Contract No. 456 (Supplementary) Higashi Park Development (Civil Engineering) Work
Form No. 1 (Related to Article 5)
Ogaki City Public Announcement No. 254
October 28, Reiwa 8
Mayor of Ogaki City, Hitoshi Ishida
Specifications Number:
Work Responsible Section: Park and Greenery Section
Work Name:
Work Location: Within Midori-en, Ogaki City
Construction Period: From the date of contract until
Estimated Price (including consumption tax and local consumption tax):
Industry: Construction Industry
Construction Business License: Civil Engineering Contractor
Comprehensive Score: 920 points or more
Average Annual Completed Construction Value: Estimated price or more
Chief Engineer or Supervising Engineer:
Period:
Location:
Comprehensive Evaluation and Winning Bid System
Post-qualification Conditional Open Competitive Bidding will be conducted as follows, and public notice is hereby given in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act Enforcement Regulations.
Implementation of Comprehensive Evaluation and Winning Bid System, Post-qualification Conditional Open Competitive Bidding [Weekend Work]
However, if the construction performance evaluation score is less than 65 points, the construction record will not be recognized.
Qualifications and Conditions Required for Bid Participation
Construction Record: Within the past 15 years, have experience as the prime contractor in civil engineering construction work of 70,000 thousand yen or more ordered by a public authority (including JV).
Can assign an engineer who meets the requirements of Article 26 of the Construction Industry Act and has at least 3 years of practical experience in general civil engineering work.
From the date of announcement until the day before the bid opening (excluding Saturdays, Sundays, and public holidays)
Ogaki City Website, Electronic Bidding System
Viewing of Design Documents, etc.
Specific Construction Contractor
(6) If the company has filed for commencement of rehabilitation proceedings under Article 17, Paragraph 1 or 2 of the Company Rehabilitation Act (Act No. 154 of 2002) (including rehabilitation cases where the former provisions still apply pursuant to Article 2 of the Supplementary Provisions), a decision to approve the rehabilitation plan under Article 199, Paragraph 1 or 2, or Article 200, Paragraph 1 of the same Act (including rehabilitation cases where the former provisions still apply pursuant to Article 2 of the Supplementary Provisions) has been received.
Water play area: N=1 location
145,491,500 yen
Management facility construction: Drainage ditch L=202.5m
*Comprehensive evaluation score (objective points) and subjective points total
Regional Requirements:
(4) Not subject to bid participation suspension measures under the "Regulations on Measures to Exclude Violent Groups from Contracts and Subsidies Provided by Ogaki City" from the day before the announcement to the bid date.
(5) If the company has filed for commencement of rehabilitation proceedings under Article 17, Paragraph 1 or 2 of the Company Rehabilitation Act (Act No. 154 of 2002) (including rehabilitation cases where the former provisions still apply pursuant to Article 2 of the Supplementary Provisions), a decision to approve the rehabilitation plan under Article 199, Paragraph 1 or 2, or Article 200, Paragraph 1 of the same Act (including rehabilitation cases where the former provisions still apply pursuant to Article 2 of the Supplementary Provisions) has been received.
Drainage inlet: N=15 units
Box culvert: L=8.0m
Rest facility construction: Bench N=7 units
Site preparation: 1 Lot
Park path and plaza construction: Permeable As pavement A=2,230.3m2, Spray As pavement A=649.2m2, Interlocking pavement A A=427.3m2, Interlocking pavement B A=609.7m2, Pergola N=1 unit
Play facility construction: Athletic playground equipment N=4 units
Common Matters:
(3) Not subject to qualification suspension measures under the "Regulations on Suspension of Bidding Qualifications in Ogaki City" from the day of announcement to the bid date.
(7) Not subject to the provisions of Article 8 of the Construction Industry Act (Act No. 100 of 1949).
(8) No capital or personnel relationship between bidders.
General Civil Engineering Work 1/2
Bidding Method:
Period:
Submission Documents:
Period:
Submission Documents:
Application Period:
Submission Method:
Response Period:
Submission Documents:
Instructions:
Investigation Standard Price: Yes
Disqualification Criteria: Yes
Bid Withdrawal:
Dietary Resolution: No
Site Briefing Session: No
Date and Time: November 24, Reiwa 8 (Tuesday)
Location: Ogaki City Hall, 3rd Floor
Bid Bond: Exempt
Contract Bond: As stipulated in the Ogaki City Contract Regulations
Advance Payment: Yes
Other:
(5) In case of low-bid construction, an additional engineer shall be assigned "exclusively." The contract bond and penalty shall be "3/10" of the contract price. The advance payment shall be "2/10" of the contract price, and the interim advance payment shall be "1/10" of the contract price. Furthermore, upon completion of the work, documents certifying the payment status of subcontracted work shall be submitted to the work responsible section.
- For bid determination, the winning bid price will be the bid amount plus 10% of that amount (rounded down to the nearest yen if there are fractions of less than one yen). Therefore, bidders shall submit bids based on 100/110 of their estimated contract desired amount, regardless of whether they are taxable or non-taxable for consumption tax and local consumption tax.
- For estimated prices publicly announced in advance, re-bidding will not be conducted.
Conditional Open Competitive Bidding Application Form for Post-Qualification Review (Form No. 2) (Posted on the Electronic Bidding System / Ogaki City Website)
From 1:00 PM on November 4, Reiwa 8 (Wednesday) to 12:00 PM on November 6, Reiwa 8 (Friday)
Submit by email (keiyakuka@city.ogaki.lg.jp) and contact by phone. *Clearly state the specifications number, work name, and company name in the subject line.
Conference Room 6
From 9:00 AM
(2) The bidding qualifications of the winning bid candidate will be examined, and if confirmed to meet the requirements, that bidder will be declared the winner.
(3) The winning bid candidate must bring the following documents to the General Affairs Department Contract Management Division within 2 days (excluding Saturdays, Sundays, and public holidays) from the date of notification:
a. Application Form for Confirmation of Bidding Qualification for Conditional Open Competitive Bidding (Form No. 3)
b. Qualifications and Construction Experience of Assigned Engineer, etc. (Appendix 2)
(4) If the investigation standard price is not met, an investigation will be conducted in accordance with the "Ogaki City Low-Bid Price Investigation System Implementation Guidelines."
(5) If there are two or more bidders with the highest evaluation score, the winner will be determined by lottery.
(4) This work is subject to the weekend work system and will be carried out in accordance with the "Ogaki City Weekend Work Guidelines."
November 24, Reiwa 8 (Tuesday)
November 4, Reiwa 8 (Wednesday)
1:00 PM to 12:00 PM
Technical Document Submission Form (Form No.