Contract Construction No. 161 Road Pavement Repair Work (South) (Compressed file: 3.3MB)
Location Map 1
910549105309183
Location Map 2
9205391048
Location Map 3
10012
Design Document Mirror Breakdown Table Unit Price Table (Unregistered Prices) Special Specifications (Mirror) Special Specifications
Construction Number: Contract Construction No. 161
Project Name: Road/River Name: Construction Name: Contract Construction No. 161 Road Pavement Repair Work (South) Specifications
Fiscal Year: Reiwa 08
Construction Location: Ena City, Iwamura-cho area
Project Overview: Pavement Work A=547㎡, Pavement Cutting L=188m, Debris Transport V=27m³, Traffic Guidance Personnel N=40 people
Construction Method: Contract
Construction Period: Start Date: Completion Date:
Unit Rate Application Month: Unit Price Application Month:
Reason for Commencement: ""
Breakdown Table:
Name | Quantity | Unit | Unit Price | Amount | Remarks
01: Main Construction Cost | Classification: Pavement Work
Pavement Work | 1 | Lot | Pavement Work | 1 | Lot | Pavement Work | 1 | Lot | Surface Layer (Roadway/Shoulder) (Construction Package)
Less than 1.4m (average finished thickness per layer 50mm or less), average finished thickness per layer 50mm, recycled dense graded asphalt concrete (20), prime coat PK-3, all costs | 197 | m² | Construction P Unit Price Table (CB410260-0001)
Surface Layer (Roadway/Shoulder) (Construction Package)
Over 3.0m, average finished thickness per layer 50mm, recycled dense graded asphalt concrete (20), prime coat PK-3, all costs | 350 | m² | Construction P Unit Price Table (CB410260-0002)
Lower Base Course (Roadway/Shoulder) (Construction Package)
Total finished thickness 140mm, single layer construction, recycled crusher run RC-40, all costs | 350 | m² | Construction P Unit Price Table (CB410030-0003)
Excavation (Construction Package)
Earth and sand, other than above (small scale), standard | 50 | m³ | Construction P Unit Price Table (CB210100-0004)
Breakdown Table:
Name | Quantity | Unit | Unit Price | Amount | Remarks
Debris Disposal Work | Yamaoka-cho Kubara Disposal Site | 50 | m³ | Unit Price Table (SJ0030)
Pavement Slab Crushing and Loading (Small Scale Earthwork) (Construction Package)
All costs | 547 | m² | Construction P Unit Price Table (CB210720-0006)
Pavement Slab Cutting (Construction Package)
Asphalt pavement slab, 15cm or less, all costs | 188 | m | Construction P Unit Price Table (CB430510-0007)
Asphalt Debris Transport and Disposal Work 91054 | 0.200 | m³ | Unit Price Table (SJ0011)
Asphalt Debris Transport and Disposal Work 91053 | 0.100 | m³ | Unit Price Table (SJ0012)
Asphalt Debris Transport and Disposal Work 09183 | 6 | m³ | Unit Price Table (SJ0013)
Asphalt Debris Transport and Disposal Work 91048 | 2 | m³ | Unit Price Table (SJ0014)
Asphalt Debris Transport and Disposal Work 92053 | 1 | m³ | Unit Price Table (SJ0015)
Breakdown Table:
Name | Quantity | Unit | Unit Price | Amount | Remarks
Asphalt Debris Transport and Disposal Work 10012 | 18 | m³ | Unit Price Table (SJ0016)
Traffic Control Work | 1 | Lot | Traffic Guidance Guard B | Person | RW1045
Direct Construction Cost Total | 1 | Lot |
Indirect Construction Cost:
Common Temporary Facilities Cost
Common Temporary Facilities Cost (Proportional Amount) | 1 | Lot | Construction Area: No construction area correction, no correction |
Breakdown Table:
Name | Quantity | Unit | Unit Price | Amount | Remarks
Common Temporary Facilities Cost Total | 1 | Lot |
Net Construction Cost | 1 | Lot |
Site Management Cost | 1 | Lot |
Site Management Cost (Proportional Amount) | 1 | Lot | Construction Area: No construction area correction, no correction |
Construction Cost | 1 | Lot |
General Administrative Expenses, etc. | 1 | Lot |
Total | 1 | Lot |
Total | "" | | | |
Debris Disposal Work, Unit Price Table (SJ0030), Yamaoka-cho Kubara Disposal Site | 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks
Earth and Sand Transport (Construction Package) | Small scale, earth and sand (including gravel/boulders), no DID section, within 4.0km | 10.000 | m³ | Construction P Unit Price Table (CB210110-0005)
Debris Disposal Fee | Yamaoka Kubara Disposal Site, loosened soil volume unit price | 12.000 | m³ | TJ0023
Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per
Asphalt Debris Transport and Disposal Work 91054, Unit Price Table (SJ0011), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks
Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008)
Disposal Fee (Ena City, Muban-cho, Takeori)
Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004
Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per
Asphalt Debris Transport and Disposal Work 91053, Unit Price Table (SJ0012), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks
Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008)
Disposal Fee (Ena City, Muban-cho, Takeori)
Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004
Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per
Asphalt Debris Transport and Disposal Work 09183, Unit Price Table (SJ0013), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks
Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008)
Disposal Fee (Ena City, Muban-cho, Takeori)
Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004
Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per
Asphalt Debris Transport and Disposal Work 91048, Unit Price Table (SJ0014), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks
Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008)
Disposal Fee (Ena City, Muban-cho, Takeori)
Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004
Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per
Asphalt Debris Transport and Disposal Work 92053, Unit Price Table (SJ0015), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks
Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 28.5km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0009)
Disposal Fee (Ena City, Muban-cho, Takeori)
Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004
Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per
Asphalt Debris Transport and Disposal Work 10012, Unit Price Table (SJ0016), 10 | m³ | Per | Name / Specifications | Quantity | Unit | Unit Price | Amount | Remarks
Debris Transport (Construction Package) | Pavement slab crushing, mechanical loading (small scale earthwork), no DID section, within 17.0km, all costs | 10.000 | m³ | Construction P Unit Price Table (CB227010-0008)
Disposal Fee (Ena City, Muban-cho, Takeori)
Asphalt disposal site, lumps 50x50x50cm or less | 23.500 | t | ZC29840004
Total | 10.000 | m³ | Per Unit | 1.000 | m³ | Per | "MS Mincho, Regular" 10 Ena City "MS Mincho, Regular" 10 Page
Design Document Mirror (Reference Material)
Design Document Mirror Breakdown Table Unit Price Table (Unregistered Prices) Special Specifications (Mirror) Special Specifications
Reiwa 08
Contract Construction No. 161 Road Pavement Repair Work (South) Reference Material
Ena City, Iwamura-cho area
Special Specifications
Article 1 Application:
Unless otherwise specified, the contractor shall perform construction in accordance with the Gifu Prefecture Construction Work Common Specifications.
The design and cost estimation standards for this design document apply the Reiwa 08 version of the Civil Engineering Work Standard Cost Estimation Standards, etc.
Article 2 Pre-Construction Consultation:
Within 1-2 weeks after the contract, the contractor shall conduct a pre-construction consultation regarding "fulfillment items," "statutory welfare costs," and other matters requiring prompt consultation. For other consultation matters (design details, etc.), the contractor shall consult with the supervisor by the construction start date, unless otherwise instructed by the supervisor. For consultations, fill in the consultation items in the "Construction Meeting Record" (Form No. 12-1) and bring it to the meeting. The supervisor shall fill in the "Construction Meeting Record" with the response (other) and notify the contractor of the response.
Article 3 Confirmation of Underground Buried Objects:
Accident prevention during construction near underground buried objects shall be handled in accordance with the "Manual for Accident Prevention of Underground Buried Objects" (October 2020, Chubu Regional Development Bureau).
Article 4 Calculation for Work Completed in Less Than One Day:
"Calculation for Work Completed in Less Than One Day" (hereinafter referred to as the "Less Than One Day Calculation Standard") shall apply only to change calculations. The contractor may initiate consultation regarding the application of the Less Than One Day Calculation Standard if there is a deviation from the construction package type calculation standard. When consulting, the contractor shall submit to the supervisor written evidence indicating that it falls under the Less Than One Day Calculation Standard, and other supporting documents necessary for the consultation (daily reports, documents showing actual costs, etc.).
Article 5 Implementation of Model Construction, etc.:
After the construction contract, the contractor may request the client to implement the following model construction, etc.
* Model construction utilizing ICT
* Model construction for improving construction site environment
* Model construction utilizing construction career advancement system
* Construction utilizing ASP information sharing system
* Construction implementing remote site supervision in construction sites
Article 6 Implementation of One-Day Response:
This construction project is subject to the implementation of One-Day Response. Implementation shall be carried out in accordance with the "One-Day Response Implementation Guidelines."
