Reconstruction Base Integrated Maintenance Pond 0801 Construction
- 1 - Bid Announcement
We hereby announce that a conditional open competitive bid will be held, in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act Enforcement Order (Showa 22, Cabinet Order No. 16; hereinafter referred to as the "Enforcement Order") and Article 246, Paragraph 1 of the Fukushima Prefecture Financial Regulations (Showa 39, Fukushima Prefecture Ordinance No. 17).
August 31, Reiwa 8
Director General, Fukushima Prefecture Soso Regional Development Bureau
Kazushi Takahashi
1. Matters for Bidding
Classification ■ New □ Re-announced □ Re-announced (Design, conditions, etc. revised)
Previous Announcement: None
Construction Number: 26-36260-0138
Construction Name: Reconstruction Base Integrated Maintenance Pond 0801 Construction
Construction Location: Within Kakura, Namie Town, Futaba District (Mekurasawa 2nd District)
Construction Outline: Pond renovation work, N=1 location
Completion Deadline: By March 31, Reiwa 10
Estimated Price: To be announced after contract conclusion.
Item | Applicable | Content if Applicable | Description
Start of Construction | Applicable | If applicable, construction started on or after April 1, Reiwa 8.
If not applicable, construction started by March 31, Reiwa 8.
Minimum Reserve Price | Not Applicable | Construction for which a minimum reserve price is set based on Article 167-10, Paragraph 2 of the Enforcement Order. To be announced after contract conclusion.
Comprehensive Evaluation Method | Simple Type | This is a construction project to which the comprehensive evaluation method is applied, where the successful bidder is determined by comprehensively evaluating factors other than price along with price.
The method for determining the successful bidder candidate and the comprehensive evaluation method are as specified in the bid explanation document. A benchmark price will be set for this bid.
Low Bid Price Investigation | Applicable | Construction project to which the low bid price investigation system based on Article 167-10, Paragraph 2 of the Enforcement Order is applied. The investigation standard price will be announced after contract conclusion.
If a bid below the investigation standard price is submitted, the bidder with the highest evaluation score may not necessarily be the successful bidder. Please cooperate with the low bid price investigation.
Construction System Pre-submission Method | Not Applicable | Application of Fukushima Prefecture Construction System Pre-submission Method.
The disqualification criteria, investigation details, and forms for the Construction System Pre-submission Method are as specified in the bid explanation document.
Electronic Bidding | Applicable | To participate in electronic bidding, pre-registration is required from the following address.
Electronic Bidding System (Address): http://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-98.html
Electronic Browsing | Applicable | Electronic Browsing System (Address): http://www.pref.fukushima.lg.jp/sec/01115c/nyusatsu-96.html
Relaxation of On-site Manager's On-site Duty | Applicable | If approved by the contracting authority based on the successful bidder's application, the on-site manager of the preceding construction may be assigned as the on-site manager for this construction. In this case, the contracting authority may impose necessary conditions.
Placement of Construction Manager (Special Exception No. 2) | Applicable | This is a construction project where a construction manager subject to the provisions of Article 26, Paragraph 3, Item 2 of the Construction Industry Act (hereinafter referred to as "Construction Manager (Special Exception No. 2)") can be assigned. The requirements for assigning a Construction Manager (Special Exception No. 2) are as specified in the bid explanation document.
- 2 -
Recycling, etc. | Applicable | This is a construction project where the recycling of materials, etc., in construction work is mandated by the Act on the Recycling of Materials, etc., in Construction Work (Act No. 104 of 2000), including separate demolition and recycling of specified construction waste.
Mixed Bidding (Excluding Reconstruction JV) | Not Applicable | This is a mixed bid that allows participation by a single company or a specific construction joint venture.
Reconstruction JV | Applicable | This is a mixed bid that allows participation by a single company or a specific construction joint venture as defined in Article 3 of the Supplementary Provisions of the Fukushima Prefecture Construction Joint Venture Handling Guidelines (Notice dated December 28, Reiwa 23, No. 23 Finance 1971 (partially revised on January 6, Reiwa 2)).
