japan Atomic Energy Agency.
Those who have not undergone the qualification examination for participation in competitive bidding must undergo the examination before the bid opening and be recognized as qualified.
Special Provisions None Place where terms are indicated Organization's website (Basic matters related to procurement contracts) or the contracting officer Bid Bond Exemption Reiwa 8/09/03 10:00 Not applicable *Electronic Bidding Portal Site http://www.jaea.go.jp/02/e-compe/index.html The qualifications and requirements for participation in this bid are as follows.
*Before participating in competitive bidding, you must submit a "Power of Attorney/Seal Registration Form" and a "Bank Transfer Request Form", etc. Please submit them as follows.
https://www.jaea.go.jp/for_company/supply/format/a02.html Required Qualifications Technical Requirements None (1) Those who are not subject to the provisions of Article 70 and Article 71 of the Public Finance and Accounting Act.
(2) Those who are rated in grades A, B, C, or D in "Sales of Goods" for the relevant fiscal year in either the national qualification for participation in competitive bidding (unified qualification for all ministries*) or the qualification for participation in competitive bidding of the National Research and Development Agency Japan Atomic Energy Agency.
Those who have not undergone the qualification examination for participation in competitive bidding must undergo the examination before the bid opening and be recognized as qualified.
(3) Not subject to a suspension of business from this organization.
(4) Not a business that has been requested by the police authorities to be excluded from procurement contracts such as construction work, surveying, manufacturing of goods, and provision of services, as being substantially controlled by a member of a crime syndicate or equivalent, and such situation is ongoing.
Bid Participation Qualification Requirements, etc.
Specifications Purchase of Sample Preparation System Reiwa 8/07 National Research and Development Agency Japan Atomic Energy Agency Fukushima Decommissioning Safety Engineering Research Institute Decommissioning and Environmental Management International Joint Research Center Decommissioning Management Group 1. Subject Purchase of Sample Preparation System 2. Purpose This specification is for the purchase of a set of equipment necessary for sample preparation in the "Development of technologies for rapid and efficient analysis of nuclear materials and difficult-to-analyze elements (Development of technologies for rapid and efficient analysis of alpha-emitting and beta-emitting radionuclides)" undertaken by the National Research and Development Agency Japan Atomic Energy Agency, Fukushima Decommissioning Safety Engineering Research Institute, Decommissioning and Environmental Management International Joint Research Center.
3. Purchased Item Specifications ●Fume Hood Set (Equivalent items allowed) 3.1. Fume Hood CBE-Rc15-H1-S Shimadzu Rika 1 set 3.2. Exhaust Fan (Outdoor installation) 1 set However, the following specifications must be met.
No. Item Content 1 External Dimensions W1500 x D750 x H2250 (±10mm).
2 Internal Dimensions W1350 x D580 x H900 or more.
3 Exterior Trespa.
4 Interior Trespa.
5 Baffle Plate Trespa.
6 Air Foil Trespa.
7 Work Surface Ceramic with chemical resistance, heat resistance, antibacterial, and anti-fouling properties.
8 Front Door Tempered glass 6mm, counterbalanced type.
9 Opening Limit Stopper One unit at a height of 340mm.
10 Lighting LED, base light (20W type).
11 Water Faucet/Drainage Outlet Not required 12 Outlet AC100V 15A (with ground, 2-gang, locking type) included x 2.
13 Control Panel Functions for exhaust fan switch (ON/OFF, timer operation), lighting switch, alarm display, buzzer, and mute switch.
14 Status Bar A status bar shall be provided on the upper part so that the operating status can be visually confirmed from a distance.
15 Exhaust Fan An exhaust fan shall be selected and installed with an exhaust capacity of 0.5 m/s or more when the sash is half-open.
16 Installation After installing the fume hood in the designated location, it shall be fixed to the floor with anchors.
17 Electrical Connection Connection from the building's power distribution panel to the equipment.
18 Duct Connection Connection from the fume hood body to the outdoor exhaust fan.
19 Trial Run and Adjustment After installation work is completed, trial run and adjustment, and airflow measurement shall be performed, and a report shall be submitted.
Transportation, delivery and installation work, secondary electrical connection work, and secondary duct connection work are included in this procurement.
Duct connection work includes the connection of exhaust from the existing microwave equipment and the removal of existing ducts.
