Okinawa Prefectural School Principal Longevity Improvement Mechanical Equipment Work (Building 11)
- 1 - SPECIAL SPECIFICATIONS 1) WORK NAME: Okinawa Prefectural School Principal Longevity Improvement Mechanical Equipment Work (Building 11) 2) WORK LOCATION: Nago City, Jyohena area 3) BUILDING SCALE: Reinforced concrete, 2 stories 4) BUILDING AREA: 325.02㎡ 5) TOTAL FLOOR AREA: 378.08㎡ 6) THIS WORK: Comprehensive mechanical equipment renovation work 7) CONSTRUCTION PERIOD: From the day after the contract is concluded until March 18, Reiwa 9 (2027) 8) WORK CLASSIFICATION: a) All renovation mechanical equipment work, and all other work indicated in the special specifications and design documents. * Temporary structures, etc., will be planned and installed by the construction cooperation association. (Supervised by the construction department) 9) INQUIRIES AND ANSWERS: Inquiries and answers regarding doubts about the content of the design documents shall be made in writing (attached documents). SUBMISSION OFFICE: Nago City Board of Education, Education Facilities Division, Construction Section (Contact: Oshiro) TEL: 0980 (53) 5441 ext. 255 FAX: 0980 (53) 5447 ACCEPTANCE METHOD: Using the attached Construction Work Content Inquiry Form DEADLINE FOR INQUIRIES: Until noon on Friday, September 25, Reiwa 8 (2026) RESPONSE TO INQUIRIES: Monday, September 28, Reiwa 8 (2026) RESPONSE METHOD: Responses will be sent to all nominated contractors via email/FAX. 10) PROGRESS MEETINGS: To be held at least once a week. (Each contractor shall prepare a weekly progress schedule and attend the progress meeting.) 11) SEPARATE WORKS AND COORDINATION WITH OTHER WORKS: The contractor shall maintain close contact and cooperate with contractors performing parallel work to ensure the complete progress of each work. A construction cooperation association shall be formed. SEPARATE WORKS: - Okinawa Prefectural School Principal Longevity Improvement Work (Building 11) - Okinawa Prefectural School Principal Longevity Improvement Electrical Equipment Work (Building 11) 12) ON-SITE PERSONNEL: The following personnel shall be stationed on site: a Site Representative: As per the construction contract provisions. (1 person) b Chief Engineer: A person holding a national qualification that allows them to be a supervising engineer or chief engineer under the Construction Industry Act (e.g., 1st or 2nd grade pipe construction management engineer, professional engineer, chief water supply installation engineer, certified skilled worker under the Human Resources Development Promotion Act, building equipment engineer, 1st grade instrumentation engineer). c Specialized Engineer: Must be able to thoroughly read design documents, create construction drawings, and supervise construction. - 2 - d Site Safety Manager: As per relevant laws and regulations. * The handling of the supervising engineer and chief engineer for this work will be discussed based on the availability of assigned engineers. 13) SAFETY MEASURES (Within the construction site and related areas): Construction traffic routes and temporary enclosures, etc., will generally be as shown in the design drawings, but sufficient consultation with the supervisor and related organizations will be conducted before construction. Adequate attention shall be paid to safety and hygiene management within and around the site. In addition to legal requirements, sufficient safety measures shall be implemented in accordance with the current situation. If instructions are given by construction personnel or third parties, immediate action shall be taken. Traffic controllers shall be assigned at the entrances and exits for construction vehicles. 14) POLLUTION PREVENTION: 1. Thorough measures shall be taken to prevent pollution. 2. Measures shall be taken to prevent the outflow of red soil, etc. 3. In case of rain, any exposed ground shall be immediately covered with blue sheets, etc. 4. During building demolition, watering shall be performed and sheeting shall be used for curing to prevent dust scattering. 