Bid Announcement (Services)
We will conduct a general competitive bid (non-government procurement target) as follows. This service utilizes an information sharing system between the contractor and the contracting authority. This service is a trial project for the electronic contract system.
August 21, Reiwa 8
Authorized Signatory for Expenditure Authorization, Rumoi Southern Forest Management Office Chief, Iwao Kajimura
1. Service Overview
(1) Service Name: 1192 Forest Stand Erosion Control Construction Implementation Survey and Design Services (Electronic Bidding Target Project) (Electronic Contract Trial Project)
(2) Service Location: Rumoi District, Obira Town, National Forest 1192 Forest Stand, Hokkaido
(3) Service Content: Implementation survey and design for 1 erosion control structure, 0.02 ha.
(4) Performance Period: From the day after the contract conclusion date until February 5, Reiwa 9.
(5) This service is subject to electronic bidding through the electronic bidding system. However, if it is difficult to use the electronic bidding system, paper bidding may be substituted with the approval of the contracting authority.
(6) This service is a trial project for the electronic contract system for the exchange of documents related to contract procedures. If it is difficult to use the electronic contract system, paper contract method may be substituted with the approval of the contracting authority.
(6) If the estimated price exceeds 10 million yen, and the price of the intended successful bidder falls below the price based on the standards stipulated in Article 85 of the Budget, Settlement, and Accounting Act (Showa 22, Government Ordinance No. 165; hereinafter referred to as "the Budget Act") (hereinafter referred to as "benchmark price for low-bid price investigation"), an investigation will be conducted in accordance with Article 86 of the same Act.
(7) If the estimated price is between 1 million yen and 10 million yen, and the bid price falls below the price determined by the Rumoi Southern Forest Management Office Chief for ensuring service quality (hereinafter referred to as "quality assurance benchmark price"), the contractor will be required to perform certain services.
(8) Since the results of this service can vary significantly compared to the procurement price due to the specialized knowledge, technology, and creativity proposed by the bidder, this service will be awarded based on a comprehensive evaluation of non-price factors and price, including technical proposals regarding the service implementation policy.
(9) This service provides additional points in the comprehensive evaluation for companies that implement wage increases.
(10) For services falling under (6) or (7), to ensure the reliable implementation of technical proposals, the reliability of technical proposal implementation will also be evaluated.
2. Competitive Bidding Qualifications
(1) Not a party falling under the provisions of Articles 70 and 71 of the Budget Act. Minors, persons under guardianship, or persons under assistance who have obtained the necessary consent for contract conclusion are considered to fall under special circumstances in Article 70 of the Budget Act.
(2) Must have received certification for general competitive bidding qualifications of Grade B, A, or C for survey and consulting services from the Hokkaido Regional Forest Office for Reiwa 7/8. (Companies that have filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act (Reiwa 14, Law No. 154) or commencement of rehabilitation proceedings under the Civil Rehabilitation Act (Reiwa 11, Law No. 225) must have received a re-determination of general competitive bidding qualifications based on procedures separately determined by the Director-General of the Hokkaido Regional Forest Office after the decision to commence proceedings).
(3) Must be registered in forest civil engineering in accordance with the Construction Consultant Registration Regulations.
(4) Must not be a party that has filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act or commencement of rehabilitation proceedings under the Civil Rehabilitation Act (excluding those who have received re-determination as per (2) above).
(5) Must have experience as the prime contractor in similar services with a contract amount of 1 million yen or more, conducted within the 15-year period from April 1, Reiwa 23 to March 31, Reiwa 8. If the record of similar services is for services commissioned by the Director-General of Forestry and Paper Industry, Director of Forestry Technology Research Center, Director of Regional Forest Office, Director of Forest Management Office, Director of Forest Management Sub-office, Director of Forest Management Branch Office, Director of Erosion Control Center, or Director of Comprehensive Erosion Control Project Office (hereinafter referred to as "Director of Regional Forest Office, etc."), and if service performance evaluations have been conducted, bids from those with a service performance evaluation score of less than 60 points in the service performance evaluation table stipulated in Article 4, Item 3 of the "Service Performance Evaluation Guidelines for Survey and Other Services Related to Construction Work in National Forest Business" (Notification No. 21 Lin Guo Guan No. 106 from the Director-General of the Forestry Agency, March 18, Reiwa 22) will be excluded. Similar services: Survey, survey, and design services for erosion control projects.
(6) If there is experience in similar services commissioned by the Director of the Hokkaido Regional Forest Office, etc., completed within the three years from April 1, Reiwa 5 to March 31, Reiwa 8, and if service performance evaluations have been conducted, the average service performance evaluation score (including 60 points or less) must be 60 points or higher.
(7) The technical proposal for the service must be appropriate. If no technical proposal is submitted, or if the proposal content is barely described and cannot be judged, and it is determined that the service cannot be performed properly, competitive participation will not be granted.
