[County Base No. 0801] Reiwa 8 Prefectural Key Agricultural Road Improvement Project, Takasu North Area, Section 3, No. 7 Construction Public Notice of Competitive Bidding
Form No. 2 [Post-qualification Type] Yukihiko Yamauchi, Director of Gujo Regional Development Office, Gifu Prefecture
1. Construction for Public Competitive Bidding
(1) Construction Number: County Base No. 0801
Construction Name: Construction Name Construction Name
(2) Construction Location: Within Nishidō, Takasu-cho, Gujo City
Line spacing adjustment
(3) Construction Outline:
Road Work L=105m, W=5.5(7.0)m
Excavation Work V=587m3
Embankment Work V=648m3
Retaining Wall Work A=121m2
Drainage Work L=122m
Guardrail Work L=107m
(4) Construction Period: From the date of contract to March 19, Reiwa 9
(5) Estimated Price: 76,018,800 yen (including consumption tax and local consumption tax)
(6) Low Bid Price Investigation System: Yes
(7) Minimum Reserve Price System: No
(8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19)
2. Bid Participation Qualifications
This construction requires the following qualifications for bid participation.
AI
Must be a Professional Engineer (Construction Department, Agricultural Department "Agricultural Civil Engineering", "Agricultural and Rural Engineering", Forestry Department "Forest Civil Engineering") or possess equivalent or higher qualifications.
Registered business types and total scores in the Gifu Prefecture Construction Work Bidder Qualification List
Conditions for Construction Experience
- Civil Engineering Works as defined by the Construction Industry Act, with a completed contract value of 39 million yen or more.
However, this excludes cases where the construction performance evaluation score is less than 65 points for work ordered by the national government or Gifu Prefecture.
BID NOTICE (SPECIFIC MATTERS)
Public Notice of Competitive Bidding for Prefectural Key Agricultural Road Improvement Project, Takasu North Area, Section 3, No. 7 Construction
This construction is a trial construction using the comprehensive evaluation and bidding system (rural development type) aimed at supporting initiatives that contribute to rural development, such as efforts in the construction industry for epidemic prevention work related to livestock infectious diseases.
This construction is a model construction for improving the construction site environment, requested by the contractor.
For details, please refer to the "Implementation Guidelines for Model Construction for Improving the Construction Site Environment Ordered by Gifu Prefecture".
This construction is subject to the obligation of separate demolition and recycling of specific construction materials, etc., based on the "Law on the Recycling of Construction Materials" (Law No. 104 of 2000).
This construction is a comprehensive evaluation and bidding system (simple type ①) construction that accepts proposals for technical documents and determines the successful bidder by comprehensively evaluating factors other than price along with price.
July 28, Reiwa 8
Regarding the Prefectural Key Agricultural Road Improvement Project, Takasu North Area, Section 3, No. 7 Construction, a post-qualification type competitive bid will be held, and this is hereby announced in accordance with the provisions of Article 127 of the Gifu Prefecture Accounting Regulations (Showa 32, Gifu Prefecture Ordinance No. 19; hereinafter referred to as "Regulations").
The bid notice shall consist of "Form No. 1 Bid Notice Common Matters [Post-qualification Type]" and this document.
"Form No. 1 Bid Notice Common Matters [Post-qualification Type]" is posted on the Gifu Prefecture website.
This bid will be conducted using the electronic bidding system. However, if you have changed your company name, address, or representative and have not updated your IC card, please participate using paper bids.
If you continue to use your current IC card, your bid may be invalidated or your bidding eligibility may be suspended.
Please contact us if you have any questions.
Prefectural Key Agricultural Road Improvement Project, Takasu North Area, Section 3, No. 7 Construction (Electronic Bidding Target Project)
This construction is subject to a trial of supplementary on-site management costs for heatstroke countermeasures, and supplementary on-site management costs will be adjusted during the design change based on the daily maximum temperature.
This construction will be carried out using the electronic bidding system.
However, if it is difficult to use the electronic bidding system, written submissions may be accepted only with the prior approval of the head of the contracting organization.
Conditions for Assigned Engineers
The chief or supervising engineer assigned to this construction must meet the following criteria (A and C, or B and C) and be available at the start of the contract period.
However, the engineer must be assigned exclusively from the start of on-site construction (September 25, Reiwa 8).
Note: Exclusivity is not required when applying Special Exemption No. 1 and Special Exemption No. 2, or when applying Article 26-5 of the Construction Industry Act.
Must be a Class 1 or Class 2 Civil Engineering Construction Management Engineer, or possess equivalent or higher qualifications.
This construction is a "Model Construction Utilizing ICT" at the contractor's request.
For details, please refer to the "Implementation Guidelines for Model Construction Utilizing ICT Ordered by the Gifu Prefecture Agricultural Policy Department".
Required construction industry permit
Must have construction experience as the prime contractor for the following types of work, completed by the application deadline date after FY2011.
(Experience as a member of a joint venture
This construction is a trial construction for remote on-site presence in construction sites, requested by the contractor.
For details, please refer to the "Trial Guidelines for Remote On-Site Presence in Construction Sites".
This construction is a trial construction using the comprehensive evaluation and bidding system (human resource development type) aimed at supporting the securing and training of human resources in the construction industry, and improving the working environment.
This construction is a "Complete Weekend Two-Day System (Saturday and Sunday) Construction (Site Closure)" with a principle of complete two-day weekends.
For details, please refer to the "Implementation Guidelines for Complete Weekend Two-Day System (Saturday and Sunday) Construction Ordered by Gifu Prefecture".
This construction is a "Model Construction Utilizing ICT" at the contractor's request.
