Cover Page Miscellaneous Expenses Breakdown Contract Rock Diagnosis No. 14, Reiwa, 8, Fiscal Year, Construction Name:, National Health Insurance Iwamura Clinic Toilet Renovation Construction, Location, 1650-1 Iwamura-cho, Ena City, Iwamura Clinic Premises, Design Date, Reiwa, Year, Month, Day, Period, Days, Start Date, Reiwa, Year, Month, Day, Completion Date, Reiwa, Year, Month, Day, &R Ena City , Name, Specification, Quantity, Unit, Unit Price, Amount, Remarks, National Health Insurance Iwamura Clinic Toilet Renovation Construction, I. Direct Construction Costs, 1.0, Set, Thousand Yen Cutoff, II. Common Temporary Costs, 1.0, Set, Thousand Yen Cutoff, Net Construction Costs Total, Direct Construction Costs + Common Temporary Costs, III. Site Management Costs, 1.0, Set, Thousand Yen Cutoff, Construction Costs Total, Net Construction Costs + Site Management Costs, IV. General Administrative Costs, 1.0, Set, Thousand Yen Cutoff, Contract Price Total, Construction Costs + General Administrative Costs, Consumption Tax Equivalent Amount, 10%, 1.0, Set, Total, "&C&"MS Mincho,Regular"&P&R&"MS Mincho,Regular" Ena City", Name, Remarks, Quantity, Unit, Unit Price, Amount, Remarks, National Health Insurance Iwamura Clinic Toilet Renovation Construction, I. Direct Construction Costs, 1, Temporary Work, 1.0, Set, 2, Demolition Work, 1.0, Set, 3, Interior Renovation Work, 1.0, Set, 4, Electrical Equipment Work, 1.0, Set, 5, Water Supply Equipment Work, 1.0, Set, 6, Drainage Equipment Work, 1.0, Set, 7, Sanitary Equipment Work, 1.0, Set, 8, Demolition and Removal Work, 1.0, Set, Subtotal, Revised Total, 1, Temporary Work, Curing, Wood substrate PB application, Demolition Work, including dust control, 26.5, ㎡, Layout marking fee, 7.7, ㎡, Cleaning and tidying up, 7.7, ㎡, Ladder scaffolding, 1.0, Set, Subtotal, 2, Demolition Work, Ceiling removal, 7.7, ㎡, Partial removal of wall structure, 1.0, Set, Removal of wall finishing materials, including substrate, 27.0, ㎡, Toilet booth demolition (partitions, dividers), 1.0, Set, Countertop demolition, 1.0, Set, Floor tile removal, 5.8, ㎡, Floor sheet removal, 1.5, ㎡, SUS baseboard removal, 1.0, m, Removal of piping foundation, 4.0, ㎡, Door demolition, handrail removal, 1.0, Set, Transport and disposal, Waste plastic, 1.0, Set, Asbestos-containing building materials, 1.0, Set, Rubble (with tiles), 1.0, Set, Sanitary pottery, 1.0, Set, Wood, 1.0, Set, Scrap metal, 1.0, Set, Subtotal, 3, Interior Renovation Work, Concrete placement, for floor excavation area, 4.0, ㎡, Reinforcement work, 1.0, Set, Mortar placement, trowel finish, 7.7, ㎡, Lightweight steel wall framing, LGS75 @303, 9.2, ㎡, Lightweight steel wall framing, countertop LGS65 @303, 4.4, ㎡, Lightweight steel soffit, LGS100, 1.2, ㎡, Lightweight steel ceiling framing, 19 type @303, 7.7, ㎡, Ceiling opening reinforcement, 3.0, Locations, Ceiling access panel, 450 square, frame type, 2.0, Locations, Ceiling ventilation fan, VD-23ZVB6, 1.0, Location, Equipment base reinforcement, 1.0, Set, Wall sheathing board application, GL method GB-St12.5, 15.6, ㎡, Wall sheathing board application, GB-St12.5, 14.8, ㎡, Wall non-combustible wallpaper application, 26.0, ㎡, Ceiling decorative plasterboard, t=9.5 910x910, 7.7, ㎡, Cornice, Vinyl U-shape, 11.3, m, Countertop melamine postform, t=20, 3.4, m, Countertop installation fee, 1.0, person, Soft skirting board, 10.5, m, Sheet flooring, t=2.0, 7.5, ㎡, Welding rods, 1.0, m, Construction cost, including transport, 1.0, Set, Floor SUS baseboard, 1.0, Set, Steel door, Calm Slider / Culture Shutter, 1.0, Set, Subtotal, 4, Electrical