Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Pipework (Open Cut) | 1 | Pipework | | | |
Road Surface Paving | 1 | Road Surface Paving | | | |
Special Manhole Work | 1 | | | | |
Pipework Earthwork | 1 | Excavation | m3 | 11 | | |
Generated Soil Disposal | 1 | | | | |
Backfill | m3 | 7 | | |
Earth Retaining Work | 1 | | | | |
Light Steel Sheet Pile Work | 1 | | | | |
Sendai City - 1 -
Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Lid Installation Work | 1 | | | | |
Manhole Iron Lid Work | 1 | | | | |
Ancillary Work | 1 | | | | |
Pavement Breaking Work | 1 | | | | |
Pavement Cutting | m | 12 | | |
Crushed Material Transport | Crushed Material Type: Pavement Breaking | m3 | 2 | | |
Crushed Material Disposal | Crushed Material Type: Asphalt Crushed Material | m3 | 2 | | |
Pavement Breaking | Pavement Type: Asphalt Pavement, Pavement Thickness: 18cm | m2 | 9 | | |
Sludge Transport and Disposal | m3 | 0.1 | | |
Asphalt Pavement Restoration Work | 1 | Excavation | m3 | 2 | | |
Sendai City - 2 -
Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Generated Soil Disposal | 1 | | | | |
Pavement Cutting | m | 18 | | |
Crushed Material Transport | Crushed Material Type: Pavement Breaking | m3 | 2 | | |
Crushed Material Disposal | Crushed Material Type: Asphalt Crushed Material | m3 | 2 | | |
Pavement Breaking | m2 | 11 | | |
Pavement Breaking | m2 | 8 | | |
Sludge Transport and Disposal | m3 | 0.2 | | |
Base Course (Road) | Material Type: Recycled Coarse Aggregate Ascon (20), Pavement Thickness: 130mm, Average Width: Over 3.0m | m2 | 19 | | |
Surface Course (Road) | Material Type: Recycled Dense Aggregate Ascon (13), Pavement Thickness: 50mm, Average Width: Over 3.0m | m2 | 19 | | |
Pavement Temporary Restoration Work (by Type) | 1 | | | | |
Lower Layer Roadbed (Pedestrian) | Roadbed Material Type: Recycled Crusher Run RC-40, Finished Thickness: 450mm | m2 | 8 | | |
Sendai City - 3 -
Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Surface Course (Road) | Material Type: Recycled Dense Aggregate Ascon (13), Pavement Thickness: 50mm, Average Width: 1.4m to 3.0m | m2 | 8 | | |
Preliminary Preparation Work | 1 | | | | |
Water Diversion Work | 1 | | | | |
Temporary Pump Operation Work | Day | 59 | | |
Manhole Internal Lid Opening/Closing Work | 1 | Manhole Internal Lid Opening/Closing Work | times | 59 | | |
Pipework Facility Cleaning Work | 1 | | | | |
General Pipework Cleaning Work | 1 | | | | |
Waste Plastic Transport and Disposal | 1 | | | | |
Manhole Inspection | 1 | | | | |
Manhole Inspection | 1 | | | | |
Sendai City - 4 -
Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Manhole Inspection Work | 1 | Location | | | |
Pipework Facility Inspection Work | 1 | | | | |
Pipework Inspection Work | 1 | | | | |
Main Pipe Submerged Visual Inspection Work | Pipe Diameter φ2100mm | Day | 6,250 | | |
Main Pipe Submerged Visual Inspection Work | Pipe Diameter φ2100mm | Night | 1,500 | | |
Repair Work | 1 | | | | |
Repair Work | 1 | | | | |
V-Cut Method | Main Pipe Joint | Night | 105.6 | | |
Mortar Repair Work | Inflow Water | Day | 7 | Locations | | |
Mortar Repair Work | Inflow Water | Night | 13 | Locations | | |
Chemical Grouting Water Stop Work | Night | 10 | Locations | | |
Sendai City - 5 -
Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Reinforcement Exposure Repair | Carbon Fiber Repair | Day | 10 | Locations | | |
Reinforcement Exposure Repair | Carbon Fiber Repair | Night | 4 | Locations | | |
Temporary Work | 1 | | | | |
Traffic Management Work | 1 | | | | |
Traffic Controller A (Day) | Person-Day | 44 | | |
Traffic Controller B (Day) | Person-Day | 56 | | |
