Tenders/Contract Construction No. 161 Road Pavement Repair Work (South) (Compressed file: 3.3MB)
Open🇯🇵JapanWorks

Contract Construction No. 161 Road Pavement Repair Work (South) (Compressed file: 3.3MB)

Auto-translated from Japanese
Original title: 契建設第161号 市道舗装修繕工事(南部) (圧縮ファイル: 3.3MB)
岐阜県恵那市
Published: Oct 28, 2026
Updated: Nov 1, 2026
Source: 官公需 (kkj.go.jp)

About This Opportunity

This is a works contract in the construction and civil works and transport and logistics sectors, with a focus on Roads, Rehabilitation and Warehousing. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Contract Construction No. 161 Road Pavement Repair Work (South) (Compressed file: 3.3MB) Location Map 1 910549105309183 Location Map 2 9205391048 Location Map 3 10012 Design Document Mirror Breakdown Table Unit Price Table (Unregistered Prices) Special Specifications (Mirror) Special Specifications Construction Number: Contract Construction No. 161 Project Name: Road/River Name: Construction Name: Contract Construction No. 161 Road Pavement Repair Work (South) Specifications Fiscal Year: Reiwa 08 Construction Location: Ena City, Iwamura-cho area Project Overview: Pavement Work A=547㎡, Pavement Cutting L=188m, Debris Transport V=27m³, Traffic Guidance Personnel N=40 people Construction Method: Contract Construction Period: Start Date: Completion Date: Unit Rate Application Month: Unit Price Application Month: Reason for Commencement: "" Breakdown Table: Name | Quantity | Unit | Unit Price | Amount | Remarks 01: Main Construction Cost | Classification: Pavement Work Pavement Work | 1 | Lot | Pavement Work | 1 | Lot | Pavement Work | 1 | Lot | Surface Layer (Roadway/Shoulder) (Construction Package) Less than 1.4m (average finished thickness per layer 50mm or less), average finished thickness per layer 50mm, recycled dense graded asphalt concrete (20), prime coat PK-3, all costs | 197 | m² | Construction P Unit Price Table (CB410260-0001) Surface Layer (Roadway/Shoulder) (Construction Package) Over 3.0m, average finished thickness per layer 50mm, recycled dense graded asphalt concrete (20), prime coat PK-3, all costs | 350 | m² | Construction P Unit Price Table (CB410260-0002) Lower Base Course (Roadway/Shoulder) (Construction Package) Total finished thickness 140mm, single layer construction, recycled crusher run RC-40, all costs | 350 | m² | Construction P Unit Price Table (CB410030-0003) Excavation (Construction Package) Earth and sand, other than above (small scale), standard | 50 | m³ | Construction P Unit Price Table (CB210100-0004) Breakdown Table: Name | Quantity | Unit | Unit Price | Amount | Remarks Debris Disposal Work | Yamaoka-cho Kubara Disposal Site | 50 | m³ | Unit Price Table (SJ0030) Pavement Slab Crushing and Loading (Small Scale Earthwork) (Construction Package) All costs | 547 | m² | Construction P Unit Price Table (CB210720-0006) Pavement Slab Cutting (Construction Package) Asphalt pavement slab, 15cm or less, all costs | 188 | m | Construction P Unit Price Table (CB430510-0007) Asphalt Debris Transport and Disposal Work 91054 | 0.200 | m³ | Unit Price Table (SJ0011) Asphalt Debris Transport and Disposal Work 91053 | 0.100 | m³ | Unit Price Table (SJ0012) Asphalt Debris Transport and Disposal Work 09183 | 6 | m³ | Unit Price Table (SJ0013) Asphalt Debris Transport and Disposal Work 91048 | 2 | m³ | Unit Price Table (SJ0014) Asphalt Debris Transport and Disposal Work 92053 | 1 | m³ | Unit Price Table (SJ0015) Breakdown Table: Name | Quantity | Unit | Unit Price | Amount | Remarks Asphalt Debris Transport and Disposal Work 10012 | 18 | m³ | Unit Price Table (SJ0016) Traffic Control Work | 1 | Lot | Traffic Guidance Guard B | Person | RW1045 Direct Construction Cost Total | 1 | Lot | Indirect Construction Cost: Common Temporary Facilities Cost Common Temporary Facilities Cost (Proportional Amount) | 1 | Lot | Construction Area: No construction area correction, no correction | Breakdown Table: Name | Quantity | Unit | Unit Price | Amount | Remarks Common Temporary Facilities Cost Total | 1 | Lot | Net Construction Cost | 1 | Lot | Site Management Cost | 1 | Lot | Site Management Cost (Proportional Amount) | 1 | Lot | Construction Area: No construction area correction, no correction | Construction Cost | 1 | Lot | General Administrative Expenses, etc. | 1 | Lot | Total | 1 | Lot | Total | "" | | | | Debris Disposal Work, Unit Price Table (SJ0030), Yamaoka-cho Kubara Disposal Site | 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks Earth and Sand Transport (Construction Package) | Small scale, earth and sand (including gravel/boulders), no DID section, within 4.0km | 10.000 | m³ | Construction P Unit Price Table (CB210110-0005) Debris Disposal Fee | Yamaoka Kubara Disposal Site, loosened soil volume unit price | 12.000 | m³ | TJ0023 Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per Asphalt Debris Transport and Disposal Work 91054, Unit Price Table (SJ0011), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008) Disposal Fee (Ena City, Muban-cho, Takeori) Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004 Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per Asphalt Debris Transport and Disposal Work 91053, Unit