Tenders/Design Work for Toilet Renovation at Suita City Furue Dai Junior High School and 1 Elementary School (PDF 244.3 KB)
Open🇯🇵JapanWorks

Design Work for Toilet Renovation at Suita City Furue Dai Junior High School and 1 Elementary School (PDF 244.3 KB)

Auto-translated from Japanese
Original title: 吹田市立古江台中学校ほか1校小学校1校トイレリニューアル工事設計業務 (PDF 244.3 KB)
大阪府吹田市
Published: Jul 2, 2026
Updated: Jul 29, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the education and training and architecture and engineering sectors, with a focus on Architectural Design, Primary Education, Secondary Education and Education Infrastructure. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the education and training sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese

Design Work for Toilet Renovation at Suita City Furue Dai Junior High School and 1 Elementary School (PDF 244.3 KB)
1 Suita City Announcement No. 392 We hereby announce that an electronic bidding general competitive tender for the design work for toilet renovation at Suita City Furue Dai Junior High School and 1 Elementary School will be conducted as follows, in accordance with the provisions of Article 167-6 of the Local Autonomy Act (Showa 22, Cabinet Order No. 16).
July 2, Reiwa 8 (2026) Signed by Keiji Goto, Mayor of Suita City Outline of Restricted General Competitive Bidding 1 Work Name Design Work for Toilet Renovation at Suita City Furue Dai Junior High School and 1 Elementary School 2 Location of Work 1-1-1 Furue Dai, Suita City, etc. 3 Performance Period August 17, Reiwa 8 (2026) - February 12, Reiwa 9 (2027) *The start of the performance period is the contract date.
4 Type of Work Architectural Design 5 Outline of Work Detailed Design, complete 6 Building Overview (1) Suita City Furue Dai Junior High School [① System] A Structure and number of floors: Reinforced concrete, 2 stories above ground B Renovation area: 32 sqm x 2 locations C Completion year: Showa 47 (1972) [② System] A Structure and number of floors: Reinforced concrete, 2 stories above ground B Renovation area: 32 sqm x 2 locations C Completion year: Showa 47 (1972) [③ System] A Structure and number of floors: Reinforced concrete, 2 stories above ground B Renovation area: 32 sqm x 2 locations C Completion year: Showa 47 (1972) [High-spec toilet] A Structure and number of floors: Reinforced concrete, 4 stories above ground B Renovation area: 31 sqm x 2 locations C Completion year: Showa 48 (1973) 2 [Wheelchair accessible toilet] A Structure and number of floors: Reinforced concrete, 1 story above ground B Renovation area: 7 sqm C Completion year: Heisei 8 (1996) [Pool toilet] A Structure and number of floors: Reinforced concrete block, 1 story above ground B Renovation area: 79 sqm C Completion year: Showa 56 (1981) [Outdoor toilet ①] A Structure and number of floors: Reinforced concrete, 1 story above ground B Renovation area: 25 sqm C Completion year: Showa 47 (1972) [Outdoor toilet ②] A Structure and number of floors: Reinforced concrete block, 1 story above ground B Renovation area: 13 sqm C Completion year: Around Showa 64 (1989) (2) Suita City Daiichi Junior High School [① System] A Structure and number of floors: Reinforced concrete, 3 stories above ground B Renovation area: 22 sqm x 3 locations C Completion year: Showa 39 (1964) [② System] A Structure and number of floors: Reinforced concrete, 4 stories above ground B Renovation area: 33 sqm x 1 location and 63 sqm x 1 location C Completion year: Showa 39 (1964) [High-spec toilet ①] A Structure and number of floors: Reinforced concrete, 4 stories above ground B Renovation area: 33 sqm C Completion year: Showa 39 (1964) [High-spec toilet ②] A Structure and number of floors: Reinforced concrete, 4 stories above ground B Renovation area: 34 sqm C Completion year: Showa 50 (1975) [Wheelchair accessible toilet] A Structure and number of floors: Reinforced concrete, 1 story above ground B Renovation area: 7 sqm 3 C Completion year: Heisei 12 (2000) [Support classroom toilet] A Structure and number of floors: Reinforced concrete block, 1 story above ground B Renovation area: 8 sqm C Completion year: Showa 52 (1977) (3) Suita City Senri Takemi Elementary School [① System] A Structure and number of floors: Reinforced concrete, 3 stories above ground B Renovation area: 37 sqm x 2 locations C Completion year: Showa 42 (1967) [② System] A Structure and number of floors: Reinforced concrete, 3 stories above ground B Renovation area: 29 sqm x 3 locations C Completion year: Showa 53 (1978) [High-spec toilet] A Structure and number of floors: Reinforced concrete, 3 stories above ground B Renovation area: 37 sqm x 2 locations C Completion year: Showa 42 (1967) [Wheelchair accessible toilet] A Structure and number of floors: Reinforced concrete, 1 story above ground B Renovation area: 7 sqm C Completion year: Heisei 8 (1996) [Pool toilet] A Structure and number of floors: Reinforced concrete block, 1 story above ground