Tenders/[Shimochu No. 0803] Public Invitation for Bids Regarding the Aizugai Drainage and Kuroishi Oyō Water Construction Work for the Southern Hida Northern District of the Prefectural Upland Area Comprehensive Development Project
Open🇯🇵JapanWorks

[Shimochu No. 0803] Public Invitation for Bids Regarding the Aizugai Drainage and Kuroishi Oyō Water Construction Work for the Southern Hida Northern District of the Prefectural Upland Area Comprehensive Development Project

Auto-translated from Japanese
Original title: 【下中第0803号】 県営中山間地域総合整備事業 南飛騨北部地区 相津垣内排水、黒石大屋用水工事 に関する一般競争入札公告
岐阜県
Published: Aug 6, 2026
Updated: Aug 10, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the agriculture and food security, rural development and construction and civil works sectors, with a focus on Livestock, Rehabilitation and Demolition. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the agriculture and food security sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
[Shimochu No. 0803] Public Invitation for Bids Regarding the Aizugai Drainage and Kuroishi Oyō Water Construction Work for the Southern Hida Northern District of the Prefectural Upland Area Comprehensive Development Project Form No. 2 Bid Announcement Individual Matters [Post-qualification Type · Regional Comprehensive Evaluation Bidding Method] 1. Construction work subject to open competitive bidding (1) Work number Shimochu No. 0803 Work name Work name Work name (2) Work location (3) Work description Unnecessary lines (4) Construction period From the contract date to March 19, Reiwa 9 (5) Estimated price 25,514,500 yen (including consumption tax and local consumption tax) (6) Low bid price investigation system Yes (Disqualification criteria Yes) (7) Minimum reserve price system No (8) (9) (10) This work is a "On-site Remote Presence Construction Work" requested by the contractor. For details, please refer to the "Trial Guidelines for Remote Presence at Construction Sites". (18) (19) This work is an ASP-based information sharing system utilization project using the contractor-requested method. For details, please refer to the "Gifu Prefecture Information Sharing System Operation Manual (Construction Edition)". (13) (14) This work is a "Complete Weekend 2-Day Off" work (site closure) project, based on the principle of complete two days off per week (Saturdays and Sundays). For details, please refer to the "Implementation Guidelines for Complete Weekend 2-Day Off Work (Saturdays and Sundays) Ordered by Gifu Prefecture". This work is a "Construction Career Up System Utilization Model Project" requested by the contractor. For details, please refer to the "Implementation Guidelines for Construction Career Up System Utilization Model Projects Ordered by Gifu Prefecture". This work is a "Construction Site Environment Improvement Model Project" requested by the contractor. For details, please refer to the "Implementation Guidelines for Construction Site Environment Improvement Model Projects Ordered by Gifu Prefecture". This work is a "Model Project Utilizing ICT" requested by the contractor. For details, please refer to the "Implementation Guidelines for Model Projects Utilizing ICT Ordered by the Gifu Prefectural Agricultural Policy Department". (12) This work is a trial project for a rural development type comprehensive evaluation bidding method that supports initiatives contributing to rural development, such as efforts to prevent infectious diseases in livestock in the construction industry. This work is a trial project for supplementing on-site management costs to facilitate heatstroke countermeasures, and the supplementation of on-site management costs according to the daily maximum temperature will be performed during the design change. (11) (15) (16) Prefectural Upland Area Comprehensive Development Project, Southern Hida Northern District, Aizugai Drainage, Kuroishi Oyō Water Construction Work (Electronic Bidding Target Project) Ancillary work: 3 locations Aizugai Drainage L=187.7m This work is a trial project for a human resource development type comprehensive evaluation bidding method aimed at supporting the securing and training of human resources in the construction industry and improving the working environment. Bid Announcement (Individual Matters) This work is a comprehensive evaluation bidding method (regional type) project where the successful bidder is determined by accepting technical proposals and comprehensively evaluating factors other than price along with the price. This work is subject to the obligation of separate demolition, etc., and recycling of specified construction