15) RELEVANT LAWS: Compliance with the "Act on the Recycling of Materials in Construction Works" (Construction Recycling Act), the "Waste Management and Public Cleansing Act" (Waste Management Act), or the "Ordinance on Prevention of Disorders due to Specified Chemical Substances, etc." Construction material waste generated from this work shall be processed at a proper facility permitted by Okinawa Prefecture based on the Waste Management Act. Temporary storage outside the site is generally prohibited. For demolition work, notification under Article 5 of the Industrial Safety and Health Act shall be made. 16) PREVENTION OF SOILING OF PUBLIC ROADS AND COMMUNITY FACILITIES: All measures shall be taken to prevent soiling of public roads and community facilities, and any unforeseen events shall be dealt with immediately. 17) VARIOUS SIGNBOARDS: The following signboards shall be installed at various locations inside and outside the site: ◆ Safety signs ◆ Traffic signs ◆ Others as instructed. 18) CONSTRUCTION SIGNBOARD: Made of plywood, white background, Gothic font. The names of related contractors shall also be displayed. 19) PROCEDURES WITH GOVERNMENT AND PUBLIC OFFICES: All necessary procedures with government and public offices for this work shall be coordinated in advance and carried out without delay. 20) MATERIAL TESTING: Certificates of various material tests shall be promptly submitted to the construction supervisor. 21) INSPECTION: When undergoing inspection, the details of the inspection (classification, date, and time) shall be clearly stated in advance. The inspection shall only be conducted with the attendance of the self-construction supervisor (site representative, supervising engineer, or chief engineer). Even if the inspection passes, the contractor remains responsible for "defects." * Self-construction supervisor's inspection shall be completed in advance. 22) CONSTRUCTION PHOTOGRAPHS: a For parts where the construction object is not visible or difficult to see (e.g., underground buried objects and rebar), construction photographs shall be taken as one of the means to confirm the progress and serve as reference material for inspection judgments. Thorough quality control and clear photographic management shall be implemented. b Photographs of each process shall be in color. Photographs of the site conditions before commencement of work and completion photographs shall also be in color. - 3 - c Construction photographs shall be submitted to the supervisor monthly, attached to the daily construction report. 23) APPLICABILITY: All matters listed in these special specifications shall apply to this work. The costs for construction, maintenance, inspection, and various expenses related thereto shall all be covered within the contract amount. Although this work is generally based on these guidelines, special specifications, and drawings, anything that is naturally necessary for construction and not explicitly stated, as well as matters stipulated by laws and regulations, shall be constructed within the contract amount. 24) APPROVAL: 1. Post-construction processing will not be accepted. Requests for approval shall clearly state the content of the approval in advance, and shall be submitted with a clear statement that it conforms to the specifications or drawings. If it is clearly found that there was intentional fraud, the approval shall be invalidated even after approval. 2. All approval matters shall be processed by the middle of the construction period. All related documents for approval shall be submitted bound in A4 size on the left. 25) DESIGN CHANGES: 1. Design changes shall be performed based on the design breakdown and quantities at the design unit price. 26) COMPLETION DOCUMENTS: 1. Upon completion of the work, the contractor shall deliver the following items with the approval of the supervisor. (1) As-built drawings (Kannon-bound A1 size) ... 2 copies (2) As-built drawings (Kannon-bound A3 size) ... 2 copies (3) As-built data (as-built drawings, construction photos, etc.) ... CD in case, 2 copies (4) Construction documents shall be submitted in storage boxes. (5) Others as instructed by the supervisor. 27) OTHERS: 1. Regarding subcontracting, efforts shall be made to select subcontractors from within the city (those with their main business office in Nago City). However, if this is difficult, efforts shall be made to prioritize companies in the northern region, followed by companies within the prefecture, in lieu of city companies. 