[Keichu No. 0805] Prefectural Upland Area Comprehensive Development Project Yasaka District Oyoyoro Canal Phase 2 Construction Announcement of General Competitive Bidding
Form No. 2 Tender Announcement Individual Matters [Post-Qualification Type]
TENDER ANNOUNCEMENT (INDIVIDUAL MATTERS)
Announcement of General Competitive Bidding for Prefectural Upland Area Comprehensive Development Project Yasaka District Oyoyoro Canal Phase 2 Construction
We hereby announce that a post-qualification general competitive bidding will be held for the Prefectural Upland Area Comprehensive Development Project Yasaka District Oyoyoro Canal Phase 2 Construction, in accordance with the provisions of Article 127 of the Gifu Prefectural Accounting Regulations (Showa 32 Gifu Prefectural Ordinance No. 19; hereinafter referred to as the "Regulations").
The tender announcement shall consist of "Form No. 1 Tender Announcement Common Matters [Post-Qualification Type]" and this document.
"Form No. 1 Tender Announcement Common Matters [Post-Qualification Type]" is posted on the Gifu Prefecture website.
This tender will be conducted through the electronic bidding system. However, if you have changed your company name, address, or representative and have not yet completed the procedures for changing your IC card, please participate in the paper bidding.
If you continue to use your current IC card, your bid may be invalidated or you may be subject to suspension of bidding eligibility.
Please contact us if you have any questions.
August 10, Reiwa 8 (2026)
Director of Ena Regional Forest Office, Gifu Prefecture, Hiroyasu Furusawa
1. Construction Work Subject to General Competitive Bidding
(1) Construction Number: Keichu No. 0805
Construction Name: Prefectural Upland Area Comprehensive Development Project Yasaka District Oyoyoro Canal Phase 2 Construction (Electronic Bidding Applicable Project)
(2) Construction Location: Yamaguchi, Nakatsugawa City
(3) Construction Outline:
Oyoyoro Canal L=177.1m
Earthwork: 1 set
Canal Work: L=172.9m
Ancillary Work: 1 set
(4) Construction Period: Approximately 200 days
(5) Estimated Price: ¥15,199,800 (including consumption tax and local consumption tax)
(6) Low Bid Price Investigation System: Yes
(7) Minimum Reserve Price System: No
(8) This construction work is subject to the obligation to implement separate dismantling, etc., and recycling of specified construction waste materials, in accordance with the Act on the Recycling of Resources in Construction Work (Act No. 104 of 2000).
(9) This construction work will be conducted using the electronic bidding system.
However, if it is difficult to use the electronic bidding system, written submission is permitted only with prior consent from the head of the contracting authority.
(10) This construction work is a regional type comprehensive evaluation bidding method project where the successful bidder is determined by evaluating factors other than price and price in combination, after receiving proposals for technical documents.
(11) This construction work is a model project for improving the construction site environment requested by the contractor.
For details, please refer to the "Implementation Guidelines for Model Projects for Improving Construction Site Environment Ordered by Gifu Prefecture."
(12) This construction work is subject to the trial implementation of on-site management cost adjustments that contribute to heatstroke countermeasures, and on-site management costs will be adjusted at the time of design modification based on the daily maximum temperature.
(13) This construction work is a trial project for the rural development type comprehensive evaluation bidding method, aimed at supporting initiatives that contribute to rural development, such as efforts to prevent infectious diseases in livestock in the construction industry.
(14) This construction work is a model project utilizing ICT requested by the contractor.
For details, please refer to the "Implementation Guidelines for Model Projects Utilizing ICT Ordered by the Agricultural Policy Department, Gifu Prefecture."
(15) This construction work is a full weekend off (Saturday and Sunday) construction project (site closure) that assumes full weekend off (Saturday and Sunday) as a principle.
For details, please refer to the "Implementation Guidelines for Full Weekend Off (Saturday and Sunday) Construction Projects Ordered by Gifu Prefecture."
(16) This construction work is a model project utilizing the Construction Career Up System requested by the contractor.
For details, please refer to the "Implementation Guidelines for Model Projects Utilizing the Construction Career Up System Ordered by Gifu Prefecture."
(17) This construction work is a human resource development type comprehensive evaluation bidding method trial project, aimed at supporting initiatives such as securing and training human resources and improving the working environment in the construction industry.
(18) This construction work is a trial project for remote on-site observation in construction sites requested by the contractor.
For details, please refer to the "Trial Guidelines for Remote On-Site Observation in Construction Sites."
(19) This construction work is an ASP-based information sharing system utilization project requested by the contractor.
For details, please refer to the "Gifu Prefecture Information Sharing System Operation Manual (Construction Edition)."
2. Bidding Eligibility Requirements
The qualifications required for participation in the bidding for this construction work are as follows:
Required Construction Business Permit: Specific/General (Civil Engineering Construction)
Registered Industries and Overall Score in the Gifu Prefecture Construction Work Bidding Eligibility Register:
- Civil Engineering Construction: Overall Score of 750 points or more
Conditions Regarding Construction Experience:
Bidders must have experience as the prime contractor in the following construction work, completed and delivered by the bid application deadline in FY 2011 or later (experience as a member of a joint venture is limited to cases where the investment ratio is 40% or more):
- Construction work defined by the Construction Industry Act (Civil Engineering Construction), with a contract value of 7.6 million yen or more, completed and delivered.