●Tool Pre-setter (Equivalent items allowed) 3.3. Tool Pre-setter (Mini Ace Double) MA-W3025 Kyori Seiki 1 set 4. Removal of Existing Equipment Existing ducts shall be removed before installing the fume hood and the new exhaust fan.
The removed items shall be moved to the location designated by the Nuclear Agency.
5. Delivery Date Reiwa 9/03/31 (Wednesday) 6. Delivery Location and Conditions 6.1 Delivery and Installation Location 790-1 Muramatsu, Tomioka-cho, Futaba-gun, Fukushima Prefecture National Research and Development Agency Japan Atomic Energy Agency Fukushima Decommissioning Safety Engineering Research Institute Decommissioning and Environmental Management International Joint Research Center Laboratory 4 and Laboratory 4 Outdoor (see attachment) 6.2 Delivery Conditions Delivery after installation and adjustment (1) Installation After installing the fume hood in the designated location, it shall be fixed to the floor with anchors.
(2) Connection to Power Supply Connect from the existing power distribution panel (experiment panel A4-3, approximately 10m cable required) at the planned installation location of the fume hood.
(3) Installation and Connection of New Exhaust Fan and Ducts After removing the existing ducts, install a new exhaust fan and ducts with sufficient performance to ensure the fume hood operates correctly.
Also, connect the fume hood and the new exhaust fan using the newly installed ducts.
7. Submitted Documents Document Name Submission Deadline Number of Copies Meeting Minutes (if held) Promptly after holding 1 copy Approval of subcontractors or small and medium-sized contractors, etc. (Organization's designated format) *1 Before delivery work 1 copy Inspection Plan and Report 1 week before delivery 1 copy Inspection Report *2 Upon delivery 1 copy User Manual *3 Upon delivery (electronic media also acceptable) 1 copy each Other Documents/Drawings To be determined in consultation with the Nuclear Agency 1 copy *1 Submit only if subcontracting to small and medium-sized contractors, etc. *2 After installation work of the fume hood is completed, trial run and adjustment, and airflow measurement shall be performed, and a report shall be submitted.
*3 Only the user manual for the 3.3 Tool Pre-setter shall be submitted. (Submission Location) National Research and Development Agency Japan Atomic Energy Agency Fukushima Decommissioning Safety Engineering Research Institute Decommissioning and Environmental Management International Joint Research Center Decommissioning Management Group 8. Inspection Conditions Inspection will be completed upon successful completion of quantity inspection, external inspection, operational check, and submission of documents specified in Article 7 after delivery to the location specified in Article 6.
9. Promotion of Green Purchasing Act (1) In this contract, environmental goods applicable to the Green Purchasing Act (Act on Promoting the Procurement of Environmental Goods by the State and Other Entities) (office supplies, OA equipment, etc.) shall be adopted if possible.
(2) The submitted documents (delivered printed matter) specified in this specification shall meet the standards for "paper products" stipulated in the basic policy of the Green Purchasing Act.
10. Consultation If any doubt arises regarding matters described in this specification or matters not described in this specification, the matter shall be decided in consultation with the Nuclear Agency representative.
11. Special Provisions (1) If an emergency occurs during the installation of purchased items in the Nuclear Agency's facilities, the contractor shall act in accordance with the instructions of the Nuclear Agency.
Furthermore, if an emergency occurs due to work under the contract, the contractor shall analyze the cause and consider countermeasures, take the initiative in improving the situation, and obtain confirmation from the Nuclear Agency on the results of the cause analysis and countermeasure considerations.
End
Attachment: Installation location of fume hood and exhaust fan in Laboratory 4 and Laboratory 4 Outdoor
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on July 10, 2026. Last refreshed 15 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 国立研究開発法人日本原子力研究開発機構福島
国立研究開発法人日本原子力研究開発機構福島 has issued 18 procurement notices on BidsFactory, including 6 currently open and 2 awarded contracts. Activity concentrates in General Supplies & Services, Research & Innovation, and Information & Communication Technology. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: July 22, 2026.
Frequently asked questions about this tender
When does this tender close?
The submission deadline is September 3, 2026. You have 28 days left to prepare and submit your proposal to the contracting authority.
Who is the contracting authority?
This notice was issued by 国立研究開発法人日本原子力研究開発機構福島 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Supplies contract in the General Supplies & Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.