Price Table (SJ0012), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008) Disposal Fee (Ena City, Muban-cho, Takeori) Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004 Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per Asphalt Debris Transport and Disposal Work 09183, Unit Price Table (SJ0013), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008) Disposal Fee (Ena City, Muban-cho, Takeori) Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004 Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per Asphalt Debris Transport and Disposal Work 91048, Unit Price Table (SJ0014), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008) Disposal Fee (Ena City, Muban-cho, Takeori) Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004 Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per Asphalt Debris Transport and Disposal Work 92053, Unit Price Table (SJ0015), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 28.5km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0009) Disposal Fee (Ena City, Muban-cho, Takeori) Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004 Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per Asphalt Debris Transport and Disposal Work 10012, Unit Price Table (SJ0016), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008) Disposal Fee (Ena City, Muban-cho, Takeori) Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004 Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per | "MS Mincho, Regular" 10 Ena City "MS Mincho, Regular" 10 Page Design Document Mirror (Reference Material) Design Document Mirror Breakdown Table Unit Price Table (Unregistered Prices) Special Specifications (Mirror) Special Specifications Reiwa 08 Contract Construction No. 161 Road Pavement Repair Work (South) Reference Material Ena City, Iwamura-cho area Special Specifications Article 1 Application: Unless otherwise specified, the contractor shall perform construction in accordance with the Gifu Prefecture Construction Work Common Specifications. The design and cost estimation standards for this design document apply the Reiwa 08 version of the Civil Engineering Work Standard Cost Estimation Standards, etc. Article 2 Pre-Construction Consultation: Within 1-2 weeks after the contract, the contractor shall conduct a pre-construction consultation regarding "fulfillment items," "statutory welfare costs," and other matters requiring prompt consultation. For other consultation matters (design details, etc.), the contractor shall consult with the supervisor by the construction start date, unless otherwise instructed by the supervisor. For consultations, fill in the consultation items in the "Construction Meeting Record" (Form No. 12-1) and bring it to the meeting. The supervisor shall fill in the "Construction Meeting Record" with the response (other) and notify the contractor of the response. Article 3 Confirmation of Underground Buried Objects: Accident prevention during construction near underground buried objects shall be handled in accordance with the "Manual for Accident Prevention of Underground Buried Objects" (October 2020, Chubu Regional Development Bureau). Article 4 Calculation for Work Completed in Less Than One Day: "Calculation for Work Completed in Less Than One Day" (hereinafter referred to as the "Less Than One Day Calculation Standard") shall apply only to change calculations. The contractor may initiate consultation regarding the application of the Less Than One Day Calculation Standard if there is a deviation from the construction package type calculation standard. When consulting, the contractor shall submit to the supervisor written evidence indicating that it falls under the Less Than One Day Calculation Standard, and other supporting documents necessary for the consultation (daily reports, documents showing actual costs, etc.). Article 5 Implementation of Model Construction, etc.: After the construction contract, the contractor may request the client to implement the following model construction, etc. * Model construction utilizing ICT * Model construction for improving construction site environment * Model construction utilizing construction career advancement system * Construction utilizing ASP information sharing system * Construction implementing remote site supervision in construction sites Article 6 Implementation of One-Day Response: This construction project is subject to the implementation of One-Day Response. Implementation shall be carried out in accordance with the "One-Day Response Implementation Guidelines." Article 7 Information Sharing Using Email: Information sharing between the contractor and the client during the construction of this project shall be carried out in accordance with the "Guidelines for Information Sharing Using Email." However, if this is difficult, it shall be decided in consultation with the supervisor during the pre-construction consultation. Article 8 Implementation of Electronic Delivery: This construction project is subject to electronic delivery of completion documents. The contractor shall create electronic deliverables in accordance with the "Gifu Prefecture Construction Work Common Specifications," "Guidelines for Electronic