For details, please refer to the "Implementation Guidelines for Model Construction Utilizing ICT Ordered by the Gifu Prefecture Agricultural Policy Department".
This construction is a trial construction for remote on-site presence in construction sites, requested by the contractor.
For details, please refer to the "Trial Guidelines for Remote On-Site Presence in Construction Sites".
This construction is a model construction for improving the construction site environment, requested by the contractor.
For details, please refer to the "Implementation Guidelines for Model Construction for Improving the Construction Site Environment Ordered by Gifu Prefecture".
This construction is a model construction utilizing the construction career advancement system, requested by the contractor.
For details, please refer to the "Implementation Guidelines for Model Construction Utilizing the Construction Career Advancement System for Gifu Prefecture Orders".
Civil Engineering Works - Total Score: 930 points or more
Specific/General (Civil Engineering Works)
3. Contact Department
Bidding Contact Department: 0575-67-1111
Address: 501-4292 Gifu Prefecture, Gujo City, Hachiman-cho, Hatsune 1727-2
Construction Contact Department: 0575-67-1111
4th Floor, Gujo General Government Building
Gujo Regional Development Office, Gifu Prefecture
Conditions for Assigned Engineers
Must have experience as a chief engineer, supervising engineer, assistant supervising engineer, or site agent for Civil Engineering Works as defined by the Construction Industry Act, with a completed contract value of 23 million yen or more, as the prime contractor, by the application deadline date after FY2011.
However, this excludes experience as an engineer additionally required separately from the chief engineer, supervising engineer, or assistant supervising engineer stipulated by the Construction Industry Act when a contract is concluded at a price below the low bid price investigation standard price.
(Experience as a chief engineer or supervising engineer includes experience where Special Exemption No. 1, Special Exemption No. 2 (including special supervising engineer stipulated by the Construction Industry Act enforced on October 1, Reiwa 2), and Article 26-5 of the Construction Industry Act were applied. Also, experience as a chief engineer, supervising engineer, assistant supervising engineer, or site agent as a member of a joint venture is limited to those with an investment ratio of 40% or more.)
Construction with a contract value of less than 10 million yen.
Construction with a contract value of 10 million yen or more but less than 45 million yen, provided that the average construction performance evaluation score for the relevant work type (*1) of Gifu Prefecture-ordered construction in Reiwa 7 and 6 is 75 points or more (if there is no construction order experience for the relevant work type (*1) of Gifu Prefecture-ordered construction in Reiwa 7 and 6, the average construction performance evaluation score for the relevant work type (*1) of Gifu Prefecture-ordered construction in Reiwa 5 and 4 is 75 points or more).
Construction with a contract value of 10 million yen or more but less than 45 million yen, using the comprehensive evaluation and bidding system.
*1: Work type classifications defined by the Construction Industry Act, such as "Civil Engineering Works," "Building Works," and "Paving."
Forest Preservation Division, Erosion Control First Section
General Affairs Division, Management and Coordination Section
Must have its head office registered in the Gifu Prefecture Construction Work Bidder Qualification List within the jurisdiction of the Gujo Regional Development Office as specified in "Appendix 2" of "Form No. 1 Bid Notice Common Matters [Post-qualification Type]".
Contractor for Design Services, etc.
Sanei Consultant Co., Ltd.
Conditions for Assigned Engineers
This construction is a project for which Special Exemption No. 1, Special Exemption No. 2, and Article 26-5 of the Construction Industry Act are applicable.
4. Bid Schedule
Design Document Viewing: From 9:00 AM on Tuesday to 4:00 PM on Wednesday
Questionnaire Submission: From 9:00 AM on Tuesday to 4:00 PM on Monday
* For paper bids, submit to the bidding contact department.
Answer Document Viewing: From 9:00 AM on Tuesday to 4:00 PM on Wednesday
Also available for viewing at the bidding contact department.
From 9:00 AM on Tuesday to 4:00 PM on Tuesday
Until Thursday
From 9:00 AM on Tuesday to 4:00 PM on Wednesday
Bid Opening: From 10:00 AM on Thursday
Conference Room 5-South 1, Gujo General Government Building
From 11:00 AM on Thursday to the bidding contact department
Until 4:00 PM on Monday, submit to the bidding contact department.
Written (free format)
Submit in writing.
Bid Results Publication: Via Bidding Information Service or Prefectural Website
Also available for viewing at the bidding contact department.
*For paper bids, submission is permitted, but mail or electronic transmission will not be accepted.
(Period and dates are the same)
Note) Submission documents are described in "Form No. 1 Bid Notice Common Matters [Post-qualification Type]".
5. Matters Concerning Comprehensive Evaluation and Bidding System
(1) Mechanism of Comprehensive Evaluation and Bidding System
The successful bidder for this construction will be determined by the following method.
① When the bid participation qualifications are met, a standard score of 100 points will be awarded.
② A maximum of 26.5 additional points will be awarded based on the experience shown in the technical documents.
(2) Evaluation Items
(A) Matters concerning construction capabilities
(B) Matters concerning corporate capabilities
(C) Matters concerning the capabilities of the assigned engineer
(D) Matters concerning regional requirements
6. Other
(1) After the contract is awarded, confirmation will be made regarding the desire to conclude an electronic contract using the electronic contract service.
If you wish to conclude an electronic contract, please promptly submit the "Electronic Contract Intention Confirmation Form and Electronic Contract Email Address Confirmation Form" to the prefecture.
Gujo Regional Development Office, Gifu Prefecture
Conditions for Assigned Engineers
This construction is a project for which Special Exemption No. 1, Special Exemption No.