Tenders/[Construction Work] Sai-Nishi-Ta No. 0802 Public Irrigation and Drainage Project: Umori Misato Area, Umori Misato Drainage Pump Station Phase 8 (Electrical Equipment Manufacturing and Installation) General Competitive Bidding Announcement
Open🇯🇵JapanWorks

[Construction Work] Sai-Nishi-Ta No. 0802 Public Irrigation and Drainage Project: Umori Misato Area, Umori Misato Drainage Pump Station Phase 8 (Electrical Equipment Manufacturing and Installation) General Competitive Bidding Announcement

Auto-translated from Japanese
Original title: 【建設工事】債西た第0802号 県営湛水防除事業 鵜森三郷地区 鵜森三郷排水機場第8期(電気設備製作据付)工事に関する一般競争入札公告
岐阜県
Published: Jun 22, 2026
Updated: Jul 29, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the construction and civil works, water and sanitation and trade and industry sectors, with a focus on Demolition, Drainage, Manufacturing and Industrial Machinery. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese

[Construction Work] Sai-Nishi-Ta No. 0802 Public Irrigation and Drainage Project: Umori Misato Area, Umori Misato Drainage Pump Station Phase 8 (Electrical Equipment Manufacturing and Installation) General Competitive Bidding Announcement
Form No. 2 Bidding Announcement Individual Matters [Post-Qualification Type] Bidding Announcement (Individual Matters) General Competitive Bidding Announcement for the Umori Misato Area, Umori Misato Drainage Pump Station Phase 8 (Electrical Equipment Manufacturing and Installation) Construction Work for the Public Irrigation and Drainage Project. We hereby announce that a post-qualification type general competitive bid will be held for the Umori Misato Area, Umori Misato Drainage Pump Station Phase 8 (Electrical Equipment Manufacturing and Installation) Construction Work for the Public Irrigation and Drainage Project, in accordance with the provisions of Article 127 of the Gifu Prefecture Accounting Regulations (Showa 32 Gifu Prefecture Ordinance No. 19; hereinafter referred to as the "Regulations").
The bidding announcement shall consist of "Form No. 1 Bidding Announcement Common Matters [Post-Qualification Type]" and this document.
"Form No. 1 Bidding Announcement Common Matters [Post-Qualification Type]" is posted on the Gifu Prefecture website.
This bid will be conducted through the electronic bidding system. However, if you have changed your trade name or company name, address, or representative and have not yet completed the procedures for changing your IC card, please participate in the bid using paper.
If you continue to use your IC card as is, your bid may be invalidated or you may be subject to suspension of bidding eligibility.
Please contact us if you have any questions.
June 22, Reiwa 8 (2026) Eiji Wada, Director, Seino Regional Agricultural and Forestry Office, Gifu Prefecture 1 Construction Work Subject to General Competitive Bidding (1) Construction Work Number Sai-Nishi-Ta No. 0802 Construction Work Name Construction Work Name Construction Work Name Public Irrigation and Drainage Project, Umori Misato Area, Umori Misato Drainage Pump Station Phase 8 (Electrical Equipment Manufacturing and Installation) Construction Work (Electronic Bidding Target Project) (2) Construction Location Within Yokosone-cho, Ogaki City (3) Construction Outline Electrical Equipment Manufacturing and Installation Work: 1 set Transformer and Switchgear: 1 set Field Operation Panel: 7 units Others: 1 set (4) Construction Period From the date of contract to April 28, Reiwa 10 (2028) (5) Estimated Price: 296,775,600 yen (including consumption tax and local consumption tax) (6) Low Bid Price Investigation System: Yes (7) Minimum Reserve Price System: No (8) This construction work is subject to the obligation to implement separate demolition and recycling of materials and recycling of specified construction waste, in accordance with the Act on the Recycling of Resources in Construction Work (Act No. 104 of 2000).
(9) This construction work will be conducted using the electronic bidding system.
However, if it is difficult to use the electronic bidding system, written submission may be permitted with prior approval from the head of the contracting organization.
(10) This construction work is a trial project for the correction of site management costs to contribute to heatstroke countermeasures, and the correction of site management costs will be made at the time of design change according to the daily maximum temperature.
(11) This construction work is a model project for a full two-day weekend system (site closure) based on the principle of a two-day weekend.
For details, please refer to the "Implementation Guidelines for Model Projects with Two-Day Weekends for Gifu Prefecture-Ordered Works".
(15) This construction work is a trial project for remote on-site observation in construction sites.
For details, please refer to the "Trial Guidelines for Remote On-Site Observation in Construction Sites".
