Tenders/Traffic Safety Facility Improvement Work (Municipal Road Hongō-chō Horikamezu Line, etc.)
Open🇯🇵JapanWorks

Traffic Safety Facility Improvement Work (Municipal Road Hongō-chō Horikamezu Line, etc.)

Auto-translated from Japanese
Original title: 交通安全施設整備工事(市道本郷町堀亀津線外)
広島県三原市
Published: Sep 7, 2026
Updated: Sep 11, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the transport and logistics and construction and civil works sectors, with a focus on Roads and Warehousing. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the transport and logistics sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Tender Announcement Regarding the following construction work ordered by Mihara City, conditional open bidding will be conducted. This is announced in accordance with the provisions of Article 9 of the Mihara City Contract Regulations (2005 Ordinance No. 63). Furthermore, this is an electronic bidding project where procedures up to the bid opening will be conducted using the electronic bidding system jointly operated by local governments in Hiroshima Prefecture (hereinafter referred to as the "Electronic Bidding System"). The "Mihara City Electronic Bidding Implementation Guidelines" will apply to the administrative procedures. 1. Project Name 2. Construction Location 3. Type of Construction 4. Project Outline 5. Construction Period 6. Estimated Price 7. Bid Participation Qualification Requirements 8. Documents to Submit 10. Schedule until Bid Opening 11. Design Documents, etc. 12. Precautions 9. Contract Deposit Please submit the "Conditional Open Bidding Participation Application Form (Form No. 3)" and the "Pledge (Form No. 4)" via the electronic bidding system or in person. This project will be executed based on the "Mihara City Conditional Open Bidding Implementation Manual for Construction Work." September 7, Reiwa 8 (2026) Mayor of Mihara City, Yoshihiro Okada Traffic Safety Facility Improvement Work (Municipal Road Hongō-chō Horikamezu Line, etc.) Funaki, Hongō-chō, Mihara City, etc. Pavement Work Construction length: L = 2440m Line marking work: L = 2440m Pavement work: A = 36.0m2 From the day after the contract date to January 5, Reiwa 9 (2027) 2,718,000 yen (excluding consumption tax and local consumption tax) Entities with a head office in Mihara City (limited to those with a head office in the Hongō region). ① Industry related to the target work, and location of the business office with construction industry permit. ② Industries certified as eligible for Mihara City construction work bids in Reiwa 7/8. Pavement Work C, D, E ③ Comprehensive evaluation score of management status examination at the time of application for Reiwa 7/8 bid participation. ④ Construction experience: Not applicable. ⑤ Construction industry permit type: Entities with a specific or general construction industry permit. Entities that can appropriately assign personnel with qualifications as engineers required for the target work according to the contract amount. Entities with a direct and continuous employment relationship with the bidder. ⑥ Engineers This project has a minimum reserve price set. An itemized cost breakdown is required at the time of bidding. Invalid bids are as specified in V4 of the "Basic Matters of Mihara City Conditional Open Bidding Announcement for Construction Work." ⑦ Other: Exempt. From Monday, September 7, Reiwa 8 (2026) to Monday, September 14, Reiwa 8 (2026), from 9:00 AM to 5:00 PM each day (excluding Saturdays, Sundays, and holidays). ① Bid participation application acceptance period ② Qualification confirmation result notification: From Tuesday, September 15, Reiwa 8 (2026) ③ Question submission deadline: Monday, September 14, Reiwa 8 (2026), 5:00 PM (After sending an email, call 0848-67-6093 immediately). ④ Question submission destination: Planning and Finance Department, Contract Division (E-mail: keiyaku@city.mihara.hiroshima.jp) Friday, September 18, Reiwa 8 (2026) Posted on the Mihara City website. Answers will be provided sequentially as they are prepared. ⑤ Deadline and method for answering questions Thursday, September 24, Reiwa 8 (2026) and Friday, September 25, Reiwa 8 (2026) Day 1: 9:00 AM to 5:00 PM, Day 2: 9:00 AM to 4:00 PM ⑥ Bidding period ⑦ Bid opening date and time: Monday, September 28, Reiwa 8 (2026), 9:20 AM ⑧ Bid opening location: Conference Room 303, 3rd Floor, Mihara City Hall Main Building ① Viewing period: Monday, September 7, Reiwa 8 (2026) to Friday, September 25, Reiwa 8 (2026) ② Viewing location: Posted on the Mihara City website. - Please confirm the basic matters of the "Mihara City Conditional Open Bidding Announcement for Construction Work" and the "Mihara City Electronic Bidding Implementation Guidelines," and follow the bidding conditions and instructions set by Mihara City. - The successful bidder must assign personnel with qualifications as engineers required for the target work and submit the "Site Manager and Chief Engineer Notification." Site managers and engineers must have a direct and continuous employment relationship. If an engineer cannot be assigned, the successful bid will be canceled. 