2. As this site is within the grounds of Okinawa Prefectural School, temporary construction plans shall be made and executed with consideration for the safety of children and students. 3. Regarding the Construction Recycling Act, if notification is to be made under the Recycling Act, the application shall be submitted 7 days prior to commencement. 4. Use of Prefectural Products: Materials used in this work shall be prioritized for use if they are produced or manufactured within the prefecture and are appropriate in terms of specifications, quality, and price. 5. The month for adopting design unit prices shall be Reiwa 8 (2026) July for maintenance unit prices and Reiwa 8 (2026) September for market unit prices. 6. Construction Period T is estimated at 6.1 months. (Appropriate construction period) Currently, the construction period is set from the day after the contract is concluded until March 18, Reiwa 9 (2027). If the work cannot be completed within the construction period, a carry-over procedure will be required, and the period will be extended after approval by the assembly. 7. Regarding vehicle entry points: If sidewalks, etc., are damaged due to the entry of large vehicles, the contractor shall be responsible for repairs. - 4 - (Ensure safety measures and curing are adequately performed.) Also, ensure safety when construction vehicles enter and exit, and provide traffic guidance. 28) TWO-DAY WEEKEND HOLIDAYS: In accordance with the Okinawa Prefectural Government, Department of Civil Engineering and Construction, Notice No. 411 dated June 25, Reiwa 8 (2026), "Policy on Efforts for Two-Day Weekend Holidays in Maintenance Construction." Nago City Board of Education, Education Facilities Division Mechanical Equipment Special Specifications (1) Mechanical Equipment Special Specifications (2) Mechanical Equipment Special Specifications (3) Mechanical Equipment Special Specifications (4) Reiwa 8 (2026) On-site Guide Map / Layout Drawing Basic Architectural Cross-section / Elevation Drawing Fixture / Equipment Table 1st Floor Air Conditioning and Ventilation Equipment Floor Plan 2nd Floor Air Conditioning and Ventilation Equipment Floor Plan 1st Floor Instrumentation Equipment Floor Plan 2nd Floor Instrumentation Equipment Floor Plan 1st Floor Water Supply and Drainage Equipment Floor Plan 2nd Floor Water Supply and Drainage Equipment Floor Plan R Floor Water Supply and Drainage Equipment Floor Plan Okinawa Prefectural School Principal Longevity Improvement Mechanical Equipment Work (Building 11) Drawing List Drawing Number Drawing Name SCALE Drawing Number M-04 M-01 M-02 M-03 Drawing Name SCALE M-05 M-06 M-07 A1 = 1/100 A3 = 1/200 A3 = 1/1000 A1 = 1/500 M-11 M-12 M-13 M-14 A1 = 1/50 A3 = 1/100 A1 = 1/50 A3 = 1/100 A1 = 1/50 A3 = 1/100 A1 = 1/50 A3 = 1/100 M-08 M-09 M-10 A3 = 1/100 A1 = 1/50 A3 = 1/100 A1 = 1/50 A3 = 1/100 A1 = 1/50 Approval Summary Ordering Organization Work Location Work Name Design Drafted Management Architect Nago City Board of Education, Education Facilities Division Drawing Number Scale Drawing Name Work Year (Stock Company) Daisho Sekkei Name Designer Qualified Person Name Registration Number Location Oshiro Sho, Class 1 Architect No. 177449 Nago City, Okinawa Prefecture, Umoza-no-mori 1-15-12 Mechanical Equipment Special Specifications (1) Nago City, Jyohena area M-01 Reiwa 8 (2026) Okinawa Prefectural School Principal Longevity Improvement Mechanical Equipment Work (Building 11) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ 2 Design Period for this Work 3 Mechanical Equipment Work Specifications (1) Standard Specifications, etc. a) For matters not described in the drawings and these special specifications, refer to the "Standard Specifications for Government Buildings (Mechanical Equipment Work)" (Reiwa 7 Edition) and "Standard Specifications for Renovation of Public Buildings (Mechanical Work)" (Reiwa 7 Edition) and "Standard Drawings for Public Building Equipment Work (Mechanical Work)" (Reiwa 7 Edition) established by the Minister's Secretariat, Government Buildings Department, Ministry of Land, Infrastructure, Transport and Tourism (hereinafter referred to as "Standard Specifications"). b) If architectural work is included in this work, the architectural work shall be in accordance with the "Standard Specifications for Public Architectural Work (Architectural Work)" (Reiwa 7 Edition) and "Standard Specifications for Renovation of Public Buildings (Architectural Work)" (Reiwa 7 Edition). (2) Special Specifications a) Special items marked with "○" will be applied. b) Items selected from the special items marked with "・" or "※" will be applied. However, if both "・" and "※" are marked with "○", both will be applied. c) The item numbers in parentheses ( ) within the items describe the corresponding items in the standard specifications for reference. 