B Renovation area: 47 sqm C Completion year: Showa 53 (1978) [Outdoor toilet ①] A Structure and number of floors: Reinforced concrete block, 1 story above ground B Renovation area: 11 sqm C Completion year: Showa 55 (1980) [Outdoor toilet ②] A Structure and number of floors: Reinforced concrete block, 1 story above ground B Renovation area: 11 sqm C Completion year: Showa 55 (1980) [Indoor gymnasium toilet] A Structure and number of floors: Reinforced concrete, 2 stories above ground 4 B Renovation area: 15 sqm C Completion year: Showa 45 (1970) [Canteen staff toilet] A Structure and number of floors: Reinforced concrete, 2 stories above ground B Renovation area: 2 sqm x 2 locations C Completion year: Showa 42 (1967) 7 Estimated Price: 28,183,000 yen (excluding tax) 8 Minimum Reserve Price: To be announced after the fact.
9 Number of Bids: 1 10 Bid Security: Exempted in accordance with the provisions of Article 98 of the Suita City Financial Regulations.
11 Contract Security: 10% or more of the contract amount *Please make necessary preparations for contract security to be valid on the contract date.
12 Payment Terms (1) Advance Payment: Yes (up to 30% of the contract amount) (2) Partial Payment: None 13 Bid Participation Qualifications Must satisfy all of the following requirements.
Please utilize the checklist for required technicians attached to this design in the electronic bidding system.
(1) Must satisfy all qualification requirements specified in the Suita City Restricted General Competitive Bidding Common Bidding Explanation (hereinafter referred to as "Common Bidding Explanation").
(2) Must be registered as a city contractor (meaning a contractor registered with the city's Qualified Contractor List (hereinafter referred to as "Qualified Contractor List") with a head office in the city) or a quasi-city contractor (meaning a contractor registered with the city's Qualified Contractor List with a branch office in the city) in the city's Qualified Contractor List (Design, Supervision, Geological Survey, Survey, etc. Work Consignment Department), and the desired work type must be the same as this project.
If registered as any other type of contractor, the first desired work type must be the same as this project.
(3) Must have been registered in the city's Qualified Contractor List (Design, Supervision, Geological Survey, Survey, etc. Work Consignment Department) for more than one year as of the announcement date.
However, for city contractors or quasi-city contractors, they must have been registered as city contractors or quasi-city contractors in the city's Qualified Contractor List (Design, Supervision, Geological Survey, Survey, etc. Work Consignment Department) for more than one year as of the announcement date.
(4) Must be registered as a Class 1 Architect Office in accordance with Article 23 of the Building Standards Act.
(5) Must have the following business experience.
Must have experience as the prime contractor in performing detailed design of buildings (new construction, extension, or renovation work with a floor area of 284 sqm or more for the extended or renovated portion) ordered by public institutions (national government, local governments, public corporations listed in Table 1 of the Corporation Tax Act, or corporations specified in Article 18 of the Enforcement Regulations of the Construction Industry Act; hereinafter the same) (completion and delivery must be completed from Heisei 28 (2016) to the Final Application Date).
(This may be for a different project than the business experience in (5).)
(6) Must be able to assign a management technician who is directly employed and meets the following A and B.
(Must have been employed for 3 months or more prior to the Final Application Date. Employees seconded from other companies or dispatched workers are not permitted.) A Must have experience in performing detailed design of buildings (new construction, extension, or renovation work with a floor area of 284 sqm or more for the extended or renovated portion) ordered by public institutions (completion and delivery must be completed from Heisei 28 (2016) to the Final Application Date).
(This may be for a different project than the business experience in (5).)
B Must be a Class 1 Architect as defined by the Building Standards Act.
(7) Must be able to assign architectural (design) technicians who meet the following A and B.
A Must have experience in performing detailed design of buildings (new construction, extension, or renovation work with a floor area of 189 sqm or more for the extended or renovated portion) ordered by public institutions (completion and delivery must be completed from Heisei 28 (2016) to the Final Application Date).
(This may be for a different project than the business experience in (5).)
B Must be a Class 1 or Class 2 Architect as defined by the Building Standards Act.
(8) Must be able to assign electrical equipment technicians and mechanical equipment technicians who meet the following requirements.