10150 Weekly Two-Day Holiday Exemption Construction ③ Certified as eligible for Mihara City construction work bids in Reiwa 7/8. Conditional Open Bidding Participation Application and Pledge (Form No. 2) must be submitted via the electronic bidding system. Reiwa Year Month Day Reiwa 8 (2026) Construction Content Construction length: L = 2,440m Pavement work: A = 36m2 Line marking work: L = 2,440m Mihara City Project Number Construction Year Traffic Safety Facility Improvement Work (Municipal Road Hongō-chō Horikamezu Line, etc.) Construction Date Construction Method Contract Funaki, Hongō-chō, Mihara City Specifications Construction Period Project Outline Reason for Commencement Chapter 1 General Provisions Section 1 Application 1. This special specification applies to the "Traffic Safety Facility Improvement Work (Municipal Road Hongō-chō Horikamezu Line, etc.) in Funaki, Hongō-chō, Mihara City, etc." 2. Matters not described in this special specification shall be handled as follows: - Civil Engineering Work Common Specifications (August, Reiwa 8) Hiroshima Version (Applicable categories "Hiroshima" and "Hiroshima Prefecture") * Civil Engineering Work Common Specifications and Special Specifications (Common Matters) are posted on "Hiroshima Prefecture Procurement Information." https://chotatsu.pref.hiroshima.lg.jp/ - Other related standards Section 2 Section 3 Compliance with Laws and Ordinances, etc. 1. The following items shall be described in the "Other" section of the construction plan: (1) "Procedures and permit conditions based on laws and ordinances" to be performed by the contractor or specified by the ordering party in carrying out the work. (2) "Response methods in case of unforeseen circumstances, etc." for the matters in (1) above. (3) "Methods of informing site workers" for the matters in (1) and (2) above. 2. Permit and approval conditions shall be appropriately reflected in related sections such as "Construction Method." 3. If there are any changes to the "Procedures and permit conditions based on laws and ordinances," it shall be considered a significant change to the construction plan, and a revised construction plan shall be submitted. Section 4 Construction By-products 1. Recycled Resource Utilization Plan and Recycled Resource Promotion Plan 2. Posting and Publication of Plans 3. Submission of Implementation Report SPECIAL SPECIFICATIONS Weekly Two-Day Holiday Applicable Construction: This project is not subject to weekly two-day holiday construction. This project is not subject to weekly two-day holiday construction. Construction by-products in this project will be handled in accordance with Civil Engineering Work Common Specifications 1-1-2-11 Construction By-products. The submission of "Recycled Resource Utilization Plan," "Recycled Resource Utilization Promotion Plan," and "Implementation Report" will be as follows: When bringing concrete, construction materials made of concrete and iron, wood, asphalt mixture, etc., to the construction site, the contractor shall prepare a recycled resource utilization plan in accordance with laws and regulations and submit it to the supervisor as part of the construction plan. In addition, when removing construction waste soil, concrete lumps, asphalt-concrete lumps, construction waste wood, construction sludge, or mixed construction waste, etc., from the construction site, the contractor shall prepare a recycled resource utilization promotion plan (including the confirmation results form in item 5) in accordance with laws and regulations and submit it to the supervisor as part of the construction plan. If there are any changes to the contents, the utilization plan and promotion plan shall be promptly changed and reported to the supervisor. The contractor shall post the recycled resource utilization plan and recycled resource utilization promotion plan in a visible location at the construction site (posting via digital signage is also possible) for public viewing, and endeavor to publish them via the internet. The format for site posting can be created by referring to the following URL: https://www.mlit.go.jp/sogoseisaku/region/recycle/d03project/d0306/page_03060101credas1top.htm If the contractor prepares a recycled resource utilization plan and a recycled resource utilization promotion plan, they shall promptly submit the recycled resource utilization implementation report and the recycled resource utilization promotion implementation