Article 7 Information Sharing Using Email:
Information sharing between the contractor and the client during the construction of this project shall be carried out in accordance with the "Guidelines for Information Sharing Using Email." However, if this is difficult, it shall be decided in consultation with the supervisor during the pre-construction consultation.
Article 8 Implementation of Electronic Delivery:
This construction project is subject to electronic delivery of completion documents. The contractor shall create electronic deliverables in accordance with the "Gifu Prefecture Construction Work Common Specifications," "Guidelines for Electronic Delivery of Completion Documents," "Gifu Prefecture Electronic Delivery Operation Guidelines," etc., and deliver them on electronic media. The facility information registration file shall be created and submitted in accordance with the "Guidelines for Updating Facility Information, etc." If there are any matters not described in the "Guidelines" or "Guidelines," or if questions arise, consult with the supervisor.
Article 9 Electronic Digitization of Small Blackboard Information in Digital Construction Photos:
If electronic digitization of small blackboard information in digital construction photos is to be performed, it may be designated as a construction project subject to electronic digitization of small blackboard information after obtaining the supervisor's approval following the construction contract. Operation shall be carried out in accordance with the "2-8 Electronic Digitization of Small Blackboard Information in Digital Construction Photos" in the Photo Management Standards.
Article 10 Subcontracting, etc., and Materials Used:
When selecting subcontractors, etc., the contractor shall endeavor to utilize companies with offices or business establishments within Gifu Prefecture in accordance with the "Gifu Prefecture Public Contract Ordinance" (Gifu Prefecture Ordinance No. 21 of March 24, 2015, hereinafter referred to as the "Public Contract Ordinance"). Furthermore, the contractor shall endeavor to use Gifu Prefecture-produced construction materials.
Article 11 Contracts with Subcontractors, etc.:
The contractor shall comply with the "Construction Industry Act" (Act No. 100 of 1949), the "Act on Prevention of Delay in Payment of Consideration to Small and Medium-sized Subcontractors, etc." (Act No. 120 of 1956), the "Public Contract Ordinance," and other relevant laws and regulations, and shall endeavor to conclude fair contracts based on mutual agreement on an equal footing with subcontractors, etc., based on an estimate that clarifies the breakdown of labor costs and other expenses.
Article 12 Reporting on Implementation of Ingenuity and Social Contribution, etc.:
The contractor shall describe the specific content and implementation methods of ingenuity items planned by themselves in the construction plan upon commencement of construction, and by the completion of the construction, may submit the implementation status of ingenuity and social contribution items in the "Implementation Report on Ingenuity" (Construction Evaluation Form No. 6) or "Implementation Report on Social Contribution (Contribution to the Community, etc.)" (Construction Evaluation Form No. 7) to the supervisor.
Article 13 Proper Disposal of Industrial Waste:
For construction projects involving the removal of industrial waste, the contractor shall comply with the "Gifu Prefecture Guidelines for Effective Utilization and Proper Disposal of Construction By-products," submit and confirm related documents, inspect disposal facilities on-site, manage the status of construction waste disposal, and confirm that industrial waste is properly disposed of until final disposal, and present related documents to the supervisor.
Article 14 Obligation to Report Unjust Interference:
1. Obligation to Report Obstruction or Unjust Demands:
When receiving unjust or illegal demands that are not recognized as reasonable based on facts and social norms, or obstruction that hinders the proper fulfillment of the contract, from a violent group or its members during contract performance, the contractor shall report to the police. Failure to report may result in suspension of tender participation qualifications.
2. Extension of Performance Period:
If the contractor cannot complete the work within the performance period due to unjust interference by a violent group or its members, they may request an extension of the performance period from the client.
Article 15 Guidelines for Design Changes in Construction Contracts (Draft):
The contractor shall conduct a review based on the "Guidelines for Design Changes in Construction Contracts (Draft)."
Article 16 Creation of Construction Documents:
Documents created, submitted, stored, etc., by the contractor in conjunction with construction work, and their handling, shall be carried out in accordance with the "Guidelines for Creation and Submission of Construction Documents."
Article 17 Operation of Vehicles Exceeding General Limits:
In the confirmation of permits for passage based on Article 47-2 of the Road Act in Article 1-1-36 Traffic Safety Management, Paragraph 13 of the Gifu Prefecture Construction Work Common Specifications, the contractor shall organize and store related documents and present them promptly upon request from the supervisor or inspector.