Capital or Human Relationship | Applicable | Companies with capital or human relationships are not allowed to participate in the same bid.
2. Qualifications Required for Bidders
Bidders must meet all of the following conditions and the conditions specified in the bid explanation document.
(1) For Single Companies
Classification of Work: General Civil Engineering Work
Must be registered in the classification of work and grading level shown in the left column of the Fukushima Prefecture Construction Contract Eligible Contractor List valid for the fiscal year in which the bid opening date falls.
Grading Level: A
Permitted Business Type: Civil Engineering Construction
Must have a permit for the business types shown in the left column of the Construction Industry Act (Showa 24, Act No. 100).
Regional Requirements: Within the Prefecture
"Within the Prefecture" means having its head office in Fukushima Prefecture.
"Adjacent 3 Districts" means having its head office or branch/business office* in the Soso Construction Office district, Kenpoku Construction Office district, Kenchu Construction Office district (limited to Tamura City or Tamura District), or Iwaki Construction Office district.
"Within the District" means having its head office or branch/business office* in the Soso Construction Office district.
* Branch/Business Office refers to a branch/business office of a company with its head office within the prefecture (prefectural contractor) that is designated as an authorized representative in the Fukushima Prefecture Construction Contract Eligible Contractor List valid for the fiscal year in which the bid opening date falls.
Construction Experience of Technicians
Must be able to assign a construction manager or chief engineer with the construction experience (experience as an assigned technician) shown in the left column to the construction site on a full-time basis.
(However, if the contract amount is less than 45 million yen (less than 90 million yen for general building construction) or if it falls under the proviso of Article 26, Paragraph 3 of the Construction Industry Act, full-time assignment is not required.)
"Construction Experience" refers to experience as an assigned technician on a prime contract (in the case of a JV, limited to members with an investment ratio of 20% or more; in the case of a divided construction method, limited to cases where the divided construction falls under the construction shown in the left column. Also, limited to public works (excluding cases where the classification of work is building construction, electrical equipment construction, or air conditioning, heating, and sanitary equipment construction). Public works as used herein refers to works ordered by the clients defined in the Act on Promotion of Proper Bidding and Contract Procedures for Public Works (as of the time of the record), land development corporations, local road corporations, local housing corporations, sewage corporations, land readjustment associations, urban redevelopment associations, land improvement districts, the public university corporation Fukushima Medical University, or the public university corporation Aizu University. The same applies hereinafter).
Experience as an assigned technician refers to experience as a chief engineer as defined in Article 26, Paragraph 1 of the Construction Industry Act or as a construction manager as defined in Article 26, Paragraph 2 of the same Act.
For construction managers, they must possess a Construction Manager's Qualification Certificate and a Construction Manager Training Completion Certificate.
Not required
Construction Performance of Company
Must have construction performance as a prime contractor during the period shown in the left column, as specified in the left column.
Not required
Scale of Construction Performance of Company
Must have construction performance as a prime contractor during the period shown in the left column, with a contract amount of the amount or more shown in the left column per project (in the case of a JV, the amount equivalent to the investment ratio).
However, if the same construction was awarded over multiple fiscal years, it is considered one project.
Not required
Construction Adjacent to JR Lines
If applicable, must be able to assign a full-time employee with the qualification of "Construction Manager" from East Japan Railway Company to the construction site.
"Construction Manager" refers to a person holding a "Construction Manager (Conventional Line) Qualification Certificate" certified by East Japan Railway Company.
Not Applicable
- 4 -
(2) For Specific Construction Joint Ventures
Number of Members: 2 or 3
Combination of Members: All members must meet the common qualification requirements for members.
A combination of one party meeting the qualification requirements for the representative member and one or two parties meeting the qualification requirements for other members.
Formation Method: Voluntary formation.