report, which record the implementation status, to the supervisor after the completion of the work. The contractor shall retain the recycled resource utilization implementation report and the recycled resource utilization promotion implementation report for five years after the completion of the work. 4. Construction Site Management System 5. Confirmation of Procedures Related to Laws and Regulations for Construction Waste Soil Export and Creation of Confirmation Results Form (1) (2) Matters related to the act of bringing construction waste soil into the destination specified in the recycled resource utilization promotion plan, including the following. (3) 6. Notification to Transportation Contractors 7. Posting and Publication of Confirmation Results Form 8. Storage of Confirmation Results Form The contractor shall retain the confirmation results form for five years after the completion of the construction work. 9. Request for Delivery Receipt from Construction Waste Soil Destination (1) Name and location of the destination for construction waste soil (if the destination is a construction site, the name of the construction project). (2) Company name, trade name, or name of the contractor at the destination of construction waste soil. (3) Name and location of the origin of construction waste soil. (4) Amount of construction waste soil. (5) Date of completion of construction waste soil export. 10. Delivery Receipt to Construction Waste Soil Origin 11. Confirmation of Delivery Receipt Contents When the contractor receives a delivery receipt from the destination, the contractor shall confirm that it matches the contents specified in the recycled resource utilization promotion plan. 12. Storage of Delivery Receipt The contractor shall retain the delivery receipt or a copy thereof for five years after the completion of the construction work. 13. Confirmation of Final Destination of Construction Waste Soil The contractor shall establish a management system by appointing a construction by-product manager at the construction site to promote recycling, and shall provide thorough training to site personnel on the contents of the recycled resource utilization plan and recycled resource utilization promotion plan, and instruct related contractors and material suppliers to ensure full understanding. When preparing the recycled resource utilization promotion plan, the contractor shall confirm the following matters in advance when exporting construction waste soil from the construction site, and create a document (confirmation results form) that records the results of confirmation for each matter. * Confirmation results form is posted on "Hiroshima Prefecture Procurement Information." If excavation of land within the construction site or other changes to the nature of the land require notification under Article 3, Paragraph 7 or Article 4, Paragraph 1 of the Soil Contamination Countermeasures Act (2002 Law No. 53), such notification has been made. A. If the act requires permission under Article 12, Paragraph 1, Article 16, Paragraph 1, Article 30, Paragraph 1, or Article 35, Paragraph 1 of the Land Subdivision and Development Control Act (1961 Law No. 191; hereinafter referred to as the "Landslide Control Act"), such permission has been obtained. B. If the act requires notification under Article 21, Paragraph 1, Article 27, Paragraph 1, Article 28, Paragraph 1, or Article 40, Paragraph 1 of the Landslide Control Act, such notification has been made. In addition to the matters listed in (1) and (2) above, matters necessary to confirm the appropriateness of the destination specified in the recycled resource utilization promotion plan and other matters related to the export of construction waste soil. The contractor shall notify the person transporting the construction waste soil of the contents of the recycled resource utilization promotion plan and the confirmation results form. If there are any changes to the contents, the transporter shall be notified promptly. The contractor shall post the confirmation results form in a visible location at the construction site (posting via digital signage is also possible) for public viewing, and endeavor to publish it via the internet. When the contractor transports construction waste soil to the destination specified in the recycled resource utilization promotion plan, the contractor shall promptly request a delivery receipt from the manager of the destination (if the destination is a construction site, the contractor of that construction project) that includes the following matters. The contractor shall promptly issue a delivery receipt to the manager of the origin (if the origin is a construction site, the contractor of that construction site) when construction waste soil is brought in from the