(14) This construction work is a model project utilizing the Construction Career Up System.
For details, please refer to the "Implementation Guidelines for Model Projects Utilizing the Construction Career Up System for Gifu Prefecture-Ordered Works".
(15) This construction work is a contractor-desired "Model Project Utilizing ICT".
For details, please refer to the "Implementation Guidelines for Model Projects Utilizing ICT for Works Ordered by the Gifu Prefectural Government's Agricultural Department".
(15) This construction work is an ASP-based information sharing system utilization project.
For details, please refer to the "Gifu Prefecture Information Sharing System Operation Manual (Construction Edition)".
2 Bidding Participation Qualifications This construction work will be bid on by a single entity or a joint venture of two companies (hereinafter referred to as "Joint Venture").
(1) Qualifications required for bidding as a single entity are as follows:
Required Construction Industry License: Specified/General (Electrical Construction) Gifu Prefecture Construction Work Bidding Qualification Register: Registered Industry/Total Score: Electrical Construction / Total Score 750 points or more Construction Experience Requirements: Must have experience in constructing the following works as the prime contractor by the application deadline date after fiscal year 2011. (Experience as a member of a joint venture is limited to those with a capital contribution ratio of 40% or more.) However, for works ordered by the national government or Gifu Prefecture, those with an evaluation score of less than 65 points are excluded. Construction experience of electrical works stipulated by the Construction Industry Act, completed and delivered, with a contract cost of 149 million yen or more. On-site Technical Staff Requirements: The chief technical officer or supervising technical officer engaged in this work must meet the following criteria (a and c, or b and c) and be able to be assigned at the start of the contract period for this work. However, they must be able to be assigned exclusively from the start of on-site construction (December 1, Reiwa 9 (2027)). If the Special Provision No. 1 for Exclusive Assignment, Special Provision No. 2 for Exclusive Assignment, or Article 26-5 of the Construction Industry Act is applied, exclusive assignment is not required. Technical staff assigned during the factory manufacturing or material procurement period, and not involving on-site construction, do not need to be the same as the chief technical officer or supervising technical officer for on-site construction. Such technical staff may meet criteria (a or b) and be assignable at the start of the contract period for this work. Furthermore, technical staff assigned during the factory manufacturing period are not necessarily required to be exclusively assigned if they are manufactured under an integrated management system with other similar works within the same factory. a. Must be a Professional Engineer (Electrical and Electronics) or possess equivalent or higher qualifications. b. Must be a Class 1 Electrical Construction Management Engineer, Class 2 Electrical Construction Management Engineer, or possess equivalent or higher qualifications. c. Must have experience as a chief technical officer, supervising technical officer, assistant supervising technical officer, or site manager for electrical works stipulated by the Construction Industry Act, completed and delivered by the application deadline date after fiscal year 2011, with a contract cost of 90 million yen or more as the prime contractor. However, experience as an additional technician required in addition to the chief technical officer, supervising technical officer, or assistant supervising technical officer stipulated by the Construction Industry Act, when a contract is concluded at a price below the low bid price investigation standard price, is excluded. (Experience as a chief technical officer or supervising technical officer includes experience under Special Provision No. 1 for Exclusive Assignment, Special Provision No. 2 for Exclusive Assignment (including specially supervising technical officers stipulated by the Construction Industry Act revised and enforced on October 1, Reiwa 2 (2020)), and Article 26-5 of the Construction Industry Act. Furthermore, experience as a chief technical officer, supervising technical officer, assistant supervising technical officer, or site manager as a member of a joint venture is limited to those with a capital contribution ratio of 40% or more.) However, exclusive assignment is not required if any of the following conditions (i) to (iii) are met. i. Works with a contract price of less than 10 million yen. ii. Works with a contract price of 10 million yen or more but less than 