Equipment Work, Cable, VVF 1.6mm-2C, 12.0, m, ditto, VVF 2.0mm-2C, 7.0, m, ditto, VVF 1.6mm-3C, 12.0, m, ditto, VVF 2.0mm-2C+1.6G, 46.0, m, Type 1 metal conduit (metal molding), Type A 25.4x11.5 with cover, 6.0, m, Type 1 metal conduit (switch box), 1-gang Type A, 2.0, units, Type 1 metal conduit (switch box), 2-gang shallow type, 1.0, unit, Type 1 metal conduit (corner box), Type A, 3.0, units, Receptacle, 2P15A x 2 with E-terminal, 2.0, units, Switch, 1P15A x 1, 1.0, unit, Switch sensor, master unit, 1.0, unit, Switch sensor, slave unit, 1.0, unit, Operation unit, 2-circuit guard plate, 1.0, unit, LED downlight, 60W equivalent, 3.0, units, Ceiling-mounted ventilation fan, VD-23ZVB6, 1.0, unit, Toilet push button, with pull cord, 1.0, unit, Call bell master unit, WQ4302K, 1.0, unit, Miscellaneous consumables, 1.0, Set, Electrician fee, 1.0, Set, Existing wiring modification fee, 1.0, Set, Existing fixture removal fee, 1.0, Set, Existing distribution board modification fee, circuit expansion, 1.0, Set, Subtotal, 5, Water Supply Equipment Work, Water supply vinyl-lined steel pipe, SGP-VA (threaded joint) indoor general 20A, 7.0, m, Pipe branching/connection, 1.0, Set, Insulation, painting, Glass wool wrapping, 1.0, Set, Pipe support brackets, 1.0, Set, Piping work cost, 1.0, Set, Subtotal, 6, Drainage Equipment Work, Rigid polyvinyl chloride pipe, RF-VP toilet interior (buried) 50A, 2.0, m, Rigid polyvinyl chloride pipe, RF-VP toilet interior (buried) 75A, 2.0, m, Rigid polyvinyl chloride pipe, RF-VP toilet interior (buried) 100A, 4.0, m, Pipe branching/connection, 1.0, Set, Piping work cost, 1.0, Set, Subtotal, 7, Sanitary Equipment Work, Western-style toilet with backrest, BC-950SK/DV-K213KF-CK-URJ-P/KFC-270T1U, 1.0, Set, Ostomate, PTOM-B210W including side panels, 1.0, Set, Washbasin, L-365APR/AM-311V1, 1.0, Set, Vanity mirror, KF-D3660AG, 1.0, sheet, Multi-purpose sink, S-18U/SF28PA/SF18C/LF12-13U, 1.0, Set, Flip-up handrail, KF-481EH70J, 1.0, unit, L-shaped handrail, KF-920AE70D12J, 1.0, unit, Paper holder, CF-32H, 1.0, Set, Paper holder, KF16U, 1.0, Set, Fixture installation work, 1.0, Set, Subtotal, 8, Demolition and Removal Work, Existing fixture removal, 1.0, Set, Existing piping removal, including support brackets, 1.0, Set, Subtotal, "&C&"MS Gothic,Regular"&10&P&R&"MS Gothic,Regular"&10 Ena City", Site Explanation Matters Project Number: Contract Rock Diagnosis No. 14 Project Name: National Health Insurance Iwamura Clinic Toilet Renovation Construction Project Location: 1650-1 Iwamura-cho, Ena City, Iwamura Clinic Construction Scope: Design documents, site explanation matters, and question/answer document. Construction Period: Commencement: Date of contract conclusion. Completion: January 29, Reiwa 9. Construction Details: Installation of a multi-purpose toilet within the Iwamura Clinic. Distributed Documents: Drawings: 1 copy. Breakdown: 1 copy. Other: 1. The site explanation matters and question/answer document shall be included in the design documents. 2. The contractor shall be responsible for performing all work naturally required for this construction. 3. Efforts shall be made to subcontract to local businesses in Ena City. 4. For contracts of 5 million yen or more, the contractor shall create a "Construction Record Card" based on the Construction Record Service (CORINS) input system ((Zaidan Hojin) Japan Construction Information Center) at the time of award, modification, completion, or correction, obtain confirmation from the supervisor, and submit the registration application to the registration organization within 10 days of contract award, within 10 days of any change, or within 10 days of project completion, or as appropriate for corrections. 