Tenders/Urban Planning Road Route 18 Improvement Construction Part 2 Appendix (PDF 122.5 KB)
Open🇯🇵JapanWorks

Urban Planning Road Route 18 Improvement Construction Part 2 Appendix (PDF 122.5 KB)

Auto-translated from Japanese
Original title: 都市計画道路18条通整備工事その2 別表 (PDF 122.5 KB)
北海道帯広市
Published: Jun 29, 2026
Updated: Jul 23, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the construction and civil works, urban development and housing and transport and logistics sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese

Urban Planning Road Route 18 Improvement Construction Part 2 Appendix (PDF 122.5 KB)
Appendix (Obihiro City Notice No. 184) 1 Construction Number 1 2 Construction Overview Construction Name Construction Location Construction Details 3 Estimated Price (including tax) ¥117,095,000 4 Ordering Method Number of Members 5 Participation Qualification Requirements Work Type Grade Location Construction Experience Engineer Contractor for Design Work, etc. for the Construction 6 Intention to Participate in Bidding Confirmation of Expression of Intent to Bid Form 7 Bid Participation Qualification Specific Construction Joint Venture Application Other Required Documents Joint Venture Agreement Form Same or Similar Construction Work Experience Form 8 Documents Specified Other Than Bid Forms Submission Required (only for the lowest bidder after the bid) Construction Cost Breakdown Form Required Refer to the public notice. Hokuo Consultant Co., Ltd. Submission Required Submission Required Planned Engineer Experience Form Submission Required (only for the representative of the lowest bidder after the bid) Construction Period From the day after the contract is concluded (if the day is a Saturday, Sunday, or holiday, the next business day) until January 14, Reiwa 9 Joint Venture Construction 3 *Construction completed and delivered on or after April 1, Reiwa 13. (When using construction experience from a joint venture, it is limited to cases where the investment ratio as a member of the joint venture is 20% or more.) Grade A Grade A Grade A Must have a head office with a construction permit in Obihiro City. Must have a head office with a construction permit in Obihiro City. Must have a head office with a construction permit in Obihiro City. Representative Member Member Experience in new construction, replacement, or demolition of public bridges as prime contractor. Experience in public civil engineering work as prime contractor. Experience in public civil engineering work as prime contractor. Submission Required (only for the lowest bidder after the bid) Construction Cost Breakdown Form Required Refer to the public notice. Hokuo Consultant Co., Ltd. Submission Required Submission Required Planned Engineer Experience Form Submission Required (only for the representative of the lowest bidder after the bid) 9 Method of Selecting Successful Bidder 10 Matters Related to Contract Conclusion Contract Conclusion Deadline Contract Deposit 11 Advance Payment, Interim Advance Payment, and Partial Payment Advance Payment Interim Advance Payment Partial Payment 12 Target Construction. 1314 Construction Management Section For construction with a contract amount of ¥2.5 million or more, advance payment will be made upon request within the range of 4/10 of the payment limit. For construction with a contract amount of ¥2.5 million or more and a construction period of 90 days or more that meets the conditions specified by the city, an additional advance payment of up to 2/10 of the construction cost may be made upon request in addition to the advance payment. However, this cannot be combined with partial payment. For construction with a contract amount of ¥10 million or more, partial inspections will be conducted for every ¥5 million exceeding the amount of work completed, and partial payments equivalent to 9/10 of that amount may be made. However, partial payments are limited to twice. Act on the Recycling, etc. of Construction Materials (Construction Recycling Act) To ensure performance that conforms to the contract, a minimum reserve price will be set in advance. In this case, the bidder with the lowest price within the range of the estimated price will not be selected as the successful bidder; instead, the bidder with the lowest price among those who submitted valid bids at a price equal to or higher than the minimum reserve price within the range of the estimated price will be the successful bidder. Within 7 days from the date of notification of the successful bid decision (if the 7th day is a Saturday, Sunday, or holiday, the next business day). If the contract is not concluded by the deadline, the successful bid will be canceled. Payment (However, payment of the contract deposit may be substituted by providing securities or a guarantee from a financial institution or guarantee company. Furthermore, if a public works performance guarantee bond is provided or a performance guarantee insurance contract is concluded, the contract deposit will be exempted.) (2) Design documents can be downloaded from the website. (3) This construction is subject to the "Administrative Procedures for Loan Utilization Utilizing Assignment of Construction Contract Receivables and Regional Construction Industry Management Strengthening Loan System and Assignment of Receivables". (4) This construction requires the placement of a lead worker for lead work. Please check the design documents for details. (5) This construction is subject to "2-day work week construction". If the contractor wishes to implement a 2-day work week, they must consult with the client after the contract is concluded, and if an agreement is reached, they will implement a full 2-day work week (Saturdays and Sundays) or a monthly 2-day work week. Furthermore, even if a monthly 2-day work week cannot be achieved, a full-year 2-day work week must be implemented. Construction Management Section Applicable Construction Notes (1) Refer to the main text of the notice