45 million yen (less than 90 million yen for architectural works specified by the Construction Industry Act), provided that the average construction performance evaluation score for the relevant work type in Gifu Prefecture-ordered works in Reiwa 7 and 6 is 75 points or more (if there is no record of receiving orders for the relevant work type in Gifu Prefecture-ordered works in Reiwa 7 and 6, the average score for Reiwa 5 and 4 is 75 points or more). iii. Works with a contract price of 10 million yen or more but less than 45 million yen (less than 90 million yen for architectural works) awarded by the comprehensive evaluation bidding system. Technical Staff Overlap Conditions: This construction work allows for the application of Special Provision No. 1 for Exclusive Assignment, Special Provision No. 2 for Exclusive Assignment, and Article 26-5 of the Construction Industry Act. Business Location Requirements: Must have a head office registered in the Gifu Prefecture Construction Work Bidding Qualification Register located within Gifu Prefecture. Consignee of Design Services, etc.: The consignee of design services, etc., for this project is: Wakasuzu Consultants Co., Ltd. Other Conditions: As specified in "1. Bidding Participation Qualifications" of "Form No. 1 Bidding Announcement Common Matters [Post-Qualification Type]". (2) When participating in the bid as a joint venture of two companies, the formation is voluntary, and the qualifications required for bidding participation are as follows: Required Construction Industry License: Specified/General (Electrical Construction) (All members) Gifu Prefecture Construction Work Bidding Qualification Register: Registered Industry/Total Score: Electrical Construction / Total Score: Representative member (defined as the member with the largest capital contribution ratio among all members; hereinafter the same) 750 points or more, other members 750 points or more. Each member's capital contribution ratio must be 40% or more. Construction Experience Requirements: : Must have experience in constructing the following works as the prime contractor by the application deadline date after fiscal year 2011. (Experience as a member of a joint venture is limited to those with a capital contribution ratio of 40% or more.) However, for works ordered by the national government or Gifu Prefecture, those with an evaluation score of less than 65 points are excluded. - Electrical works, completed and delivered, with a contract cost of 149 million yen or more. : No specific requirements. On-site Technical Staff Requirements: : The chief technical officer or supervising technical officer engaged in this work must meet the following criteria (a and c, or b and c) and be able to be assigned at the start of the contract period for this work. However, they must be able to be assigned exclusively from the start of on-site construction (December 1, Reiwa 9 (2027)). If the Special Provision No. 1 for Exclusive Assignment, Special Provision No. 2 for Exclusive Assignment, or Article 26-5 of the Construction Industry Act is applied, exclusive assignment is not required. Technical staff assigned during the factory manufacturing or material procurement period, and not involving on-site construction, do not need to be the same as the chief technical officer or supervising technical officer for on-site construction. Such technical staff may meet criteria (a or b) and be assignable at the start of the contract period for this work. Furthermore, technical staff assigned during the factory manufacturing period are not necessarily required to be exclusively assigned if they are manufactured under an integrated management system with other similar works within the same factory. a. Must be a Professional Engineer (Electrical and Electronics) or possess equivalent or higher qualifications. b. Must be a Class 1 Electrical Construction Management Engineer, Class 2 Electrical Construction Management Engineer, or possess equivalent or higher qualifications. c. Must have experience as a chief technical officer, supervising technical officer, assistant supervising technical officer, or site manager for electrical works stipulated by the Construction Industry Act, completed and delivered by the application deadline date after fiscal year 2011, with a contract cost of 90 million yen or more as the prime contractor. However, experience as an additional technician required in addition to the chief technical officer, supervising technical officer, or assistant supervising technical officer stipulated by the Construction Industry Act, when a contract is concluded at a price below the low bid price investigation standard price, is excluded. (Experience as a chief technical officer or supervising technical officer includes experience under Special Provision No. 1 for Exclusive Assignment, Special Provision