origin specified in the utilization plan, stating the matters listed in the preceding item. (1) Places managed by national or local governments, for which a delivery receipt is issued by the national or local government upon completion of acceptance. (2) Temporary storage for use at other construction sites under the contractor's management. (3) Stockyards registered with the national government under the Stockyard Operator Registration Regulations. (4) Construction waste soil receiving sites where the type of soil utilization in the delivery receipt in item 9 is "Embankment utilization, etc." (no re-export). Section 5 Pollution Control 1. Pre- and Post-Construction Surveys Survey Category: Pre-construction, during construction, and post-construction (within 1 month). If a complaint of significant damage is received during construction, conduct a survey in consultation with the supervisor. Investigation Content: Inclination and damage status of pillars, roofs, walls, foundations, fixtures, etc. Scope: To be discussed separately. Section 6 Safety Measures 1. Traffic Guidance Staff/Guard Boats/Safety Personnel: Approximately 2 traffic guidance staff per day are expected during the construction period. Section 7 Other 1. Temporary Storage Area for Construction Materials and Equipment: The contractor shall be responsible for management. Rental fees, etc., shall be borne by the contractor. 2. Construction Insurance, etc. 3. Statutory Outside Workers' Accident Insurance Coverage 1. In this project, the contractor shall be covered by statutory outside workers' accident insurance. 2. 3 Chapter 2 Design Cost Section 1 Promotion of Use of Emission-Reduced Construction Machinery 1 Chapter 3 Other If there are any unclear points regarding this special specification or design documents, or if any doubts arise regarding their content, consult with the supervisor. Note: Design changes will not be made based on emission standards for emission-reduced construction machinery to be used. If construction waste soil is transported from the destination specified in the recycled resource utilization promotion plan to another destination (excluding destinations falling under any of the following (1) to (4)), the contractor shall promptly prepare a document stating the matters related to items 9(1) to (5) regarding the transport to that other destination, and retain such document for five years after the completion of the construction project related to the recycled resource utilization promotion plan. The same shall apply if the construction waste soil is further transported to another destination. Conduct surveys in consultation with the supervisor if a complaint of significant damage is received during construction, pre- or post-construction. (Subject to design changes.) The contractor shall obtain insurance to cover damages caused to third parties or other necessary construction-related insurance. The insurance certificate or equivalent shall be submitted to the supervisor. Insurance premiums, etc., required for coverage are included in the site management costs in the design. In accordance with Article 54 (Fire Insurance, etc.) of the Construction Contract Agreement, the contractor shall promptly present the insurance certificate or equivalent to the supervisor upon concluding a contract for statutory outside workers' accident insurance. Statutory outside workers' accident insurance is intended to provide additional benefits beyond government workers' accident compensation insurance. Contracts shall be concluded with the Construction Industry Welfare Mutual Aid Association, the Construction Industry Workers' Accident Mutual Aid Association, the All Japan Fire Mutual Aid Cooperative Federation, the National Federation of Labor Insurance Administrative Scrivener Associations, or an insurance company in accordance with the Workers' Accident Compensation Insurance Act. In accordance with "1-1-1-35 Environmental Measures" of the Civil Engineering Work Common Specifications (August, Reiwa 8), the use of emission-reduced construction machinery is mandatory. Efforts should be made to use construction machinery that meets or exceeds the emission standards (2nd level).

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on September 7, 2026. Last refreshed 5 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 広島県三原市

広島県三原市 has issued 168 procurement notices on BidsFactory, including 6 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: September 7, 2026.

Frequently asked questions about this tender

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 広島県三原市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Transport & Logistics sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

広島県三原市
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.