waste materials, in accordance with the Act on the Recycling of Construction Materials, etc. (Act No. 104 of 2000). This work will be conducted using the electronic bidding system. However, if it is difficult to use the electronic bidding system, written submission is permitted only with the prior approval of the head of the contracting organization (hereinafter referred to as the "paper bidding method"). Earthwork: 1 lot, Water channel work (slotted U-shaped channel H600xB800, etc.) L=171.0m, Ancillary work: 3 locations Kuroishi Oyō Water L=37.1m Earthwork: 1 lot, Asphalt restoration work A=24.7m2, Water channel work (PU250) L=30.0m In Mase Nakagiri / Kuroishi, Gero City, regarding the Aizugai Drainage and Kuroishi Oyō Water Construction Work for the Southern Hida Northern District of the Prefectural Upland Area Comprehensive Development Project, we hereby announce an open competitive bid with post-qualification, in accordance with the provisions of Article 127 of the Gifu Prefecture Accounting Regulations (Showa 32 Gifu Prefecture Ordinance No. 19) (hereinafter referred to as the "Regulations"). The bid announcement shall consist of "Form No. 1 Bid Announcement Common Matters [Post-qualification Type]" and this document. "Form No. 1 Bid Announcement Common Matters [Post-qualification Type]" is posted on the Gifu Prefecture website. Prefectural Upland Area Comprehensive Development Project, Southern Hida Northern District, Aizugai Drainage, Kuroishi Oyō Water Construction Work (Electronic Bidding Target Project) This bid will be executed through the electronic bidding system. However, if you have changed your company name, address, or representative and have not completed the IC card change procedure, please participate using paper bids. If you use your current IC card as is, your bid may be invalidated or you may be subject to suspension of bidding eligibility. Please contact us if you have any questions. (17) August 6, Reiwa 8 Katsumi Higashi, Director of Gero Agricultural Affairs Office, Gifu Prefecture 2. Bidding qualifications The qualifications required for participation in this bid are as follows. (a) (b) (c) However, exclusive assignment is not required if any of the following (1) to (3) apply: (1) Work with a contract price of less than 10 million yen. (2) (3) Comprehensive evaluation bidding method work with a contract price of 10 million yen or more but less than 45 million yen. 3. Department in charge Bidding Department: Gifu Prefectural Gero Agricultural Affairs Office: 0576-52-3111: 2605-1 Hagihara-cho Hane, Gero City, Gifu Prefecture, 509-2592: Work Department: Gifu Prefectural Gero Agricultural Affairs Office: 0576-52-3111: 4th Floor, Gero General Government Building, Gifu Prefecture "Form No. 1 Bid Announcement Common Matters [Post-qualification Type]" Table 2: The head office must be located within the jurisdiction of the Gero Agricultural Affairs Office and be listed in the Gifu Prefecture Construction Work Bid Participation Qualification Register. This work allows for the application of Special Provision No. 1, Special Provision No. 2, and Article 26-5 of the Construction Industry Act. Must have experience as a chief technical personnel, supervising technical personnel, assistant supervising technical personnel, or site manager for civil engineering work as defined by the Construction Industry Act, with a construction cost of 7.7 million yen or more, which has been completed and delivered by the application deadline date after Reiwa 23. However, experience as additional personnel required in addition to the chief technical personnel, supervising technical personnel, or assistant supervising technical personnel, as stipulated by the Construction Industry Act, when contracting at a price below the low bid price investigation standard price, shall be excluded. Specific/General (Civil Engineering work): Grade 1 Civil Engineering Construction Management Engineer or Grade 2 Civil Engineering Construction Management Engineer, or equivalent or higher qualification. (Stock Company) Koei Consultant: Must have a total score of 750 or more in Civil Engineering work as defined by the Construction Industry Act. Construction experience requirements: Civil engineering work as defined by the Construction Industry Act, with a construction cost of 13 million yen or more, which has been completed and delivered. Contractors for design services, etc.: Work with a contract price of 10 million yen or more but less than 45 million yen, provided that the average construction performance evaluation score for the relevant work type (Civil Engineering (General)) ordered by Gifu Prefecture in Reiwa 7 and 6 is 75 points or more (if there is no record of receiving orders for the relevant work type (Civil Engineering (General)) ordered by Gifu Prefecture in Reiwa 7 and 6, the average score for Reiwa 5 and 4 is 75 points or more). Technical personnel concurrent holding of positions requirements: Professional Engineer (Agriculture Department "Agricultural and Rural Engineering") or equivalent or higher qualification. The chief technical personnel or supervising technical personnel engaged in this work must meet the following criteria (a and c, or b and c) and be able to be assigned at the start of the contract period for this work. However, on the day the site work for this project begins (October 3, Reiwa 8), chief technical personnel and supervising technical personnel must be able to be assigned exclusively. In addition, when applying Special Provision No. 1 and Special Provision No. 2 for exclusive assignment, and when applying Article 26-5 of the Construction Industry Act, exclusive assignment is not required. However, for work ordered by the national government and Gifu Prefecture, work with an evaluation score of less than 65 points in the construction performance evaluation shall be excluded. Business location requirements: Contractors for design services, etc. for the relevant work are as follows. Placement of technical personnel requirements: Gifu Prefecture Construction Work Bid Participation Qualification Register: Registered industry/Total score: Must have experience in constructing the following work as the prime contractor by the application deadline date after Reiwa 23. (Experience as a member of a joint venture is limited to those with a capital contribution ratio of 40% or more.) Department: Category: Address: Phone number: Other conditions: General Affairs Division, Management Coordination Section: As specified in "1. Matters concerning bidding qualifications" of "Form No. 1 Bid Announcement Common Matters [Post-qualification Type]". Forestry Division, Forest Engineering First Section: (Ext. 204) (Ext. 212) (19) This work is an ASP-based information sharing system utilization project using the contractor-requested method. For details, please refer to the "Gifu Prefecture Information Sharing System Operation Manual (Construction Edition)". This work is a "Construction Site Environment Improvement Model Project" requested by the contractor. For details, please refer to the "Implementation Guidelines for Construction Site Environment Improvement Model Projects Ordered by Gifu Prefecture". 4. Bidding schedule Procedure, etc. Period/Date: Method/Location: Design document viewing: August 6, Reiwa 8 (Thursday) from 9:00 AM: Download from electronic bidding system. August 12, Reiwa 8 (Tuesday) 4:00 PM: Question submission: August 6, Reiwa 8 (Thursday) from 9:00 AM: Via electronic bidding system. August 31, Reiwa 8 (Monday) 4:00 PM: *For paper bids, bring to the bidding department. Answer document viewing: August 6, Reiwa 8 (Thursday) from 9:00 AM: Via electronic bidding system. August 12, Reiwa 8 (Tuesday) 4:00 PM: Also available for viewing at the bidding department. Application submission: August 6, Reiwa 8 (Thursday) from 9:00 AM: Via electronic bidding system. August 26, Reiwa 8 (Wednesday) 4:00 PM: August 27, Reiwa 8 (Thursday) 4:00 PM: Via electronic bidding system. August 28, Reiwa 8 (Friday) from 9:00 AM: Via electronic bidding system. August 28, Reiwa 8 (Friday) 4:00 PM: Bid opening: August 28, Reiwa 8 (Friday) 10:30 AM: Electronic bidding system. Gero General Government Building, Gifu Prefecture, Bid Room (Meeting Room 3-1). Confirmation document submission (successful bidder only): August 29, Reiwa 8 (Saturday) from 9:00 AM: Bring to the bidding department. August 29, Reiwa 8 (Saturday) 4:00 PM: Bring to the bidding department. Written document (free format). Written document. Response to complaint: Within 5 days from the date of each question submission: Response in writing. Bid results publication: On the day the successful bidder is decided: Via bid information service. Also available for viewing at the bidding department. *) For paper bids, submission is permitted, but submission by mail or electronic transmission is not accepted (period and date are the same). Note) Submission documents are described in "Form No. 1 Bid Announcement Common Matters". 