Road and Bridge Maintenance (Repair) Work (Pavement Repair)
About This Opportunity
This is a works contract in the transport and logistics and architecture and engineering sectors, with a focus on Architectural Design and Rail Transport. Located in Japan, Asia, this opportunity is open to firms and consortiums.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the transport and logistics sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from JapaneseRoad and Bridge Maintenance (Repair) Work (Pavement Repair)
- 1 - PUBLIC NOTICE OF BID We hereby announce that a conditional open competitive bid will be held, in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act Enforcement Order (Showa 22, Cabinet Order No. 16; hereinafter referred to as the "Enforcement Order"), and Article 246, Paragraph 1 of the Fukushima Prefecture Financial Regulations (Showa 39, Fukushima Prefecture Ordinance No. 17). June 22, Reiwa 8 Director of Fukushima Prefecture Soso Regional Development Bureau Kazushi Takahashi 1. Items for Bid Classification ■ New □ Re-announced □ Re-announced (Design, conditions, etc. revised) Previous Announcement None Construction Number 26-41370-0108 Construction Name Road and Bridge Maintenance (Repair) Work (Pavement Repair) Construction Location Within Kitahara, Haramachi Ward, Minamisoma City (Kohama Aza Machi Line) Construction Outline Pavement Repair Work L=550.0m W=8.25m A=4537.5m2 Completion Deadline Construction Period 176 days (including flexible period) Estimated Price To be announced after contract conclusion. Item Applicable/Not Applicable Description if Applicable Start of Construction Applicable/Not Applicable Applicable: Construction started on or after April 1, Reiwa 8. Not Applicable: Construction started by March 31, Reiwa 8. Minimum Reserve Price Not Applicable - Construction for which a minimum reserve price will be set based on Article 167-10, Paragraph 2 of the Enforcement Order. To be announced after contract conclusion. Comprehensive Evaluation Method Special Simple Type - This is a construction project to which the comprehensive evaluation method is applied, where the successful bidder is determined by comprehensively evaluating factors other than price along with price. - The method for determining the successful bidder candidate and the comprehensive evaluation method shall be as specified in the bid explanation document. A benchmark price will be set for this bid. Low Bid Price Investigation Applicable - This construction project is subject to the low bid price investigation system based on Article 167-10, Paragraph 2 of the Enforcement Order. The investigation benchmark price will be announced after the contract is concluded. - If a bid below the investigation benchmark price is submitted, the bidder with the highest evaluation score may not necessarily be the successful bidder. Please cooperate with the low bid price investigation. Construction System Pre-submission Method Not Applicable - This construction project is subject to the Fukushima Prefecture Construction System Pre-submission Method. - The disqualification criteria, investigation details, and forms for the Construction System Pre-submission Method shall be as specified in the bid explanation document. Electronic Bidding Applicable - Pre-registration is required from the following address to participate in electronic bidding. - Electronic Bidding System (Address) http://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html Electronic Browsing Applicable Electronic Browsing System (Address) http://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html Relaxation of Site Manager's On-site Duty Applicable If approved by the contracting authority based on the successful bidder's application, the site manager for the preceding construction may be assigned as the site manager for this construction. In this case, the contracting authority may impose necessary conditions. Exception for Full-time Requirement No. 2 - Applicable for Placement of Specially Supervised Technician Applicable - This construction project allows for the placement of a supervised technician who falls under the provisions of Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Specially Supervised Technician No. 2"). - The requirements for placing a Specially Supervised Technician No. 2 shall be as specified in the bid explanation document. - 2 - Recycling, etc. Applicable - This construction project is subject to the obligation to implement separate demolition and recycling of construction materials and specific construction material waste, in accordance with the Act on Promotion of Recycling of Construction Materials, etc. (Act No. 104 of 2000). Mixed Bidding (Excluding Reconstruction JV) Not Applicable - Allows participation by single companies or specific construction joint ventures. Mixed Bidding (Reconstruction JV) Not Applicable - Allows participation by single companies or specific construction joint ventures as defined in Article 3 of the Supplementary Provisions of the Fukushima Prefecture Construction Joint Venture Handling Guidelines (Notice dated December 28, Reiwa 23, No. 23 Zai No. 1971 (partially revised on January 6, Reiwa 2)). Capital or Personnel Relationship Applicable - Participation by companies with capital or personnel relationships in the same bid is not permitted. 