Hiroshima Airport Aviation Lighting Installation and Other Construction
BID ANNOUNCEMENT We will conduct a general competitive tender as follows. Reiwa 8, September 9, Disbursing Officer Director-General of Osaka Regional Civil Aviation Bureau Daisuke Umezawa 1. Construction Overview (1) Construction Name Hiroshima Airport Aviation Lighting Installation and Other Construction (Electronic Bidding and Electronic Contract Target Project) (2) Construction Location 64-34 Zennyoji, Hongō-chō, Mihara City, Hiroshima Prefecture (within Hiroshima Airport) (3) Construction Details This project involves the removal, temporary installation, installation, and relocation of standard approach lights, runway end lights (10 side, 28 side), approach slope indicator lights, runway lights, runway centerline lights, taxiway lights, and runway guard lights due to the RESA improvement at Hiroshima Airport. 1) Standard Approach Light Installation Construction Sign lights Ground-mounted installation Sign lights Recessed installation and other ancillary work 48 lights 11 lights 1 set 2) Runway End Light (10 side) Installation Construction Sign lights Ground-mounted installation Sign lights Recessed installation and other ancillary work 11 lights 21 lights 1 set 3) Approach Slope Indicator Light Installation Construction Approach slope indicator lights P-type (bulb type) (supplied) Monitoring device installation (reused) Light receiver installation (post, connector D-3 attached) (reused) and other ancillary work 8 lights 2 units 8 units 1 set 4) Runway Light Installation Construction Sign lights Ground-mounted installation Series lighting circuit mold transformer LT-200 (reused) and other ancillary work 12 lights 9 units 1 set 5) Runway End Light (28 side) Installation Construction Sign lights Ground-mounted installation Sign lights Recessed installation 2 lights 20 lights 2 other ancillary work 1 set 6) Runway Centerline Light Installation Construction Sign lights Recessed installation and other ancillary work 9 lights 1 set 7) Taxiway Light Installation Construction Sign lights Ground-mounted installation and other ancillary work 31 lights 1 set 8) Runway Guard Light Installation Construction Sign lights Ground-mounted installation and other ancillary work 2 lights 1 set 9) Removal Work Removal work associated with items (1) to (8) above 1 set *Details are as per specifications, etc. [Delivery Location for Supplied Materials] - Hiroshima Airport Office: 64-34 Zennyoji, Hongō-chō, Mihara City, Hiroshima Prefecture (4) Construction Period From the weekday following the contract date until March 18, Reiwa 9 (5) This construction project is subject to electronic procurement system for bidding and contracting. If it is difficult to use the electronic procurement system, paper bidding and paper contracting may be used with the approval of the contracting authority. (6) This construction project is subject to the comprehensive evaluation and bidding method (construction capability evaluation type (Type I)), which determines the successful bidder by comprehensively evaluating factors other than price along with price. It is also a trial project for the construction system confirmation type comprehensive evaluation and bidding method, which examines and evaluates the ability to reliably realize the construction content by confirming the system for quality assurance and other construction systems. (7) This construction project is a trial project for the post-contract VE method, which accepts proposals for construction methods, etc. after the contract is concluded. (8) This construction project is subject to the obligation of separate demolition, etc. and recycling of specified construction waste, etc., based on the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). (9) This construction project does not allow the assignment of a supervising engineer (hereinafter referred to as "special supervising engineer") applicable to the proviso of Article 26, Paragraph 3 of the Construction Industry Act. (10) This construction project is a project for which additional points are given in the comprehensive evaluation for companies that implement wage increases. (11) This construction project is a trial project for the "Company Capability Evaluation Type 3" in the comprehensive evaluation and bidding method, which evaluates only the company's capabilities. (Details are in the tender documents.) (12) This construction project is a trial project for the comprehensive evaluation and bidding method, for which additional points are given to companies certified as promoting work-life balance, etc. (WLB, etc. promotion companies) based on laws and regulations. For details, please refer to the tender documents. (13) This construction project is subject to design changes based on the changes in the distribution of construction materials due to changes in the Middle East situation. 2. Competitive Bidding Qualifications (1) Not falling under the provisions of Article 70 of the Budget, Settlement, and Accounting Order (Imperial Ordinance No. 165 of 1947) (hereinafter referred to as "Budgetary Order"). Persons who are minors, under guardianship, or under assistance, and who have obtained the necessary consent for concluding the contract, fall under the case of special reasons in the same article. (2) Not falling under the provisions of Article 71 of the Budgetary Order. (3) Must be rated in Grade A for "Electrical Works" in the Reiwa 7 & 8 Ministry of Land, Infrastructure, Transport and Tourism General (Designated) Competitive Bidding Qualifications by the bid opening date, and have competitive bidding qualifications in the Osaka Regional Civil Aviation Bureau (For those for whom rehabilitation proceedings have been initiated based on the Company Rehabilitation Act (Act No. 154 of 2002) or for whom reorganization proceedings have been initiated based on the Civil Rehabilitation Act (Act No. 225 of 1999), re-certification of general competitive bidding qualifications based on procedures separately determined by the Director-General of the Osaka Regional Civil Aviation Bureau of the Ministry of Land, Infrastructure, Transport and Tourism after the decision to commence proceedings has been made.). Those who do not have such qualifications will