Regarding the contract for the Maedanome 1 District Agricultural and Forestry Disaster Headworks Restoration Construction, Contract No. Go No Se No. 2. The contract will be concluded through the following conditional open competition tender, and an announcement is hereby made in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act (Cabinet Order No. 16 of 1947). Dated November 11, Reiwa 8 (2026). Signed by: Mayor of Goshogawara City, Takamasa Sasaki. 1. Construction subject to tender. 2. Tender participation qualifications: Applicants must meet all of the following requirements and be recognized by the Mayor as having the qualifications to participate in the tender after prior screening. (1) Not falling under the persons stipulated in Article 167-4, Paragraph 1 of the Local Autonomy Act. (2) Not being a person who cannot participate in open competition tenders as stipulated in Article 2 of the Goshogawara City Contract Administration Regulations (2005 Goshogawara City Regulations No. 53; hereinafter referred to as "Contract Administration Regulations"). (3) If the period of suspension of designation by Goshogawara City has not passed by the date of this announcement to the date of opening the bids. (4) For applicants who have filed for application of the Corporate Reorganization Act (2002 Law No. 154) or the Civil Rehabilitation Act (1999 Law No. 225), a decision to commence reorganization or rehabilitation proceedings must have been made by the court, and they must have undergone a business performance review in accordance with the provisions of the Construction Industry Act (1949 Law No. 100; hereinafter referred to as "the Act") after the decision. (1) Construction Number: Go No Se No. 2 (2) Construction Name: Maedanome 1 District Agricultural and Forestry Disaster Headworks Restoration Construction (3) Construction Location: Within Maedanome, Goshogawara City (4) Construction Deadline: March 19, Reiwa 9 (2027) (5) Type of Construction: Civil Engineering (General) (6) Construction Outline: Restoration length L=5.4m. Air mortar work: V=0.9㎥. Riprap work: N=6.0 units. Backfill concrete work: V=0.6㎥. Temporary work: complete. Snow removal work: complete. (7) Estimated Price: \5,651,000- (excluding consumption tax and local consumption tax). (8) Minimum Limit Price: To be established. (9) Contracting Department: Economic Department, Rural Development Division. (10) Method of submitting tender documents: By direct hand-delivery. (Tender documents must be submitted by attending the designated time and place and placing them in the ballot box.) 2/5 (5) Must have its head office within Goshogawara City. (6) Must have obtained a construction permit for general civil engineering work in accordance with the provisions of the Act and have undergone a business performance review in accordance with the provisions of the Act after the end of the business year immediately preceding the date of contract conclusion by 1 year and 7 months. (7) Must be able to assign technicians with qualifications etc. stipulated by the Act, who are directly and constantly employed by the tender participant, to the construction site. (8) Must be graded as C class in general civil engineering work in the list of construction contractor grades prepared in accordance with the provisions of Article 14 of the Goshogawara City Construction Contractor Work Execution Capacity Review Regulations (2005 Goshogawara City Regulations No. 144). *Grades can be confirmed by viewing the grade list on the city's website or at the Property Management Division. (9) Must have experience as the prime contractor or first subcontractor for one or more similar construction projects (general civil engineering work) with a contract amount of 5 million yen or more within 10 years prior to the submission date of the qualification review application for this tender. 3. Qualification Review, etc. (1) Applicants wishing to participate in the tender must submit one copy of each of the following documents and undergo the Mayor's review for tender participation qualifications. A. Conditional Open Competition Tender Participation Qualification Review Application B. Deployed Technician Statement C. Construction Experience Statement D. Copy of Latest Business Scale Evaluation Results Notification / Overall Evaluation Score Notification *Forms A, B, and C can be downloaded from the city's website. Documents listed in the statements must also be attached. (2) Submission Method: By hand to the Property Management Division. (3) Acceptance Period: From Wednesday, November 11, Reiwa 8 (2026) to Wednesday, November 18, Reiwa 8 (2026). Excluding closing days. (4) Hours: 9:00 AM to 12:00 PM and 1:00 PM to 4:00 PM. However, the reception hours on the last day of the acceptance period are from 9:00 AM to 12:00 PM. (5) Review Results, etc. A. The results of the qualification review will be notified to the applicant by FAX on or after November 18, Reiwa 8 (2026). B. Those deemed unqualified to participate in the tender may file an objection if they disagree with the reason. (6) Other A. Expenses related to the preparation and submission of documents shall be borne by the submitter, and submitted documents will not be returned. B. Replacement or correction of submitted documents is not permitted. The content of the submitted documents may be inquired about, and related documents may be requested separately. C. If a person recognized as qualified to participate in the tender falls under any of the following circumstances between the date of qualification and the date of bid opening, they will lose their qualification to participate and will not be able to participate in the tender. In this case, the relevant person will be notified. ① When the requirements for tender participation qualification are lost. ② When it becomes clear that false information has been recorded in the submitted documents. ③ When it is deemed significantly inappropriate to allow participation in the tender. 4. Design Documents, etc. (Specifications, Drawings, Draft Contract, etc.) (1) Inspection Period: From the date of announcement to November 26, Reiwa 8 (2026). 3/5 (2) Inspection Method: Goshogawara City website https://www.city.goshogawara.lg.jp/jouhou/nyusatsu/koukoku.html (3) Answers to Questions Regarding Design Documents, etc. A. If you have questions, please write them in the "Question and Answer Form", contact the Property Management Division by phone in advance, and submit by FAX by November 19, Reiwa 8 (2026). B. Answers will be provided to the questioner promptly by FAX. 5. Tender Withdrawal (1) If a person recognized as qualified to participate in the tender wishes to withdraw from the tender, they must submit a "Tender Withdrawal Notification" by the day before the bid opening. (2) The "Tender Withdrawal Notification" form can be downloaded from the city's website. It should be prepared and submitted by hand to the Property Management Division. 