2. Qualifications Required for Bidders Bidders must meet all of the following conditions and the conditions specified in the bid explanation document. Bid Type Pavement Work - Must be registered in the bid type shown in the left column of the Fukushima Prefecture Construction Contractor Qualification List valid for the fiscal year in which the bid opening date falls, with the classification grade shown in the left column. Classification Grade A Licensed Trade Pavement Contractor - Must hold a license for the trade shown in the left column of the Construction Industry Act (Showa 24, Act No. 100). Regional Requirement Within Prefecture - "Within Prefecture" means a company with its head office in Fukushima Prefecture. - "Adjacent 3 Districts" means a company with its head office or branch/business office* in the Soso Construction Office jurisdiction, Kenpoku Construction Office jurisdiction, Kenchu Construction Office jurisdiction (limited to within Tamura City and Tamura District), or Iwaki Construction Office jurisdiction. - "Within Jurisdiction" means a company with its head office or branch/business office* in the Soso Construction Office jurisdiction. * Branch/business office refers to a branch/business office of a company with its head office within the prefecture (prefectural contractor) that is registered as a delegated office in the Fukushima Prefecture Construction Contractor Qualification List valid for the fiscal year in which the bid opening date falls. Technical Personnel Construction Experience - Must be able to assign a supervised technician or chief technician with the construction experience (experience as assigned personnel) shown in the left column to the construction site on a full-time basis. (However, full-time assignment is not required if the contract amount is less than 45 million yen (less than 90 million yen for general building construction) or if it falls under the proviso of Article 26, Paragraph 3 of the Construction Industry Act.) - "Construction Experience" refers to experience as a lead contractor's assigned personnel, including experience with companies other than the current employer. (For joint ventures, this applies only if the participation ratio is 20% or more. In the case of a division of work, this applies only if the divided work corresponds to the construction shown in the left column. This is limited to public works (excluding bid types such as building construction, electrical equipment work, or HVAC and sanitary equipment work). Public works as used herein refer to works commissioned by public work commissioning bodies, land development corporations, local road corporations, local housing corporations, sewage corporations, land readjustment associations, urban redevelopment associations, land improvement districts, the Public University Corporation Fukushima Medical University, or the Public University Corporation Aizu University, as defined by the Act on Promotion of Proper Bidding and Contracts for Public Works (as of the time of the record). The same applies hereinafter.) The experience as assigned personnel refers to the experience as a chief technician prescribed in Article 26, Paragraph 1 of the Construction Industry Act or a supervised technician prescribed in Paragraph 2 of the same Article. - For supervised technicians, they must possess a supervised technician qualification certificate and a supervised technician training completion certificate. Company Construction Experience - Must have the construction experience shown in the left column within the period shown in the left column as a lead contractor. Not Required Company Construction Scale Experience - Must have construction experience as a lead contractor with a contract amount of the amount shown in the left column or more per project within the period shown in the left column. (For joint ventures, this is the amount equivalent to the participation ratio.) However, if the same construction project is awarded over multiple fiscal years, it will be considered as one project. Not Required JR Proximity Construction - If applicable, must be able to assign a person with a permanent employment relationship with East Japan Railway Company who holds the qualification of "Construction Manager" to the construction site. - "Construction Manager" refers to a person holding a "Construction Manager (Conventional Line) Qualification Certificate" certified by East Japan Railway Company. Not Applicable 3. Bid Participation Procedures, etc. In this bid, qualification for participation will be examined after the bid opening, so no prior application for participation is required. (For electronic bidding projects, bids will be opened through the electronic bidding system, and participants must register their participation through the system.) For inquiries regarding bid documents, submission of bids, announcement of successful bidder candidates, and bid results, please refer to the bid explanation document. The period and location for viewing bid documents and bid execution are as follows. Item Period or Date Location, etc. Viewing of Bid Documents, etc. Monday, June 22, Reiwa 8 - Tuesday, July 21, Reiwa 8 Electronic Browsing System Inquiries regarding Bid Documents, etc. Monday, June 22, Reiwa 8 - Tuesday, June 30, Reiwa 8 1-30 Nishikicho, Haramachi Ward, Minamisoma City Soso Construction Office General Affairs Division, General Affairs Section Phone: 0244-26-1208 Email: sousou.ken.nyusatsu@pref.fukushima.lg.jp * The subject and file name of emails for inquiries regarding bid documents should be "[Inquiry Regarding Bid Documents] Last 4 Digits of Construction Number (Company Name)". * In principle, inquiries should be sent by email. If you wish to send by facsimile, please contact the phone number above. Scheduled Response to Inquiries Tuesday, July 7, Reiwa 8 Soso Regional Development Bureau, Fukushima