and the bid explanation. Design Documents (Special Specifications, Location Map, Summary of Construction Quantities) Reiwa 8 Urban Planning Road Route 18 Improvement Construction Part 2 Hokkaido Obihiro City 1st Design Change Special Specifications Special Specifications 2026.4 Hokkaido Obihiro City (City Environment Department, Civil Engineering Office, Civil Engineering Division) Calculation of work completed in less than 1 day Traffic opening after line restoration Construction work unit price Handling of paint peeling, etc. Implementation of 2-day work week Other Handling of property boundary markers (stakes) Phased confirmation items As-built drawings Electronic delivery/information sharing (trial) Joint venture formation table Construction material quality confirmation request Completion report Installation of manholes, etc. Recycled asphalt mixture Asphalt emulsion Recycled aggregate Concrete Form Construction byproduct (construction excavated soil) Construction plan form Streetlight survey form Construction byproduct (felled trees, roots, excavation, clearing, etc.) Construction sign specifications Inspection record form (summary) Road lighting facilities Disposal of specified construction materials Inspection and coordination form Road sign construction Obstruction items Performance report Report on utilization of skilled labor Construction site generated items Boundary stake confirmation list form Internal completion inspection report form Rainwater manhole location display Boundary stake confirmation form Receipt form Planting Phased confirmation request Return form Vegetation work Joint venture formation table Building and other site confirmation form Lighting fixture Construction material quality confirmation request Manifests for industrial waste (summary) Large signs Confirmation of recycled aggregate shipment form Construction system report Sidewalk general structure Site generated items form Delivery slip for felled branches and trunks Prevention of damage to existing public facilities underground and above ground Construction excavated soil receiving contract form Site visit request form Various ledgers Excavated soil receiving certificate form Painting record form Recycling report form Construction experience Hokkaido Circular Resource Utilization Promotion Tax form Confirmation form for procedures related to the Act on the Prevention of Asbestos Hazards, etc. Construction insurance application form Flowchart for confirmation of procedures related to the Soil Contamination Countermeasures Act, etc. Utilization of skilled labor List of specified machinery Loan of deliverables Reason for not being able to use exhaust gas compliant construction machinery Delivery box for construction deliverables Coordination form for construction near power lines Maintenance property list form Concrete structure crack survey form 424037323335363125 Streetlight survey form 232726241922214134302829201618171415131211444647487 Creation of construction plan 8 Calculation information 10 Traffic control and safety measures On-site environmental improvement costs Table of Contents 2 Civil Engineering Work Calculation Standards, etc. 39389 4 Reference Drawings 43 1 Application 6 Indication of Construction Conditions 5 3 Approximate Quantities 45 Application This construction will be carried out in accordance with the "Hokkaido Construction Department Civil Engineering Work Common Specifications (Latest Version)" (hereinafter referred to as the "Common Specifications").
In cases not covered by the "Design Documents", "Common Specifications", or special specifications, the relevant guidelines, directives, and instructions shall be followed, and consultation with the construction supervisor shall be conducted as needed. Consultation shall also be conducted for any doubts or unclear points during construction.
Furthermore, this shall be in accordance with the "Ordinance on Technical Standards for the Structure of Roads in Obihiro City and Enforcement Regulations", the "Obihiro City Road Mobility Improvement Standards Ordinance", and the "Obihiro City Road Sign Dimensions Regulations".
Civil Engineering Work Calculation Standards, etc. (1) These design documents are based on the "Civil Engineering Work Calculation Guidelines", "Civil Engineering Work Calculation Standards", "Handbook for Systematization of Civil Engineering Work Types", and "Civil Engineering Work Quantity Calculation Guidelines" established by the Hokkaido Construction Department.
(2) The standards established in the "Civil Engineering Work Calculation Standards" are handled as follows.
① The distinction between machine work and manual labor, etc., is determined from the design drawings, etc., but machine work is assumed unless machine work is difficult.
② When standard construction methods or standard equipment are specified in each standard, they are used for calculation, unless otherwise specified in the special specifications, etc.
③ The above ① and ② do not restrict the contractor's choice of construction method.
However, if it is difficult to comply due to site conditions, design changes will be made as necessary.
(3) Matters stipulated in the "Handbook for Systematization of Civil Engineering Work Types" will be subject to design changes as necessary if the content specified in the "Specifications/Abstract" column changes.
Approximate Quantities (1) The quantities listed in the "List of Quantities to be Treated as Approximate" will be subject to design changes as necessary.
(2) For this construction, the contractor shall prepare the design change documents (creation of design change drawings and calculation of construction quantities).
(3) For construction involving approximate quantities, a construction drawing, quantity calculation sheet, etc., shall be prepared, and thorough consultation with the construction supervisor shall be conducted, with the progress of the meeting recorded in the construction coordination form.