(8) Must be able to assign a management engineer and a review engineer who meet the following criteria to the service.
- 3 -
Note: The management engineer and review engineer cannot be the same person.
① Must be a registered professional engineer under Article 32, Paragraph 1 of the Professional Engineer Act (Showa 58, Law No. 25) (limited to registration in the Forestry Department (Forestry Civil Engineering) or General Technology Management Department (Forestry Civil Engineering)), possess a Ph.D. (in a department corresponding to Forestry Civil Engineering), be a Civil Engineering Consultant Manager (limited to registration in the Forestry Department (Forestry Civil Engineering)), or a Forestry Engineer (Forestry Civil Engineering), or meet one of the following criteria:
・ Graduated from a university (excluding junior colleges as defined in Article 108, Paragraph 2 of the School Education Act (Showa 22, Law No. 26)) or a university under the former University Ordinance (Taisho 7, Imperial Ordinance No. 388) with a course in forestry or civil engineering, and have worked in the forestry civil engineering field for 18 years or more after graduation.
・ Graduated from a junior college, college of technology, or vocational school under the former Vocational School Ordinance (Meiji 36, Imperial Ordinance No. 61) with a course in forestry or civil engineering, and have worked in the forestry civil engineering field for 23 years or more after graduation.
・ Graduated from a high school or secondary school under the former Secondary School Ordinance (Showa 18, Imperial Ordinance No. 36) or equivalent, possessing knowledge and skills in forestry or civil engineering, and have worked in the forestry civil engineering field for 28 years or more after graduation (including equivalent qualifications).
② Must have experience as a management engineer, review engineer, or担当技術者 (assigned engineer) in similar services commissioned by the Director of Regional Forest Office, etc., as listed in (5) above, during the 15-year period from April 1, Reiwa 23 to March 31, Reiwa 8. If the service performance evaluation score for the service, the technical engineer performance evaluation score for the management engineer, and the technical engineer performance evaluation score for the review engineer are less than 60 points for similar services commissioned by the Director of Regional Forest Office, etc., where service performance evaluations are conducted, such experience will not be recognized.
(9) Must not be subject to designation suspension under the "Rules on Measures such as Designation Suspension for Construction Contracts, etc." (Showa 59, June 11, Lin Ye Jing No. 156 Notification from the Director-General of the Forestry Agency; hereinafter referred to as "Rules on Designation Suspension for Construction Contracts, etc.") by the Director-General of the Hokkaido Regional Forest Office during the period from the deadline for submitting the application form, confirmation documents, and technical proposal to the bid opening time.
(10) Must have headquarters, branches, or business offices within the jurisdiction of the Hokkaido Regional Forest Office.
(11) There must be no capital or personnel relationships between bidders (refer to bid explanation).
(12) In accordance with the "Promotion of Exclusion of Violent Groups from Contracts by the Ministry of Agriculture, Forestry and Fisheries" (December 7, Reiwa 19, Minister's Secretariat, Accounting Division Director Notification No. 1314), must not be a business operator whose management is substantially controlled by a member of a violent group or equivalent, as requested by the police authorities for exclusion from contracts by the Ministry of Agriculture, Forestry and Fisheries, and must not be in such a state.
3. Confirmation of Competitive Bidding Qualifications, etc.
(1) Applicants wishing to participate in this competition must submit an application form, confirmation documents, and a technical proposal in accordance with the following to obtain confirmation from the authorized signatory for expenditure authorization, etc., regarding their competitive bidding qualifications.
- 4 -
In addition, the technical proposal must include the following items:
① Service implementation system
② Experience and capabilities of the planned management engineer
③ Company's track record, capabilities, and reliability
④ Service implementation policy, etc.
⑤ Technical proposal (Specific theme: Selection and examination methods for erosion control structures and construction methods)
(2) Submission Period, Location, and Method for Application Form, Confirmation Documents, and Technical Proposal:
① Submission Period: August 24, Reiwa 8 to September 4, Reiwa 8 (excluding holidays as defined in Article 1, Paragraph 1 of the Administrative Holidays Act (Showa 63, Law No. 91)) from 9:00 AM to 5:00 PM (excluding 12:00 PM to 1:00 PM). Please submit the application form and confirmation documents as early as possible within the submission period.
② Location: 〒077-0037 Rumoi Southern Forest Management Office, General Affairs Group (Accounting Section), 2-71-1 Okimi-cho, Rumoi City. Phone: 050-3160-5730.
③ Other: Submit via the electronic bidding system. Details are in the bid explanation. Submissions by mail or FAX will not be accepted. If paper bidding is permitted with approval, bring it to the location in ②.
(3) Those who do not submit the application form, confirmation documents, and technical proposal by the deadline specified in (2), or those who are deemed not to have competitive bidding qualifications, cannot participate in this competition.