Must have experience in performing detailed design of buildings (new construction, extension, or renovation work with a floor area of 189 sqm or more for the extended or renovated portion) ordered by public institutions (completion and delivery must be completed from Heisei 28 (2016) to the Final Application Date).
(This may be for a different project than the business experience in (5).)
(9) Must have submitted fewer than 2 bids (including successful bid candidates) for electronic bidding projects in the same industry announced by the city (Contract and Inspection Office, General Affairs Department) in Reiwa 8 (2026) as of the determination of the successful bid candidate for this project.
For city contractors and quasi-city contractors, the limit is 3 bids.
However, projects excluded from the bid application/contract number restrictions are excluded.
(10) If qualifications and experience are met, management technicians and担当 technicians, or担当 technicians may concurrently hold multiple positions.
14 Invalid Bids Bids submitted by those who do not meet the bid participation qualifications specified in the preceding paragraph or who have made false applications will be deemed invalid.
Furthermore, bids submitted by those who are no longer qualified at the time of bidding, even if they were confirmed as qualified by the city, will be deemed invalid.
15 Bid Participation Qualification Confirmation Application and Results (1) Application Acceptance Period 6 From 9:00 AM on Friday, July 3, Reiwa 8 (2026) to 5:00 PM on Friday, July 17, Reiwa 8 (2026) during system operating hours (2) Results Notification Date: Tuesday, July 21, Reiwa 8 (2026) 16 Delivery Method for Design Documents: Download from the system.
17 Inquiries and Responses (1) Inquiry Acceptance Deadline: 5:00 PM on Wednesday, July 8, Reiwa 8 (2026) (2) Response Publication Start Date: 3:00 PM on Tuesday, July 14, Reiwa 8 (2026) 18 Submission and Opening of Bids (1) Bid Submission Period: From 9:00 AM on Wednesday, July 29, Reiwa 8 (2026) to 5:00 PM on Thursday, July 30, Reiwa 8 (2026) during system operating hours (2) Bid Opening Date and Time: From 9:30 AM on Friday, July 31, Reiwa 8 (2026) onwards (Bid opening will be conducted in order of announcement number.) 19 Post-Bid Review: The city will contact the successful bid candidate regarding the post-bid review. The following supporting documents should be sent as electronic files (PDF format) to the email address in (3).
After confirming the electronic files, the city will contact you. Documents requiring a seal must be submitted in original form by mail or in person to the Contract and Inspection Office.
(1) Submission Date and Time: Friday, July 31, Reiwa 8 (2026) *The time for submitting electronic files will be notified by the city to the successful bid candidate.
(2) Documents to be Submitted: A Documents related to the management technician (A) Documents confirming direct employment (B) Copy of qualification certificate (C) Documents confirming compliance with 13 Bid Participation Qualifications (6) A B Documents related to the assigned technician (A) Documents confirming compliance with 13 Bid Participation Qualifications (7) A and (8) (B) Copy of qualification certificate (architectural technician only) C Other related documents (A) Technician roster (B) Documents confirming prime contractor experience that meets the requirements in 13 Bid Participation Qualifications (5) (copies of contract, design specifications, TECRIS work record card, etc.) (C) Documents confirming registration as a Class 1 Architect Office (copy of architect office registration certificate, etc.) (D) Sworn statement declaring that the applicant is not a gangster or a person closely related to gangsters as stipulated in Article 8, Paragraph 2 of the Suita City Ordinance on the Exclusion of Gangsters, etc. (3) Email Address: Suita City General Affairs Department Contract and Inspection Office keiyak_s@city.suita.osaka.jp 20 Other: Bidders must approve the contents of the "Common Bidding Explanation" attached to the system, in addition to these guidelines, before bidding.
21 Contact Information: 1-3-40 Izumi-cho, Suita City, Suita City General Affairs Department Contract and Inspection Office Phone (Direct) 06-6384-1489

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on July 2, 2026. Last refreshed 9 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 大阪府吹田市

大阪府吹田市 has issued 169 procurement notices on BidsFactory, including 20 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Education & Training, and Architecture & Engineering Services. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 6, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by 大阪府吹田市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Education & Training sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

大阪府吹田市
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.