6. Construction Cost Breakdown (1) When submitting the tender document, enclose and submit a construction cost breakdown that details the cost calculation basis for the bid amount. (2) The construction cost breakdown form can be downloaded from the city's website. (3) The items listed in the construction cost breakdown shall be as stipulated in the design documents. (4) Replacement or correction of the submitted construction cost breakdown is not permitted. (5) Construction cost breakdowns that fall under any of the following will be invalid. A. Items with missing or illegible amounts, names, seals, or important characters. B. Items that differ from the specified items. C. Errors in the calculation of the construction cost breakdown. D. Items where the content is clearly unreasonable or appears to have been prepared insincerely. 7. Tender Method, etc. (1) Tender security deposit is waived. (2) The tender document form can be downloaded from the city's website. (3) The tender document must be placed in an envelope and submitted according to the instructions of the bid executor. (4) Please note that those who are late for the bid opening time will not be able to participate in the tender. (5) When bidding by proxy, a power of attorney (with the seals of the bidder and proxy affixed) must be submitted before the tender, and the tender document must be prepared in the name of the proxy and sealed with the proxy's seal. (6) For the successful bid, the amount written on the tender document plus 10% of that amount (rounded down to the nearest yen if there are fractions of less than one yen) will be the successful bid amount. Therefore, bidders must write the amount equivalent to 100/110 of their estimated contract desired amount on the tender document, regardless of whether they are a taxable or tax-exempt business for consumption tax. (7) The "Tenderer's Handbook" stipulated in Article 5 of the Contract Administration Regulations must be observed. (8) The number of tender executions will be one, limited to cases where the estimated price is publicly announced in advance; otherwise, it will be limited to two. (9) If there are no bids within the limit of the estimated price (or within the limit of the estimated price and above the minimum limit price, if a minimum limit price is set in accordance with Article 167-10, Paragraph 2 of the Local Autonomy Act), a re-tender may be held immediately. (10) Tenders will not be held if there is only one tender participant. 4/5 8. Bid Opening and Execution (1) Date and Time: Thursday, November 26, Reiwa 8 (2026), 9:00 AM. (2) Location: Goshogawara City Hall, 2nd Floor, Meeting Room 2A, 41 Aza-Bunya-machi. (3) If multiple bids are opened on the same day, the bid executor will determine the order of opening. 9. Invalid Bids The following bids will be considered invalid. (1) Bids submitted by persons who do not have tender participation qualifications. (2) Bids submitted without a construction cost breakdown, or where the total amount of the construction cost breakdown does not match the amount on the tender document. (3) Bids exceeding the estimated price, if the estimated price is publicly announced in advance. (4) Bids that violate the Tenderer's Handbook, the conditions specified in this announcement, or other tender conditions. 10. Method of Determining the Successful Bidder (1) If a minimum limit price is set, the bidder who submits the lowest bid price within the limit of the estimated price and at or above the minimum limit price will be the successful bidder. (2) If two or more bidders submit the same lowest bid price that would be the winning bid, the successful bidder will be determined by drawing lots immediately. In this case, if a bidder does not draw lots, a city employee not involved in the tender process will draw lots on their behalf. 11. Contract Conclusion (1) The successful bidder must promptly proceed to the contracting department to conclude the contract. (2) Upon concluding the contract, the successful bidder must pay a contract security deposit of 10% or more of the contract amount, or provide collateral in lieu thereof. However, the payment of the contract security deposit may be waived if any of the following apply: A. A performance guarantee insurance contract with the city as the insured has been concluded with an insurance company. B. A construction performance guarantee contract has been concluded with an insurance company commissioned by the contractor. (3) The contract must be concluded within 7 days from the date the successful bidder is determined. However, this does not apply if the successful bidder submits a written request for extension of the contract conclusion date and the Mayor approves it. (4) Notwithstanding the preceding paragraph, if the conclusion of the contract requires the approval of the assembly (for construction contracts with an estimated price of 150 million yen or more), a provisional contract shall be concluded within 7 days from the date the successful bidder is determined, and the final contract shall be concluded after obtaining the assembly's approval. (5) If the successful bidder fails to conclude the contract without justifiable reason, they may be subject to a suspension of designation. (6) If the successful bidder is subject to a suspension of designation by the city, or if facts are found to meet the conditions for suspension of designation, or if they no longer meet the conditions of this announcement before the contract is concluded, the contract may not be concluded. 12. Other (1) Inquiries regarding this announcement should be directed to the Property Management Division by phone. Phone: 0173-35-2111 ext. 2176 or 2177. 5/5 (2) Please note that applications for tender participation qualification review (including attached documents) and question/answer forms submitted by methods other than those specified in this announcement will not be accepted. (3) Notification of Events Affecting Construction Period or Contract Amount: The contractee shall, in accordance with the provisions of Article 20-2, Paragraph 2 of the Construction Industry Act (1949 Law No. 100), notify the contractor of any events that may affect the construction period or contract amount, along with information necessary to understand the situation of such events, from the determination of the contractee until the conclusion of the contract.