have their competitive bidding qualifications accepted according to the application method, etc. described in the "Public Notice on Qualifications of Competitive Bidders" (Official Gazette dated October 1, Reiwa 6). (4) Not a person for whom rehabilitation proceedings have been initiated based on the Company Rehabilitation Act or for whom reorganization proceedings have been initiated based on the Civil Rehabilitation Act. However, this does not apply to those who have received re-certification under (3). (5) Not subject to suspension of business, etc. based on the "Standards for Measures such as Suspension of Business for Contracts for Works under the Jurisdiction of the Civil Aviation Bureau" (Notification No. 386 dated June 28, 1984) by the Director-General of the Osaka Regional Civil Aviation Bureau of the Ministry of Land, Infrastructure, Transport and Tourism between the deadline for submission of the competitive bidding qualification application form (hereinafter referred to as "Application Form") and supporting documents (hereinafter referred to as "Documents") and the bid opening date. (6) There is no capital or personnel relationship between the bidders (or the constituent members of a joint venture). Please note that contacting each other for the purpose of deciding on withdrawal when such relationships exist does not violate the provisions of Article 4-3, Paragraph 2 of the Ministry of Land, Infrastructure, Transport and Tourism Civil Aviation Bureau Competitive Contract Bidder's Handbook. (7) Not a person who has been requested by the police authorities to be excluded from public works, etc. of the Ministry of Land, Infrastructure, Transport and Tourism as a person whose management is substantially controlled by a gangster or a person equivalent thereto, and such state continues. (8) Not a contractor of design work, etc. related to this construction project, or a construction company related to such contractor in terms of capital or personnel (for details, refer to the tender documents). (9) Must meet all the requirements for competitive bidding qualifications separately determined by the Director-General of the Osaka Regional Civil Aviation Bureau, the disbursing officer, based on the provisions of Article 73 of the Budgetary Order (for details, refer to Attached Document 1 "Requirements for Competitive Bidding Qualifications"). (10) Must have received the tender documents or downloaded them from the electronic procurement system. 3. Bidding Procedures, etc. (1) Department in Charge As per Table 1. (2) URL and Contact Information for Electronic Procurement System Electronic Procurement System https://www.p-portal.go.jp/pps-web-biz/ Procurement Portal / Electronic Procurement System Help Desk Phone Number 0570-000-683 (Navi Dial) 03-4332-7803 (For IP phone users) (3) Period and Method of Tender Document Distribution As per Table 1. (4) Submission Period, Location, and Method for Application Form and Documents As per Table 1. (5) Date, Time, Location, and Method of Bid Submission for Bidding and Bid Opening As per Table 1. 4. Other (1) Language and Currency to be used in procedures Japanese language and Japanese currency only. (2) Bid Security and Contract Security 1) Bid Security Exempt. 2) Contract Security To be paid. However, interest-bearing national bonds or guarantees from financial institutions may be provided as collateral in lieu of contract security. Furthermore, if a public works performance bond insurance policy is provided or a performance guarantee insurance contract is concluded, the payment of contract security will be exempted. For details, refer to the tender documents. (3) Invalid Bids Bids submitted by persons who do not have the competitive bidding qualifications stated in this announcement, bids submitted by persons who have made false statements in their application form or supporting documents, and bids that violate the conditions of bidding shall be deemed invalid. (4) Determination of Successful Bidder The successful bidder shall be the one with the highest evaluation score among bids within the limit of the estimated price prepared based on the provisions of Article 79 of the Budgetary Order. However, if it is recognized that the contract may not be performed in accordance with its content by the person who would be the successful bidder due to their bid price, or if it is recognized that it is extremely inappropriate to conclude a contract with that person as it may disrupt the order of fair trade, another bidder who bid within the limit of the estimated price and has the highest evaluation score may be selected as the successful bidder. If the bid price of the person who would be the successful bidder falls below the investigation standard price based on Article 85 of the Budgetary Order, an investigation will be conducted according to Article 86 of the Budgetary Order. (5) Confirmation of Assigned Supervising (or Chief) Engineer If a violation of the exclusivity rule for the assigned engineer is confirmed through CORINS or other means after the successful bidder is determined, the contract may not be concluded. Replacement of the application form will not be permitted unless approved as unavoidable due to various circumstances. (6) For projects where the assignment of an exclusive supervising (or chief) engineer is mandatory, if the contract is concluded at a price below the investigation standard price, an engineer with equivalent qualifications may be required to be assigned in addition to the exclusive supervising (or chief) engineer. (Refer to tender documents) (7) Negotiation during procedures: None. (8) Requirement for Contract Creation: Required. This project is subject to electronic exchange of documents related to contract procedures through the electronic procurement system. If the electronic procurement system is difficult to use, a request for approval of paper contracting may be submitted to switch to the paper contracting method. (9) Intention to conclude a discretionary contract with the contractor of this project for other construction contracts directly related to this project: None. (10) After bid opening, all bidders who submitted bids within the range of the estimated price will be subject to a hearing for construction system