5. Matters concerning comprehensive evaluation bidding method (1) Mechanism of comprehensive evaluation bidding method: The comprehensive evaluation bidding method for this work will be determined as follows. ① A standard score of 100 points will be awarded if the bidding qualifications are met. ② An additional score of up to 17.5 points will be given based on the experience shown in the technical documentation. (2) Evaluation items: The following items will be evaluated. (a) Matters concerning corporate capabilities (b) Matters concerning the capabilities of the planned technical personnel (c) Matters concerning regional requirements August 25, Reiwa 8 Complaint filing: *) For paper bids, bring to the bidding department along with Appendix Form 1. August 25, Reiwa 8 August 13, Reiwa 8 August 24, Reiwa 8 August 17, Reiwa 8 August 25, Reiwa 8 August 6, Reiwa 8 Procedure, etc.: Also available for viewing at the bidding department (or work department). Within 10 days from the day following the last day for filing a complaint (excluding public holidays). (Successful bidder only) August 27, Reiwa 8 Bid participation notification: August 26, Reiwa 8 Bid submission deadline: August 28, Reiwa 8 August 6, Reiwa 8 August 17, Reiwa 8 August 24, Reiwa 8 August 25, Reiwa 8 Method/Location: Period/Date: August 6, Reiwa 8 August 12, Reiwa 8 The outline is shown below, but specific technical requirements and bidding evaluation criteria are clearly stated in the attached "Comprehensive Evaluation Method Details". *) For paper bids, bring a copy of the bid participation qualification notification. Response to complaint: Within 7 days from the date of notification of bid participation notification or notification of ineligibility for bid participation (excluding public holidays): August 6, Reiwa 8 August 6, Reiwa 8 1. Mechanism of comprehensive evaluation bidding method [Rural Development Type]: ① The mechanism of the comprehensive evaluation bidding method is shown below. ◎A ○B ×C ×D A: Successful bidder ◎ B: Unsuccessful bidder (evaluation value higher than the standard evaluation value but lower than A) ○ C: Unsuccessful bidder (exceeds estimated price) × D: Unsuccessful bidder (below standard evaluation value) × ② Determination of successful bidder: The following conditions must be met. a. Bid price ≤ Estimated price b. Minimum requirements (standard proposal conditions) must be met. (Standard score or higher) c. Evaluation value ≥ Standard evaluation value (If a and b are met, c is automatically met.) 2. Evaluation items and evaluation indicators: ① Evaluation items: (a) Matters concerning corporate capabilities (b) Matters concerning the capabilities of the planned technical personnel (c) Matters concerning regional requirements ② Evaluation indicators: (b) Evaluation based on experience in similar/analogous construction work. 3. Standard score and additional score: ① Standard score: If the standard proposal conditions are met, a standard score of 100 points will be awarded. ② Additional score: Points will be awarded according to the evaluation criteria. 4. Awarding of additional points: The method of awarding additional points to bidders is shown in the table below. Construction performance evaluation score: ○ 2 Construction experience: ○ 1 Efforts for human resource development: ○ 1 Construction experience: ○ 1 Business base: ○ 1 Participation in disaster prevention agreements, etc.: ○ 2 ○ 1 Volunteer activities: ○ 1 Nearby area construction experience: ○ 1 Snow removal work experience, etc.: ○ 2 ○ 1 ○ 0.5 ○ 1.5 Regional requirements: Experience in river/sabō maintenance work during holidays and nights: Attached: Details of Comprehensive Evaluation Bidding Method [Rural Development Type] (a) Evaluation based on construction performance evaluation score and experience in similar/analogous construction work. Standard score + Additional score = 116 points Standard score = 100 points Road maintenance work during holidays and nights: Evaluation value → Estimated price *If there are two or more bidders who meet the winning conditions, the bidder with the highest evaluation value will be the successful bidder. If the evaluation values are the same, the successful bidder will be determined by lottery.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on August 6, 2026. Last refreshed today. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 岐阜県

岐阜県 has issued 399 procurement notices on BidsFactory, including 139 currently open and 53 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 7, 2026.

Frequently asked questions about this tender

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 岐阜県 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Agriculture & Food Security sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

岐阜県
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.