4. Matters Regarding Comprehensive Evaluation Bidding Method:
(1) Method of Comprehensive Evaluation:
① The score for technical aspects (hereinafter referred to as "technical score") will be the sum of scores for each evaluation item specified in (2), with a maximum of 60 points awarded based on the content of technical proposals, etc.
② The score for bid price (hereinafter referred to as "price score") will be calculated by multiplying the value obtained by subtracting the ratio of bid price to estimated price from 1 by the allocation of 60 points for bid price. Price Score = Allocation Points for Bid Price × (1 - Bid Price / Estimated Price)
③ The comprehensive evaluation will be based on the "evaluation value," which is the sum of ① and ②.
Evaluation Value = Technical Score + Price Score
(2) Evaluation of Technical Proposal:
① The evaluation items for the technical proposal review are as follows:
a) Matters related to the experience and capabilities of the planned management engineer: Engineer's qualifications, experience in similar services, past performance in similar services, engineer's exclusivity, continuing education.
b) Matters related to the company's track record, capabilities, and reliability: Record of undertaking similar services at prices below the benchmark price for low-bid price investigation, past performance in similar services, record of activities based on disaster agreements, reliability, initiatives for promoting work-life balance, declaration of wage increases.
c) Matters related to the service implementation policy: Understanding of the service, appropriateness of the implementation procedure.
d) Matters related to technical proposals: Overall cost, performance/functionality of the contracted work or accuracy of the survey, social demands.
② The points for technical score are 24 points for a), 15 points for b), 10 points for c), and 15 points for d). The additional points will be calculated by multiplying the sum of the bidder's scores by the ratio of the maximum points to the total points (60/64).
Additional Points = 60 / 64 × Sum of Bidder's Scores
③ Evaluation of the reliability of technical proposal implementation:
The evaluation items for assessing the reliability of technical proposal implementation are as follows:
a) Are costs corresponding to the service content included?
b) Is appropriate remuneration to be paid to the planned engineer?
c) Is the quality management system secured?
d) Are payments to subcontractors, etc., appropriate?
④ Calculation of technical score for reliability of technical proposal implementation: The technical score for reliability of technical proposal implementation will be obtained by multiplying the evaluation score for item d) under ① by a reliability factor (1.0/0.75/0.5/0.25/0) based on a comprehensive review of evaluation items a) through d) under ③.
(3) Determination of Successful Bidder:
① Among bidders who meet all of the following requirements, the bidder with the highest evaluation value will be the successful bidder. However, for services with an estimated price exceeding 10 million yen, if it is deemed that the intended successful bidder cannot perform the contract in accordance with its content due to the bid price, or if it is deemed significantly inappropriate due to the risk of disrupting fair trade, the bidder who has bid meeting all of the following requirements and has the next highest evaluation value may be selected as the successful bidder.
a) The bid price is within the limit of the estimated price.
b) The technical proposal review results show that none of the essential evaluation items have a score of zero.
② If there are two or more bidders with the highest evaluation value in ①, the successful bidder will be determined by drawing lots.
5. Bidding Procedures, etc.
(1) Responsible Department: 〒077-0037 Rumoi Southern Forest Management Office, General Affairs Group (Accounting Section), 2-71-1 Okimi-cho, Rumoi City. Phone: 050-3160-5730. Email address: h_rumoinanbu@maff.go.jp
(2) Period, Location, and Method for Distribution of Bid Explanation, etc.:
① Distribution Period: From August 21, Reiwa 8 to September 17, Reiwa 8.
② Method: Generally distributed via the internet. https://www.rinya.maff.go.jp/hokkaido/apply/publicsale/ippan_rumoinanbu.html
(3) Date, Time, Location, and Method of Bid Form Submission for Bidding and Bid Opening:
Bid forms must be submitted via the electronic bidding system. However, if unavoidable circumstances arise and with the approval of the contracting authority, paper bid forms may be brought in person.
- 6 -
Submissions by mail, etc., are not permitted.
① For submission via the electronic bidding system:
Bid start date and time: September 15, Reiwa 8, 9:00 AM.
Bid closing date and time: September 18, Reiwa 8, 10:00 AM.
② For submission in person via paper bidding method: Bring to the Rumoi Southern Forest Management Office Meeting Room by 10:00 AM on September 18, Reiwa 8, and submit.
③ Bid opening will be conducted at the Rumoi Southern Forest Management Office Meeting Room at 10:00 AM on September 18, Reiwa 8.
④ For the execution of competitive bidding by paper bidding method, bring a copy of the notification of confirmation of competitive bidding qualifications and a letter of proxy if applicable.
6. Other:
(1) The language and currency used in the procedures shall be Japanese and the currency of Japan, respectively.
(2) Bid Security and Contract Security:
① Bid Security: Waived.
② Contract Security: To be paid.