Traffic Controller B (Night) | Person-Day | 156 | | |
Direct Construction Cost | 1 | | | | |
Common Temporary Work | 1 | | | | |
Common Temporary Work Cost | 1 | | | | |
Transportation Cost | 1 | | | | |
Sendai City - 6 -
Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Temporary Material Transport Cost | t | 3.3 | | |
Safety Cost | 1 | | | | |
Ventilation Equipment Cost (Day) | Day | 25 | | |
Ventilation Equipment Cost (Night) | Day | 34 | | |
Technical Management Cost | 1 | | | | |
Report Preparation Work | Manhole Inspection | Location | 1 | | |
Common Temporary Work (Percentage Basis) | 1 | | | | |
Net Construction Cost | 1 | | | | |
Site Management Cost | 1 | | | | |
Construction Cost | 1 | | | | |
General Administrative Costs, etc. | 1 | | | | |
Sendai City - 7 -
Design Document Number: K202681192193001
Summary of Construction Quantities (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity (Previous) | Quantity (Current) | Quantity Change | Remarks
Construction Price | 1 | | | | |
Consumption Tax and Local Consumption Tax Amount | 1 | | | | |
Total Construction Cost | 1 | | | | |
Sendai City - 8 -
Cost Estimation Conditions (Indirect Cost Adjustment List)
Unit Price | Usage Month | Unit Rate | Application Month
2026 July | 2026 July
Basis | Application Month
2026 July
Disaster Area Machine Damage Adjustment | Target Machines: None
Common Temporary Work (Percentage Basis)
Main Construction Types | N1: Pipework Repair Work, Manhole Lid Frame Removal/Installation Work
Construction Area, etc. Adjustment | Major City (2)
Snow Removal Work Adjustment | Not Used
ICT Construction Adjustment | No Adjustment
Weekend 2-Day Work Adjustment | No Adjustment
Reconstruction Coefficient Adjustment | Yes
Sendai City - 9 -
Cost Estimation Conditions (Indirect Cost Adjustment List)
Site Management Cost
Construction Area, etc. Adjustment | Major City (2)
Work Period (Heatstroke Adjustment) | 0 days
Midsummer Day Count | 0 days
Adjustment Coefficient | No Adjustment
Heatstroke Adjustment | Automatic Setting
Emergency Work Adjustment | No Adjustment
ICT Construction Adjustment | No Adjustment
Weekend 2-Day Work Adjustment | No Adjustment
Reconstruction Coefficient Adjustment | Yes
General Administrative Costs
Advance Payment Expenditure Ratio Adjustment | No Advance Payment
Foundation Organization, etc. Adjustment | No Adjustment
Contract Guarantee Adjustment Rate | No Adjustment
Sendai City - 10 -
Design Document Number: K202681192193001
Detailed Design Breakdown (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Pipework | 1 | | | | | |
Pipework (Open Cut) | 1 | | | | | |
Road Surface Paving | 1 | | | | | |
Road Surface Paving | 1 | | | | | |
Inner No. 1 Special Manhole Work | 1 | | | | | |
Pipework Earthwork | 1 | Excavation | m3 | 11 | | |
Unit No. 1 Generated Soil Disposal | 1 | | | | | |
Inner No. 2 Backfill | m3 | 7 | | |
Unit No. 2 Earth Retaining Work | 1 | | | | | |
Light Steel Sheet Pile Work | 1 | | | | | |
Inner No. 3 Lid Installation Work | 1 | | | | | |
Manhole Iron Lid Work | 1 | | | | | |
Inner No. 4 | | | | | |
Sendai City - 11 -
Design Document Number: K202681192193001
Detailed Design Breakdown (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Ancillary Work | 1 | | | | | |
Pavement Breaking Work | 1 | | | | | |
Pavement Cutting | m | 12 | | |
Unit No. 3 Crushed Material Transport | Crushed Material Type: Pavement Breaking | m3 | 2 | | |
Unit No. 4 Crushed Material Disposal | Crushed Material Type: Asphalt Crushed Material | m3 | 2 | | |
Unit No. 5 Pavement Breaking | Pavement Type: Asphalt Pavement, Pavement Thickness: 18cm | m2 | 9 | | |
Unit No. 6 Sludge Transport and Disposal | m3 | 0.1 | | |