Investment Ratio of Each Member:
For 2 parties: 30% or more for each party.
For 3 parties: 20% or more for each party.
Common Qualification Requirements for Members
Construction Experience of Technicians
Must be able to assign a construction manager or chief engineer with the construction experience (experience as an assigned technician) shown in the left column to the construction site on a full-time basis.
(However, if the contract amount is less than 45 million yen (less than 90 million yen for general building construction) or if it falls under the proviso of Article 26, Paragraph 3 of the Construction Industry Act, full-time assignment is not required.)
"Construction Experience" refers to experience as an assigned technician on a prime contract (in the case of a JV, limited to members with an investment ratio of 20% or more; in the case of a divided construction method, limited to cases where the divided construction falls under the construction shown in the left column. Also, limited to public works (excluding cases where the classification of work is building construction, electrical equipment construction, or air conditioning, heating, and sanitary equipment construction). Public works as used herein refers to works ordered by the clients defined in the Act on Promotion of Proper Bidding and Contract Procedures for Public Works (as of the time of the record), land development corporations, local road corporations, local housing corporations, sewage corporations, land readjustment associations, urban redevelopment associations, land improvement districts, the public university corporation Fukushima Medical University, or the public university corporation Aizu University. The same applies hereinafter).
Experience as an assigned technician refers to experience as a chief engineer as defined in Article 26, Paragraph 1 of the Construction Industry Act or as a construction manager as defined in Article 26, Paragraph 2 of the same Act.
For construction managers, they must possess a Construction Manager's Qualification Certificate and a Construction Manager Training Completion Certificate.
Not required
Qualification Requirements for Representative Member
Classification of Work: General Civil Engineering Work
Must be registered in the classification of work and grading level shown in the left column of the Fukushima Prefecture Construction Contract Eligible Contractor List valid for the fiscal year in which the bid opening date falls.
Grading Level: A
Permitted Business Type: Civil Engineering Construction
Must have a permit for the business types shown in the left column of the Construction Industry Act (Showa 24, Act No. 100).
Regional Requirements: Within the Prefecture
"Within the Prefecture" means having its head office in Fukushima Prefecture.
Construction Performance of Company
Must have construction performance as a prime contractor during the period shown in the left column, as specified in the left column.
Not required
Scale of Construction Performance of Company
Must have construction performance as a prime contractor during the period shown in the left column, with a contract amount of the amount or more shown in the left column per project (in the case of a JV, the amount equivalent to the investment ratio).
However, if the same construction was awarded over multiple fiscal years, it is considered one project.
Not required
Construction Adjacent to JR Lines
If applicable, must be able to assign a full-time employee with the qualification of "Construction Manager" from East Japan Railway Company to the construction site.
"Construction Manager" refers to a person holding a "Construction Manager (Conventional Line) Qualification Certificate" certified by East Japan Railway Company.
Not Applicable
- 5 -
Investment Ratio: Must be the largest among the members. If investment ratios are the same, the one with greater construction capability.
Qualification Requirements for Other Members
Classification of Work: General Civil Engineering Work
Must be registered in the classification of work and grading level shown in the left column of the Fukushima Prefecture Construction Contract Eligible Contractor List valid for the fiscal year in which the bid opening date falls.
Grading Level: A or B
Permitted Business Type: Civil Engineering Construction
Must have a permit for the business types shown in the left column of the Construction Industry Act (Showa 24, Act No. 100).
Regional Requirements: Nationwide
Must be registered in the Fukushima Prefecture Construction Contract Eligible Contractor List valid for the fiscal year in which the bid opening date falls.
Construction Performance of Company
Must have construction performance as a prime contractor during the period shown in the left column, as specified in the left column.
Not required
Scale of Construction Performance of Company
Must have construction performance as a prime contractor during the period shown in the left column, with a contract amount of the amount or more shown in the left column per project (in the case of a JV, the amount equivalent to the investment ratio).