5. During construction, the contractor shall enroll in contractor liability insurance, conclude the contract, and submit a copy of the certificate to the supervisor. The period shall be from the commencement date to 14 days after the scheduled completion date. 6. The quantities in the breakdown are reference quantities, and the model numbers shall be equivalent or superior. 7. This construction project is subject to the "Complete Two-Day Weekend System" construction. 8. Waste materials, etc. shall be disposed of properly in accordance with laws and regulations. 9. As the construction will take place while the facility is in operation, the contractor shall create a construction plan in consultation with the supervisor and facility manager, ensuring safety during delivery, parking of construction vehicles, and use of toilets during construction, to prevent accidents. Akechi Railway Akechi Railway JR Chuo Main Line JR Chuo Main Line Agi River Dam Agi River Dam Takena Takena Chuo Expressway Chuo Expressway To Nagoya To Nagoya Ena City Hall Ena City Hall 257 257 Enna Enna Ena IC Ena IC 19 19 To Nagano To Nagano 363 363 363 363 Yamaoka Yamaoka 418 418 Iwamura Iwamura Iwamura Castle Ruins Iwamura Castle Ruins Yudachi Mountain Yudachi Mountain Aki Aki To Akechi To Akechi Taisho Village Taisho Village Kamiyashiro La Foret Kamiyashiro La Foret Roadside Station Roadside Station Fukujyu-no-Sato Fukujyu-no-Sato 257 257 Mimoriyama Mimoriyama Construction Site: 1650-1 Iwamura-cho, Ena City Construction Site: 1650-1 Iwamura-cho, Ena City Ena City National Health Insurance Iwamura Clinic National Health Insurance Iwamura Clinic Toilet Renovation Construction Toilet Renovation Construction 7500400029470 9970 Y1 Y1 Y3 Y3 Y2 Y2 8470 1500 1000 5500 6500 Y5 Y5 Y4 Y4 Y6 Y6 4000 2500 2500 2400 1550 1550 40200 4500 5200 X2 X2 3600 X1 X1 5200 4500 X3 X3 X4 X4 20800 5200 5200 X5 X5 5200 X6 X6 X7 X7 5200 X8 X8 X9 X9 2600 2600 5900 5200 X10 X10 700 X11 X11 5200 46100 20410 3600 4715222517524253325175215238554152157470 6500 2300 4200 5500 012348567910 HCL Internal Medicine Consultation Room HCL HCL Treatment Room HCL Pediatrics/Infectious Disease Room HCL Pediatrics/Orthopedics Consultation Room HCL 3200 1800 4915 2685 4600 EV EV EV Conference Room Laboratory Urine Collection Window Laboratory Specimen Collection Storage Room Electrocardiogram Room Treatment Room (IV) Audiology Waiting Hall Rehabilitation Air Conditioning Machine Room Chart Storage Room Operation Room Endoscopy Room Ultrasound Room HCL Reception 3585 2500 1500 6000 1000 1500 3000 1200 9500 Women's Restroom Men's Restroom Entrance Vestibule Reception/Accounting Office Consultation Room ENT Courtyard Multipurpose Room X-ray Room Operating Room X-ray Room Corridor Waiting Hall Hall Pharmacy Waiting 215 1st Floor Plan 1/100 1st Floor Plan 1/100 215 12300 Staff Entrance Slope Slope 3600 215 Upper Skylight Upper Skylight Temporary Construction (Enclosure Area) Temporary Construction (Enclosure Area) (Enclosure Area) National Health Insurance Iwamura Clinic Toilet Renovation Construction National Health Insurance Iwamura Clinic Toilet Renovation Construction Lightweight ceiling frame 70120 2,425 3,500 200 120 120 120 Before Renovation Floor Plan After Renovation Floor Plan DA Room Name Before/After Toilet Before/After Floor Ceiling Wall Excavation + Concrete Placement New installation of large toilet, ostomate, washbasin, mirror, multi-purpose sink. Removal of floor, ceiling, walls, toilet