Unit No. 7 Asphalt Pavement Restoration Work | 1 | Excavation | m3 | 2 | | |
Unit No. 8 Generated Soil Disposal | 1 | | | | |
Inner No. 5 Pavement Cutting | m | 18 | | |
Unit No. 9 Crushed Material Transport | Crushed Material Type: Pavement Breaking | m3 | 2 | | |
Unit No. 10 Crushed Material Disposal | Crushed Material Type: Asphalt Crushed Material | m3 | 2 | | |
Unit No. 11 | | | | | |
Sendai City - 12 -
Design Document Number: K202681192193001
Detailed Design Breakdown (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Pavement Breaking | m2 | 11 | | |
Unit No. 12 Pavement Breaking | m2 | 8 | | |
Unit No. 13 Sludge Transport and Disposal | m3 | 0.2 | | |
Unit No. 14 Base Course (Road) | Material Type: Recycled Coarse Aggregate Ascon (20), Pavement Thickness: 130mm, Average Width: Over 3.0m | m2 | 19 | | |
Unit No. 15 Surface Course (Road) | Material Type: Recycled Dense Aggregate Ascon (13), Pavement Thickness: 50mm, Average Width: Over 3.0m | m2 | 19 | | |
Unit No. 16 Pavement Temporary Restoration Work (by Type) | 1 | | | | |
Lower Layer Roadbed (Pedestrian) | Roadbed Material Type: Recycled Crusher Run RC-40, Finished Thickness: 450mm | m2 | 8 | | |
Unit No. 17 Surface Course (Road) | Material Type: Recycled Dense Aggregate Ascon (13), Pavement Thickness: 50mm, Average Width: 1.4m to 3.0m | m2 | 8 | | |
Unit No. 18 Preliminary Preparation Work | 1 | | | | |
Water Diversion Work | 1 | | | | |
Temporary Pump Operation Work | Day | | | | Unit No. 19
Manhole Internal Lid Opening/Closing Work | 1 | Manhole Internal Lid Opening/Closing Work | times | 59 | | |
Unit No. 20 | | | | | |
Sendai City - 13 -
Design Document Number: K202681192193001
Detailed Design Breakdown (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Pipework Facility Cleaning Work | 1 | | | | | |
General Pipework Cleaning Work | 1 | | | | | |
Waste Plastic Transport and Disposal | 1 | Inner No. 6 | | | | |
Manhole Inspection | 1 | | | | | |
Manhole Inspection | 1 | | | | | |
Manhole Inspection Work | 1 | Location | | | | Unit No. 21
Pipework Facility Inspection Work | 1 | | | | | |
Pipework Inspection Work | 1 | | | | | |
Main Pipe Submerged Visual Inspection Work | Pipe Diameter φ2100mm | Day | 6,250 | | | Unit No. 22
Main Pipe Submerged Visual Inspection Work | Pipe Diameter φ2100mm | Night | 1,500 | | | Unit No. 23
Repair Work | 1 | | | | | |
Repair Work | 1 | | | | | |
V-Cut Method | Main Pipe Joint | Night | 105.6 | | | Unit No. 24
Sendai City - 14 -
Design Document Number: K202681192193001
Detailed Design Breakdown (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Mortar Repair Work | Inflow Water | Day | 7 | | | Unit No. 25
Mortar Repair Work | Inflow Water | Night | 13 | | | Unit No. 26
Chemical Grouting Water Stop Work | Night | 10 | | | Unit No. 27
Reinforcement Exposure Repair | Carbon Fiber Repair | Day | 10 | | | Unit No. 28
Reinforcement Exposure Repair | Carbon Fiber Repair | Night | 4 | | | Unit No. 29
Temporary Work | 1 | | | | | |
Traffic Management Work | 1 | | | | | |
Traffic Controller A (Day) | Person-Day | | | | Unit No. 30
Traffic Controller B (Day) | Person-Day | | | | Unit No. 31
Traffic Controller B (Night) | Person-Day | | | | Unit No. 32
Direct Construction Cost | 1 | | | | | |
Common Temporary Work | 1 | | | | | |
Common Temporary Work Cost | 1 | | | | | |
Sendai City - 15 -
Design Document Number: K202681192193001
Detailed Design Breakdown (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Transportation Cost | 1 | | | | | |
Temporary Material Transport Cost | t | 3.3 | | | Unit No. 33
Safety Cost | 1 | | | | | |
Ventilation Equipment Cost (Day) | Day | | | | Unit No. 34