4) Others (1) Cooperation with Public Works Labor Cost Survey a) If this work is selected for the Public Works Labor Cost Survey, the contractor shall accurately fill in and submit the necessary information on the survey form, etc. b) If the business office that submitted the survey form is visited for post-survey investigation and guidance, the contractor shall cooperate with the implementation. This also applies after the completion of this work. c) In order to accurately submit the survey form when this work is selected for the Public Works Labor Cost Survey, the contractor shall create and preserve employment rules and wage ledgers in accordance with the Labor Standards Act, etc., and shall properly manage the wages and working hours of the site workers employed on a daily basis. d) If a subcontract is concluded for a part of this work, the subcontractor (including subsequent subcontractors for a part of the subcontracted work) shall be obligated to comply with the same obligations as stated in a) through c). (2) Measures to Eliminate Unjust Intervention by Boryokudan (Violent Groups), etc. The contractor shall comply with the following provisions based on the "Agreement on Procedures for Eliminating Unjust Intervention by Boryokudan, etc., in Public Works Contracts Awarded by the Okinawa Prefectural Government, Department of Civil Engineering and Construction" (July 24, Reiwa 19): In case of violation, strict measures such as suspension of designation will be taken. a) If unjust demands are received from Boryokudan members, etc., they shall be firmly refused, reported to the supervisor promptly, and a report of damage shall be filed with the local police station, and necessary cooperation shall be provided for the investigation. b) If damage or obstruction of work is caused by unjust demands from Boryokudan members, etc., the supervisor shall be promptly reported to, and a report of damage shall be filed with the local police station. c) If there is a risk of delay in the work despite measures taken to exclude Boryokudan members, etc., the contractor shall promptly consult with the supervisor regarding the schedule. (3) Weekly Stance Implementation For the construction site environment, confirm and adjust the implementation details in item 3 of the "Weekly Stance Implementation Guidelines" during the initial meeting. The implementation details shall be recorded in the meeting minutes and shared with the contractor. Refer to the Okinawa Prefectural Government, Department of Technology and Construction Industry website (address below) for the guidelines. https://www.pref.okinawa.lg.jp/site/doboku/gijiken/kenkeitosyo.html (4) Cooperation with Construction Supervision Work, etc. a) Construction supervision work (work that constitutes construction supervision as defined in Article 2, Paragraph 8, and Article 18, Paragraph 3 of the Building Officials Act, based on a commissioned contract for construction supervision work. The same applies hereinafter.) will be commissioned under a separate contract, and the site representative, etc., for this work shall cooperate with the performance of said construction supervision work. b) The names of the management engineers, chief engineers, and engineers assigned by the contractor for construction supervision work (hereinafter referred to as "management engineers, etc.") will be notified by the ordering party. Management engineers, etc., do not have the authority to give instructions, receive approvals, or negotiate regarding this work. c) Documents that are to be submitted to the supervisor according to the design documents shall generally be submitted to the management engineers, etc. d) Documents for reporting on construction supervision pursuant to Article 23-2 of the Construction Industry Act shall be submitted to the supervisor.