Prefecture, Treasury Office Check the website for the presence or absence of answers to inquiries before submitting bids. Bid Participation Registration Friday, July 10, Reiwa 8 - Monday, July 13, Reiwa 8 - Limited to electronic bidding. - By inputting into the electronic bidding system. Bid Submission Friday, July 17, Reiwa 8 9:00 AM - 5:00 PM Tuesday, July 21, Reiwa 8 - By inputting into the electronic bidding system. The bid submission period is 2 days. However, the closing time on the final day is 3:00 PM. * If bids are submitted after 5:00 PM on the first day and before 9:00 AM on the final day, and they are not received due to obstacles, etc., they will be considered as withdrawn, so please submit within the system usage hours. Bid Opening Wednesday, July 22, Reiwa 8 1:00 PM The bid opening results will be publicly displayed all day at the following location after the bid opening. 1st Floor, South Building, Fukushima Prefecture Minamisoma Joint Government Building, 1-30 Nishikicho, Haramachi Ward, Minamisoma City, Treasury Office Hall Scheduled Date for Successful Bidder Determination Wednesday, July 29, Reiwa 8 * Electronic browsing system usage hours are from 8:00 AM to 10:00 PM (excluding prefectural holidays as defined in Article 1, Paragraph 1 of the Ordinance on Determining Prefectural Holidays (Reiwa 1, Fukushima Prefecture Ordinance No. 7). The same applies hereinafter.) * Electronic bidding system usage hours are from 9:00 AM to 5:00 PM. 4. Matters Concerning Examination of Bid Participation Qualifications If a successful bidder candidate is determined, the candidate will be notified by phone or other reliable method promptly after the bid opening. The examination of the successful bidder candidate's qualifications, the determination of the successful bidder, and the notification of disqualification from bidding shall be as specified in the bid explanation document. 5. Bid Bond and Contract Deposit The bid bond and contract deposit shall be as specified in the bid explanation document. 6. Invalid Bids Bids submitted by persons who do not meet the qualifications required for participation in the bid, or bids that violate the conditions of bidding specified in the Fukushima Prefecture Construction Bidding Rules, etc., shall be deemed invalid. 7. Trial Construction on Estimation Methods for Recovery and Reconstruction Projects of the Great East Japan Earthquake (1) This construction project is a "Trial Construction on Estimation Methods for Securing Workers" where, after the contract is concluded, if there are changes in the measures required to secure workers and it becomes difficult to carry out the work properly with the amount based on the Civil Engineering Standard Estimation Standards (Fukushima Prefecture Civil Engineering Department), the design will be changed at the final settlement and revision stage based on the actual expenditure of "actual change target indirect costs." "Actual change target indirect costs" include: Maintenance and Repair Costs: Worker transportation costs, accommodation costs, rental costs. Labor Management Costs: Costs related to recruitment and dissolution, costs other than wages for meals, commuting, etc. (2) This construction project is estimated using the "Trial on Estimation Methods, etc. for Recovery and Reconstruction Projects of the Great East Japan Earthquake" (refer to the Technical Management Division HP: http://www.pref.fukushima.lg.jp/sec/41025b/torikumi.html). 8. Other - This construction project is subject to the "Trial Guidelines for Securing Two Days Off Per Week in Civil Engineering Department Commissioned Works" (Technical Management Division HP: http://www.pref.fukushima.lg.jp/sec/41025b/shuukyuufutuka.html). The contractor must comply with the provisions of the trial guidelines. The commissioning method for this project is contractor-designated. - This construction project is subject to the "Implementation Guidelines for Utilizing the Construction Career Up System in Works Commissioned by the Fukushima Prefecture Civil Engineering Department" (Technical Management Division HP: http://www.pref.fukushima.lg.jp/sec/41025b/ccus.html). The contractor must comply with the provisions of the implementation guidelines. - This construction project is subject to "ICT Utilization Construction" which utilizes 3D data for commencement surveys, construction, progress management, construction management records, and related documents. For details, please refer to the special specifications. - This is a flexible construction project, and the contractor can set the start and end dates of the construction arbitrarily within the construction period indicated by the contracting authority. - For other details, please refer to the bid explanation document. For inquiries, please contact the following. Contact Information Soso Regional Development Bureau, Fukushima Prefecture, Treasury Office Phone: 0244-26-1302 Email: so...
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on June 22, 2026. Last refreshed 8 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 福島県
福島県 has issued 156 procurement notices on BidsFactory, including 30 currently open and 56 awarded contracts. Activity concentrates in Construction & Civil Works, Transport & Logistics, and Architecture & Engineering Services. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: July 29, 2026.
Frequently asked questions about this tender
Who is the contracting authority?
This notice was issued by 福島県 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Transport & Logistics sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.