Delivery of Completion Documents," "Gifu Prefecture Electronic Delivery Operation Guidelines," etc., and deliver them on electronic media. The facility information registration file shall be created and submitted in accordance with the "Guidelines for Updating Facility Information, etc." If there are any matters not described in the "Guidelines" or "Guidelines," or if questions arise, consult with the supervisor. Article 9 Electronic Digitization of Small Blackboard Information in Digital Construction Photos: If electronic digitization of small blackboard information in digital construction photos is to be performed, it may be designated as a construction project subject to electronic digitization of small blackboard information after obtaining the supervisor's approval following the construction contract. Operation shall be carried out in accordance with the "2-8 Electronic Digitization of Small Blackboard Information in Digital Construction Photos" in the Photo Management Standards. Article 10 Subcontracting, etc., and Materials Used: When selecting subcontractors, etc., the contractor shall endeavor to utilize companies with offices or business establishments within Gifu Prefecture in accordance with the "Gifu Prefecture Public Contract Ordinance" (Gifu Prefecture Ordinance No. 21 of March 24, 2015, hereinafter referred to as the "Public Contract Ordinance"). Furthermore, the contractor shall endeavor to use Gifu Prefecture-produced construction materials. Article 11 Contracts with Subcontractors, etc.: The contractor shall comply with the "Construction Industry Act" (Act No. 100 of 1949), the "Act on Prevention of Delay in Payment of Consideration to Small and Medium-sized Subcontractors, etc." (Act No. 120 of 1956), the "Public Contract Ordinance," and other relevant laws and regulations, and shall endeavor to conclude fair contracts based on mutual agreement on an equal footing with subcontractors, etc., based on an estimate that clarifies the breakdown of labor costs and other expenses. Article 12 Reporting on Implementation of Ingenuity and Social Contribution, etc.: The contractor shall describe the specific content and implementation methods of ingenuity items planned by themselves in the construction plan upon commencement of construction, and by the completion of the construction, may submit the implementation status of ingenuity and social contribution items in the "Implementation Report on Ingenuity" (Construction Evaluation Form No. 6) or "Implementation Report on Social Contribution (Contribution to the Community, etc.)" (Construction Evaluation Form No. 7) to the supervisor. Article 13 Proper Disposal of Industrial Waste: For construction projects involving the removal of industrial waste, the contractor shall comply with the "Gifu Prefecture Guidelines for Effective Utilization and Proper Disposal of Construction By-products," submit and confirm related documents, inspect disposal facilities on-site, manage the status of construction waste disposal, and confirm that industrial waste is properly disposed of until final disposal, and present related documents to the supervisor. Article 14 Obligation to Report Unjust Interference: 1. Obligation to Report Obstruction or Unjust Demands: When receiving unjust or illegal demands that are not recognized as reasonable based on facts and social norms, or obstruction that hinders the proper fulfillment of the contract, from a violent group or its members during contract performance, the contractor shall report to the police. Failure to report may result in suspension of tender participation qualifications. 2. Extension of Performance Period: If the contractor cannot complete the work within the performance period due to unjust interference by a violent group or its members, they may request an extension of the performance period from the client. Article 15 Guidelines for Design Changes in Construction Contracts (Draft): The contractor shall conduct a review based on the "Guidelines for Design Changes in Construction Contracts (Draft)." Article 16 Creation of Construction Documents: Documents created, submitted, stored, etc., by the contractor in conjunction with construction work, and their handling, shall be carried out in accordance with the "Guidelines for Creation and Submission of Construction Documents." Article 17 Operation of Vehicles Exceeding General Limits: In the confirmation of permits for passage based on Article 47-2 of the Road Act in Article 1-1-36 Traffic Safety Management, Paragraph 13 of the Gifu Prefecture Construction Work Common Specifications, the contractor shall organize and store related documents and present them promptly upon request from the supervisor or inspector.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on October 28, 2026. Last refreshed today. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 岐阜県恵那市

岐阜県恵那市 has issued 88 procurement notices on BidsFactory, including 24 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: October 28, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by 岐阜県恵那市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
官公需 (kkj.go.jp)
Public Procurement

Contracting Authority

岐阜県恵那市
🇯🇵Japan