No. 2 for Exclusive Assignment (including specially supervising technical officers stipulated by the Construction Industry Act revised and enforced on October 1, Reiwa 2 (2020)), and Article 26-5 of the Construction Industry Act. Furthermore, experience as a chief technical officer, supervising technical officer, assistant supervising technical officer, or site manager as a member of a joint venture is limited to those with a capital contribution ratio of 40% or more.) : No specific requirements. Technical Staff Overlap Conditions: This construction work allows for the application of Special Provision No. 1 for Exclusive Assignment, Special Provision No. 2 for Exclusive Assignment, and Article 26-5 of the Construction Industry Act. Business Location Requirements: One of the members of the joint venture must have a head office located within Gifu Prefecture, registered in the Gifu Prefecture Construction Work Bidding Qualification Register. Consignee of Design Services, etc.: The consignee of design services, etc., for this project is: Wakasuzu Consultants Co., Ltd. Other Conditions: As specified in "1. Bidding Participation Qualifications" of "Form No. 1 Bidding Announcement Common Matters [Post-Qualification Type]". 3. Department in Charge: Department, Phone Number, Address: Bidding Department: Gifu Prefecture Seino Regional Agricultural and Forestry Office, General Affairs Division, Management Coordination Section, 0584-73-1111 (ext. 319), Postal Code 503-0838, 422-3 Ezaki-cho, Ogaki City, Gifu Prefecture, 3rd Floor, Seino General Government Building. Construction Department: Gifu Prefecture Seino Regional Agricultural and Forestry Office, Agricultural Land Development Division, Agricultural Land Disaster Prevention Section, 0584-73-1111 (ext. 330). 4. Bidding Schedule: Procedures, Period/Date, Method/Location: Inspection of Design Documents: From 9:00 AM on Monday, June 22, Reiwa 8 (2026) to 4:00 PM on Wednesday, July 15, Reiwa 8 (2026). Download from the electronic bidding system, etc. Also available for viewing at the Bidding Department. Acceptance of Questions: From 9:00 AM on Monday, June 22, Reiwa 8 (2026) to 4:00 PM on Friday, July 3, Reiwa 8 (2026). Via the electronic bidding system. *For paper bids, please submit in person to the Construction Department. Viewing of Answers: From 9:00 AM on Monday, June 22, Reiwa 8 (2026) to 4:00 PM on Wednesday, July 15, Reiwa 8 (2026). Via the electronic bidding system. Also available for viewing at the Construction Department. Submission of Applications: From 9:00 AM on Monday, June 22, Reiwa 8 (2026) to 4:00 PM on Monday, June 29, Reiwa 8 (2026). Via the electronic bidding system. *For paper bids, please submit in person to the Bidding Department. Notification of Bidding Participation Notice: By Wednesday, July 1, Reiwa 8 (2026). Via the electronic bidding system. Submission of Bids and Other Documents: From 9:00 AM on Tuesday, July 14, Reiwa 8 (2026) to 4:00 PM on Wednesday, July 15, Reiwa 8 (2026). Via the electronic bidding system. Bid Opening: From 10:00 AM on Thursday, July 16, Reiwa 8 (2026). Bidding Room, 3rd Floor, Gifu Seino General Government Building. Submission of Confirmation Documents (Successful Bidder Candidates Only): From 9:00 AM on Friday, July 17, Reiwa 8 (2026) to 4:00 PM on Tuesday, July 21, Reiwa 8 (2026). (However, this does not apply if separate submission instructions are given.) Submit in person to the Bidding Department. Complaints: Within 7 days from the date of notification of the Bidding Participation Notice or Bidding Participation Qualification Disqualification Notice (excluding prefectural holidays). Submit in person to the Bidding Department. Written form (free format). Response to Complaints: Within 10 days from the day following the last day for filing complaints (excluding prefectural holidays), in principle. Response in writing. Publication of Bid Results: On the day the successful bidder is decided. Via the Bidding Information Service or prefectural website. Also available for viewing at the Bidding Department. *) For paper bids, submission in person is permitted, but submission by mail or electronic transmission will not be accepted (period and dates are the same). Note) Submission documents are described in "Form No. 1 Bidding Announcement Common Matters [Post-Qualification Type]".
5. Comprehensive Evaluation...

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on June 22, 2026. Last refreshed 8 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 岐阜県

岐阜県 has issued 397 procurement notices on BidsFactory, including 165 currently open and 53 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 6, 2026.

Frequently asked questions about this tender

What type of contract is this?

This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 岐阜県 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source