confirmation, etc. Additional documents may also be requested. (11) Participation by those who have not been certified with general competitive bidding qualifications: Those who have not been certified with the general competitive bidding qualifications listed in 2 (3) can also submit an application form and supporting documents according to 3 (4), but to participate in competitive bidding, they must be certified with the qualifications listed in 2 (3) at the time of bid opening. (12) Post-contract VE proposal: After the contract is concluded, the contractor may propose to the contracting authority changes to the design documents that allow for a reduction in the contract price without lowering the functions, performance, etc. of the contracted work object specified in the design documents. If the proposal is deemed appropriate, the design documents will be amended, and if deemed necessary, the contract price will be changed. Details are in the special specifications, etc. (13) Notes on Construction Plan: In the qualification examination, if a construction plan is not submitted, or if the content of the construction plan is deemed inappropriate, such as being created through consultation with other bidders regarding this project, competitive bidding qualifications will not be granted. (14) Other Details: For details, please refer to the tender documents. (Bid Announcement) Attached Document 1 Requirements for Competitive Bidding Qualifications Project Name: Hiroshima Airport Aviation Lighting Installation and Other Construction Bid Announcement Regarding "Meeting all requirements for competitive bidding qualifications separately determined by the Director-General of the Osaka Regional Civil Aviation Bureau, the disbursing officer, based on the provisions of Article 73 of the Budgetary Order" in 2 (9) above, the following shall apply. (1) Company's Construction Experience The company must have construction experience in projects completed and delivered between April 1, Reiwa 23 and the announcement date, meeting either of the following requirements (contracts awarded by private entities or overseas projects certified by overseas infrastructure project engineer certification/award systems are also acceptable) (limited to experience as the prime contractor. Experience as a constituent member of a joint venture under Type A agreement is limited to cases where the capital contribution ratio is 20% or more. Experience under Type B agreement is limited to the scope of work divided in the project, and the capital contribution ratio is not considered.). If the construction performance evaluation for projects awarded by the Ministry of Land, Infrastructure, Transport and Tourism or the Okinawa General Bureau of the Cabinet Office has been notified, projects with a performance evaluation score of less than 65 points are excluded. Construction Experience Similar Projects Installation of airfield lighting as defined in Article 114 of the Ordinance for Enforcement of the Civil Aeronautics Act at national, company-managed, local-managed, joint-use, or other airports (for overseas experience certified by overseas certification/award systems, lighting equivalent to airfield lighting as defined in Article 114 of the Ordinance for Enforcement of the Civil Aeronautics Act), or installation of airfield and aviation security facilities at airfields operated by the Self-Defense Forces in accordance with Article 9 of the Regulations on Standards for Installation and Management of Airfield Lighting. Related Projects Maintenance and management of aviation lighting facilities at national, company-managed, local-managed, joint-use, or other airports, or at airfields operated by the Self-Defense Forces. (2) Qualifications of Assigned Engineer The company must be able to assign a chief engineer or supervising engineer who meets the following criteria exclusively to this project. However, if it does not fall under Article 26, Paragraph 3 of the Construction Industry Act, the exclusivity requirement does not apply. 1) The chief engineer must be a Class 1 Electrical Construction Management Engineer, Class 2 Electrical Construction Management Engineer, or possess equivalent or higher qualifications. The supervising engineer must be a Class 1 Electrical Construction Management Engineer or possess equivalent or higher qualifications. 2) The supervising engineer must possess a supervising engineer's license and a certificate of completion of supervising engineer training. 3) Must have a direct and continuous employment relationship with the bidder and be able to provide proof thereof. 4) The period during which the chief engineer or supervising engineer is not required to be exclusively assigned is as follows: ① From the contract conclusion date until the commencement of on-site construction. (Period until the establishment of the site office, delivery of materials, or commencement of temporary work.) The date of commencement of on-site construction will be determined in consultation with the supervisor after the contract is concluded. ② The period after the completion of construction and inspection (excluding cases where inspection is delayed due to the client's convenience) when only administrative procedures, cleanup, etc., remain. The date of completion of inspection is the date when the client notifies the contractor of the confirmation of completion (e.g., the date on the "Completion Inspection Confirmation Notice"). 5) The assignment of a special supervising engineer is not permitted for this project. (3) The technical findings regarding the construction plan must be appropriate. If there is no description or the content is significantly inappropriate, competitive bidding qualifications will not be granted. (4) For electrical works ordered by the Osaka Regional Civil Aviation Bureau and its subordinate offices (offices of regional civil aviation bureaus as defined in Article 39, Paragraph 1 of the Ministry of Land, Infrastructure, Transport and Tourism Establishment Act, etc.) that were completed between April 1, Reiwa 6 and the announcement date, if construction performance evaluation has been notified, the average of the construction performance evaluation scores for these projects must be 65 points or higher.