However, if the same construction was awarded over multiple fiscal years, it is considered one project.
Not required
Construction Adjacent to JR Lines
If applicable, must be able to assign a full-time employee with the qualification of "Construction Manager" from East Japan Railway Company to the construction site.
"Construction Manager" refers to a person holding a "Construction Manager (Conventional Line) Qualification Certificate" certified by East Japan Railway Company.
Not Applicable
3. Bid Participation Procedures, etc.
For this bid, pre-bid participation application procedures are not required, as qualification screening will be conducted after the bid opening.
(For construction projects subject to electronic bidding, bidding will be conducted through the electronic bidding system, so bidders must register their participation in the system.)
Methods for inquiries regarding design documents, submission of bids, announcement of successful bidder candidates, and announcement of bid results are as specified in the bid explanation document.
The period and location for browsing design documents, bid execution, etc., are as follows:
Item | Period or Deadline | Place, etc.
Browsing of Design Documents, etc. | August 31, Reiwa 8 (Mon) - October 13, Reiwa 8 (Tue) | Electronic Browsing System
Inquiries regarding Design Documents, etc. | August 31, Reiwa 8 (Mon) - September 9, Reiwa 8 (Wed) | 1-30 Nishiki-cho, Haramachi-ku, Minamisoma City
Fukushima Prefecture Soso Regional Agricultural Affairs Office, General Affairs Division
Phone: 0244-26-1175
Email: soumu.af06@pref.fukushima.lg.jp
* The subject line and file name for inquiries regarding design documents via email should be "[Inquiry Regarding Design Documents] Last 4 digits of Construction Number (Company Name)".
* In principle, inquiries should be sent via email. If facsimile transmission is preferred, please contact the phone number above.
Scheduled Response to Inquiries | September 15, Reiwa 8 (Tue) | Fukushima Prefecture Soso Regional Development Bureau, Treasury Office Website
* Before submitting bids, please check the website for inquiry responses.
- 6 -
Item | Period or Deadline | Place, etc.
Bid Participation Registration | September 25, Reiwa 8 (Fri) - September 28, Reiwa 8 (Mon) | Limited to electronic bidding.
Input via the electronic bidding system.
Submission of Bids, etc. | For construction projects subject to electronic bidding:
September 9, Reiwa 8 (Fri) 9:00 AM - 5:00 PM
October 13, Reiwa 8 (Tue) 9:00 AM - 3:00 PM | For construction projects subject to electronic bidding:
Input via the electronic bidding system.
* The bid submission period is 2 days. However, the closing time on the final day is 3:00 PM.
* If bids are submitted after 5:00 PM on the first day and before 9:00 AM on the final day, and they are not received due to system issues, they will be considered as withdrawn. Please submit within the system usage hours.
Bid Opening | October 14, Reiwa 8 (Wed) 1:00 PM | As above.
After the bid opening, the bid opening results will be publicly available all day at the following location.
1st Floor, Minamisoma Joint Government Building, South Building, 1-30 Nishiki-cho, Haramachi-ku, Minamisoma City, Fukushima Prefecture, in front of the Treasury Office.
Scheduled Date for Determination of Successful Bidder | October 21, Reiwa 8 (Wed)
* Electronic browsing system usage hours are from 8:00 AM to 10:00 PM (excluding prefectural holidays as defined in Article 1, Paragraph 1 of the Fukushima Prefecture Ordinance on Prefectural Holidays (Reiwa 1, Fukushima Prefecture Ordinance No. 7). The same applies hereinafter).
* Electronic bidding system usage hours are from 9:00 AM to 5:00 PM.
4. Matters Concerning the Screening of Bid Participation Qualification Requirements
If a successful bidder candidate is determined, the candidate will be notified promptly after the bid opening by telephone or other reliable means.
Screening of the successful bidder candidate's qualification requirements, determination of the successful bidder, and notification of ineligibility for bidding will be conducted according to the bid explanation document.