However, for construction work ordered by the national government or Gifu Prefecture, those with an average construction performance evaluation score of less than 65 points are excluded.
Conditions Regarding Assigned Technicians:
The chief technician or supervising technician engaged in this construction work must meet the following criteria (a and c, or b and c) and be able to be assigned at the start of the contract period. However, they must be able to be assigned exclusively from the start of on-site construction (October 10, Reiwa 8 (2026)).
Note: Exclusivity is not required when applying Special Provisions No. 1 and No. 2 for exclusivity, or when applying Article 26-5 of the Construction Industry Act.
a. Must possess qualifications such as Professional Engineer (Agriculture "Agricultural Civil Engineering" or "Agricultural and Rural Engineering") or equivalent or higher.
b. Must possess qualifications such as a Class 1 Civil Engineering Construction Management Engineer, Class 2 Civil Engineering Construction Management Engineer, or equivalent or higher.
c. Must have experience as a chief technician, supervising technician, assistant supervising technician, or site manager in civil engineering construction work defined by the Construction Industry Act, with a contract value of 4.6 million yen or more (including tax), completed and delivered by the bid application deadline in FY 2011 or later.
However, experience as an additional technician required in cases where the contract is concluded at a price below the low bid price investigation standard price under the low bid price investigation system is excluded (experience as a chief technician or supervising technician includes cases where Special Provisions No. 1 and No. 2 for exclusivity (including special supervising technicians defined by the Construction Industry Act enforced on October 1, Reiwa 2 (2020)) and Article 26-5 of the Construction Industry Act were applied.
Furthermore, experience as a chief technician, supervising technician, assistant supervising technician, or site manager as a member of a joint venture is limited to cases where the investment ratio is 40% or more.
However, exclusivity is not required if any of the following conditions (i) to (iii) are met:
i. Construction work with a contract price of less than 10 million yen.
ii. Construction work with a contract price of 10 million yen or more but less than 45 million yen (or less than 90 million yen for architectural construction work defined by the Construction Industry Act), provided that the average construction performance evaluation score for the relevant work type (Civil Engineering Construction) for Gifu Prefecture-ordered construction in Reiwa 7 and 6 (2025 and 2024) is 75 points or more (if there is no order record for the relevant work type (Civil Engineering Construction) for Gifu Prefecture-ordered construction in Reiwa 7 and 6, the average score for Reiwa 5 and 4 (2023 and 2022) is 75 points or more).
iii. Comprehensive evaluation bidding method construction work with a contract price of 10 million yen or more but less than 45 million yen (or less than 90 million yen for architectural construction work).
Conditions Regarding Concurrent Assignment of Technicians:
This construction work allows for the application of Special Provisions No. 1 and No. 2 for exclusivity, and Article 26-5 of the Construction Industry Act.
Conditions Regarding Location of Business Office:
Bidders must have their head office located within the jurisdiction of the Ena Regional Forest Office, as listed in "Table 2" of "Form No. 1 Tender Announcement Common Matters [Post-Qualification Type]", and be listed in the Gifu Prefecture Construction Work Bidding Eligibility Register.
Contractor for Design and Other Services:
The contractor for design and other services for this construction work is: Yo-ei Consultant Co., Ltd.
Other Conditions:
As specified in "1. Matters Concerning Bidding Eligibility" of "Form No. 1 Tender Announcement Common Matters [Post-Qualification Type]".
3. Department in Charge
Category | Department | Phone Number | Address
---|---|---|---
Bidding Affairs | General Affairs Division, Management Coordination Section, Ena Regional Forest Office, Gifu Prefecture | 0573-26-1111 (Ext. 283, 284) | 2nd Floor, Gifu Prefectural Ena General Government Building, 1067-71 Masago Goda, Nagashima-cho, Ena City, Gifu Prefecture, 509-7203
Construction Affairs | Agricultural Land Development Division, Planning and Coordination Section, Ena Regional Forest Office, Gifu Prefecture | 0573-26-1111 (Ext. 293) | 2nd Floor, Gifu Prefectural Ena General Government Building, 1067-71 Masago Goda, Nagashima-cho, Ena City, Gifu Prefecture, 509-7203
4. Bidding Schedule and Procedures
Procedure | Period/Date | Method/Location
---|---|---
Design Document Viewing | August 10, Reiwa 8 (Monday) 9:00 AM to September 1, Reiwa 8 (Tuesday) 4:00 PM | Download from Electronic Bidding System, etc. Also available for viewing at the Bidding Affairs Department.
Question Submission | August 10, Reiwa 8 (Monday) 9:00 AM to August 25, Reiwa 8 (Tuesday) 4:00 PM | Via Electronic Bidding System. For paper bidders, submit in person to the Bidding Affairs Department.