booth, sliding door, sanitary fixtures. Other + Mortar base (trowel finish) Sheet flooring t2 Floor Plan (Changes) BC Universal Sheet 1,498 696 180 1,000 120 Wheelchair-accessible toilet Flip-up door Effective opening width Countertop H=1300 2,425 3,500 200 120 120 Calm Slider / Culture Shutter Double sliding type Frame depth 130 90 400 90 1,000 960 960 Wheelchair-accessible washbasin Ostomate Multi-purpose sink 450 Handrail Lightweight ceiling frame + Waterproof plaster t12.5 580 800 758 770 393 400 540 485 540 110 375 2,220 975 50 1,170 25-50 Urinal Urinal Lavatory Large Toilet Large Toilet Paper Holder Paper Holder Countertop Handrail 780 *Sash bottom FL+980 *Sash bottom FL+980 3,300 3,320 Flexible board t6 Ceramic mosaic tile 800 Paper holder Water supply pipe Paper holder Wheelchair rotation 1500Φ Piping Water supply pipe Partition Stainless steel + glass ±0 Deckle edge Water supply pipe Water supply pipe Stored Open State Only base required. *Scheduled for future installation (AC-US-41) National Health Insurance Iwamura Clinic Toilet Renovation Construction Non-combustible wallpaper application Decorative plasterboard + Vinyl U-shaped baseboard Handrail, backrest, accessories newly installed Direction A Elevation Direction B Elevation Direction C Elevation Direction D Elevation Ceiling Plan Countertop 1,300 2,425 Elevation (Before Renovation) Floor baseboard 2,690 FIX 2,690 2,690 2,690 5050 50 2,425 Partition Water supply pipe Water supply pipe Ventilation fan Inspection port 1,800 Partition 2,120 Mirror Lighting 3,500 90 580 800 758 770 393 110 50 3,500 110 950 1,135 425 880 Piping Partition (Stainless steel + glass) 2,425 3,500 50 Wall structure removal National Health Insurance Iwamura Clinic Toilet Renovation Construction Countertop Direction A Elevation Direction B Elevation Direction C Elevation Direction D Elevation Mirror 400 Single faucet 960 960 1,000 Postform t20 AICA Kogyo UYA type 1,300 2,425 Wheelchair-accessible toilet 450 350 Handrail 2,425 3,500 983 Elevation (After Renovation) Ceiling Plan 2,690 2,690 2,690 2,690 FIX Ventilation fan Inspection port 2,100 2,100 623 910 623 750 910 910 750 LED Lighting 3,500 2,425 3,500 Water supply pipe *Universal sheet is scheduled for future installation, so only the base is required. Soft skirting board Waterproof PB12.5 + Non-combustible wallpaper National Health Insurance Iwamura Clinic Toilet Renovation Construction 2,425 2,425 Before Renovation Floor Plan After Renovation Floor Plan Drainage Water Supply 100-150 100-150 Water Supply and Drainage Diagram 75 75 20 20 20 20 50 50 100 50 20 3,500 3,500 20 National Health Insurance Iwamura Clinic Toilet Renovation Construction S-18U (wall drain P trap SF28PA, mounting bolt SF-18C) etc., faucet LF12-13U Large toilet Ostomate Washbasin Mirror Multi-purpose sink Handrail L-shaped handrail BC-950SK (Set part number) Wheelchair-accessible PTOM-B21OW・SSW (Set part number) L-365APR (automatic faucet AM-311TCV1 etc.) KF-481EH70J (flip-up type) KF-920AE70D12J IXIL IXIL IXIL IXIL IXIL IXIL IXIL IXIL KF-D3660AG Backrest Accessory Paper holder CF-32H, Paper holder KF16U Including side panels KFC-270T1U (for flush valve) National Health Insurance Iwamura Clinic Toilet Renovation Construction Special Specifications Complete Two-Day Weekend (Saturday/Sunday) Construction This construction project is a complete two-day weekend (Saturday/Sunday) construction (site closed) based on the principle of a complete two-day weekend. For details, please refer to the "Ena City Issued Complete Two-Day Weekend (Saturday/Sunday) Construction Implementation Guidelines."