Ventilation Equipment Cost (Night) | Day | | | | Unit No. 35
Technical Management Cost | 1 | | | | | |
Report Preparation Work | Manhole Inspection | Location | 1 | | | Unit No. 36
Common Temporary Work (Percentage Basis) | 1 | | | | | |
Net Construction Cost | 1 | | | | | |
Site Management Cost | 1 | | | | | |
Construction Cost | 1 | | | | | |
General Administrative Costs, etc. | 1 | | | | | |
Sendai City - 16 -
Design Document Number: K202681192193001
Detailed Design Breakdown (Main 01)
Construction Name: Contract for Cleaning and Inspection Work of the 1st Minami-Gafu Trunk Sewer Line 3
Business Category: Construction
Work Category: Sewer Pipe Construction
Category/Type/Detail | Specification | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Construction Price | 1 | | | | | |
Consumption Tax and Local Consumption Tax Amount | 1 | | | | | |
Total Construction Cost | 1 | | | | | |
Sendai City - 17 -
Lump Sum Unit Breakdown | Unit Price Usage Month | Work Rate Application Month | Labor Adjustment Factor
2026.07 | 2026.07 | 1.500-00001 0.0 0
Inner No. 1 Road Surface Paving | Name/Specification | Conditions | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Cover Plate/Support Installation/Removal Work | Launching Shaft | Installation Area 50m2 or less | Installation/Removal, C-attached 1.7t (2nd) | m3 | 0.28 (0.2m3) | m2 | 9 | Unit No. 37 | 10-01-05 | Management Cost Category: 0
Cover Plate Opening/Closing Work | Launching Shaft | Installation Area 50m2 or less | Opening/Closing, excluding launching work, C-attached 1.7t (2nd) | m3 | 0.28 (0.2m3) | m2 | 9 | Unit No. 38 | 10-01-05 | Management Cost Category: 0
Cover Plate/Support Rental Fee | | | | | |
Management Cost Category: 0
Base Crushed Stone | 7.5cm to 12.5cm, Recycled Crusher Run 40-0, All Costs | m2 | | |
202-02-02 | Management Cost Category: 0
Total
Sendai City - 18 -
Lump Sum Unit Breakdown | Unit Price Usage Month | Work Rate Application Month | Labor Adjustment Factor
2026.07 | 2026.07 | 1.500-00001 0.0 0
Inner No. 2 Generated Soil Disposal | Name/Specification | Conditions | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Soil Transport | Small Scale, Backhoe | Heap Volume 0.28m3 (Level Volume 0.2m3), Soil (including rocks/gravel), Yes, within 9.0km | m3 | 11 | | | 02-01-02 | Management Cost Category: 0
Disposal Fee (m3) | | | m3 | 13 | | | Unit No. 39 | 01-14-01 | Management Cost Category: 0
Total
Sendai City - 19 -
Lump Sum Unit Breakdown | Unit Price Usage Month | Work Rate Application Month | Labor Adjustment Factor
2026.07 | 2026.07 | 1.500-00001 0.0 0
Inner No. 3 Light Steel Sheet Pile Work | Name/Specification | Conditions | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Light Steel Sheet Pile Installation Work (Both Sides) | Excavation Depth 2.0m or less, C-attached 2.9t (1st) | Heap Volume 0.45m3 (Level Volume 0.35m3) | m | 5 | Unit No. 40 | 10-01-04 | Management Cost Category: 0
Light Steel Sheet Pile Removal Work (Both Sides) | Excavation Depth 2.0m or less, Backhoe Crane-attached 2.9t (1st) | Heap Volume 0.45m3 | m | 5 | Unit No. 41 | 10-01-04 | Management Cost Category: 0
Earth Retaining Support Work (Light Metal Support) | | m | 5 | Unit No. 42 | | Management Cost Category: 0
Sheet Pile/Support Rental Fee | | | | | |
Management Cost Category: 0
Total
Sendai City - 20 -
Lump Sum Unit Breakdown | Unit Price Usage Month | Work Rate Application Month | Labor Adjustment Factor
2026.07 | 2026.07 | 1.500-00001 0.0 0
Inner No. 4 Manhole Iron Lid | Name/Specification | Conditions | Unit | Quantity | Unit Price | Amount | Quantity/Amount Change | Remarks
Parent and Child Lid T-25 φ900-600 | | Set | 1 | | | Management Cost Category: 0
Lid