Answer Document Viewing | August 10, Reiwa 8 (Monday) 9:00 AM to September 1, Reiwa 8 (Tuesday) 4:00 PM | Via Electronic Bidding System. Also available for viewing at the Bidding Affairs Department.
Application Submission | August 10, Reiwa 8 (Monday) 9:00 AM to August 18, Reiwa 8 (Tuesday) 4:00 PM | Via Electronic Bidding System. For paper bidders, submit in person to the Bidding Affairs Department.
Bid Participation Notification | By August 20, Reiwa 8 (Thursday) | Via Electronic Bidding System.
Bid Form Submission | August 31, Reiwa 8 (Monday) 9:00 AM to September 1, Reiwa 8 (Tuesday) 4:00 PM | Via Electronic Bidding System.
Bid Opening | September 2, Reiwa 8 (Wednesday) 9:00 AM | Via Electronic Bidding System. Ena Regional Forest Office, 2nd Floor, Gifu Prefectural Ena General Government Building.
Confirmation Document Submission (Successful Bidder Candidate Only) | September 2, Reiwa 8 (Wednesday) 1:00 PM to September 3, Reiwa 8 (Thursday) 4:00 PM (However, this does not apply if separate submission instructions are given) | Submit in person to the Bidding Affairs Department.
Complaint Filing | Within 7 days from the notification date of the Bidding Participation Notification or Bidding Eligibility Disqualification Notification (excluding prefectural holidays) | Submit in person to the Bidding Affairs Department (written form, free format).
Response to Complaint | Within 10 days from the day after the final day for filing a complaint (excluding prefectural holidays), in principle | Reply in writing.
Publication of Bid Results | Date of successful bid determination | Via Bid Information Service or Prefectural Website. Also available for viewing at the Bidding Affairs Department.
*) For paper bidders, submission in person is permitted, but submission by mail or electronic transmission will not be accepted (period and dates are the same).
Note) Submission documents are described in "Form No. 1 Tender Announcement Common Matters [Post-Qualification Type]".
5. Matters Concerning Comprehensive Evaluation Bidding Method
(1) Mechanism of Comprehensive Evaluation Bidding Method:
This construction work will determine the successful bidder using the following comprehensive evaluation bidding method:
① Bidders who meet the bidding eligibility requirements will be awarded 100 standard points.
② Up to 17.5 additional points will be awarded based on experience and other factors presented in the technical documents.
③ The successful bidder will be determined using the "evaluation value" calculated by dividing the sum of the awarded standard points and additional points by the bidder's bid price.
The outline is shown below, but specific technical requirements and bidding evaluation criteria are clearly stated in the attached "Comprehensive Evaluation Bidding Method Details."
(2) Evaluation Items:
Evaluation Items: The following items will be evaluated:
(a) Matters related to corporate capability
(b) Matters related to the capability of the assigned technician
(c) Matters related to regional requirements
Attached: Comprehensive Evaluation Bidding Method Details (Rural Development Type)
1. Mechanism of Comprehensive Evaluation Bidding Method
① The mechanism of the comprehensive evaluation bidding method is shown below.
Standard Points + Additional Points = 117.5 points
Standard Points = 100 points
0 × C ◎ A ○ B
Evaluation Value → × D ← Standard Evaluation Value
Bid Price
Estimated Price
A: Successful bidder
◎ B: Non-successful bidder (evaluation value exceeds the standard evaluation value but the slope of the evaluation value is lower than A)
○ C: Non-successful bidder (exceeds estimated price)
× D: Non-successful bidder (below standard evaluation value)
② Method of Determining Successful Bidder:
The following conditions must be met:
a. Bid Price ≤ Estimated Price
b. Minimum required conditions (standard proposal conditions) must be met (Standard points or more).
c. Evaluation Value ≥ Standard Evaluation Value (If a and b are met, c will be automatically met).
*If there are two or more bidders who meet the winning conditions, the bidder with the highest evaluation value will be the successful bidder. If the evaluation values are also the same, the successful bidder will be determined by lottery.
2. Evaluation Items and Evaluation Indicators
① Evaluation Items:
(a) Matters related to corporate capability
(b) Matters related to the capability of the assigned technician
(c) Matters related to regional requirements
② Evaluation Indicators:
(a) Evaluation based on construction performance evaluation scores, experience in similar/related construction work, and human resource development initiatives.
(b) Evaluation based on experience in similar/related construction work.
(c) Evaluation based on business location, participation in disaster agreements, participation in epidemic prevention agreements, volunteer activities, volunteer activities (land improvement facilities related), agricultural participation, construction experience in neighboring areas, snow removal work experience (applicable to civil engineering work, etc.), road maintenance work experience during holidays and nights (applicable to civil engineering work, etc.), river/sabo maintenance work experience during holidays and nights (applicable to civil engineering work, etc.), and utilization rate of local companies (applicable to civil engineering work, etc.).
3. Standard Points and Additional Points
① Standard Points: If the standard proposal conditions are met, 100 standard points will be awarded.
② Additional Points: Points will be awarded according to the evaluation criteria.
4. Awarding of Additional Points
The approach to awarding additional points to bidders is shown in the table below.