(4) Standard drawings show standard construction drawings or as-built conditions, and the contractor shall implement them after thorough verification according to the site conditions, etc.
(5) If a change is necessary, consult with the construction supervisor promptly.
(6) The quantities of temporary work listed in the "List of Quantities to be Treated as Approximate" are calculated based on standard construction methods. Items newly required due to site conditions may also be treated as approximate quantities.
(7) Approximate quantities of construction byproducts ① Demolition/crushing costs/transportation costs 1. Volume calculated by measuring the dimensions of structures, etc.
Submit photos of measurements and consult. 2. If measurement of structure dimensions is difficult and volume/weight calculation is impossible (e.g., when the shape of the structure is irregular), calculate by converting from the quantity in the "Manifest Summary for Industrial Waste" using unit mass. 3. For work types other than ② where structure dimensions are not measured, calculate by converting from the quantity in the "Manifest Summary for Industrial Waste" using unit mass, but do not change for excessive finished work. 1 2 3 4. Pavement thickness measurement method Each pavement layer is considered one construction section. One measurement point per 20m of construction length. For construction lengths less than 60m, three points will be used to measure pavement thickness and calculate the average.
When measuring pavement thickness, measure the pavement directly.
If there is a difference from the design in the pavement removal area and a change is necessary, conduct an on-site inspection with the construction supervisor before construction, submit change documents, and consult.
② Disposal costs 1. Submit the "Manifest Summary for Industrial Waste" and consult.
The approximate quantity will be determined from the disposal quantity, but no change will be made for excessive finished work.
Submit manifests and weighing certificates to the construction supervisor as instructed.
Reference Drawings The drawings shown as reference drawings indicate the construction methods, materials, etc., assumed by the client, and the matters shown therein do not restrict the contractor's choice of construction method.
However, if it is difficult to comply due to site conditions, consult with the supervisor as necessary.
Please note that this does not constitute a change for excessive planning in the design.
Calculation Information The calculation base date and calculation period for the estimated price of this construction are as follows.
(1) Reiwa Year Month Day Reiwa Year Month Day to Reiwa Year Month Day (2) The calculation period includes not only the actual working days required for construction but also preparation time (40 days), cleanup time (20 days), as well as allowances for rain delays, holidays, etc. (Sundays, holidays, summer vacation, year-end and New Year holidays, and all Saturdays during the work period).
Indication of Construction Conditions In the work yard, confirm the ground condition before setting up the crane and report the results to the supervisor.
For the temporary bridge, which is scheduled to be completed by separate work, temporary materials, etc., will be treated as supplied items and will be subject to common temporary costs and site management costs. Therefore, the temporary bridge must be maintained and repaired during this period.
The period is assumed to be from September 26, Reiwa 8 to January 14, Reiwa 9, after the completion of the separate work.
Creation of Construction Plan (1) The contractor shall, promptly after the contract is concluded, examine the public design documents, conduct on-site confirmation through basic surveys, file notifications with relevant organizations, and hold consultations with the construction supervisor.
(2) For items specified in the special specifications that require condition indication, confirm whether they match the site conditions, etc., and describe them in detail in the construction plan, including drawings (manager's name, company name, address, distance, and acceptance conditions, etc.).
If any discrepancies are found between the design documents and the site conditions, report them immediately to the construction supervisor and consult as necessary.
(3) The construction method shall be described in accordance with the common specifications, including specific work procedures, specific work methods, and points to note for this construction.
(Excavation method, compaction, spreading method, structure construction method, work removal method, temporary work method, etc.) (4) The as-built management standards, quality control standards, and photographic management standards shall be clearly stated, in addition to the management standards in accordance with the common specifications, including internal management standards.
Also, indicate the planned locations and extent of implementation for each part (survey point, etc.).
(5) For quality control standards, except for small-scale construction, all relevant items must be satisfied. The test methods, quality control standard items, and implementation items shall be described after consultation with the construction supervisor.
(6) Phased confirmations and on-site inspections specified in the special specifications and common specifications shall be included, and other phased confirmation items shall be included after consultation with the construction supervisor.
Calculation Base Date 8 6 29 Calculation Period 8 7 28 9 1 14 (7) Describe the condition of public land such as roads and rivers, and also include precautions during construction to prevent road facilities, etc., from extending beyond the road boundaries into private land.
...

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on June 29, 2026. Last refreshed 14 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 北海道帯広市

北海道帯広市 has issued 61 procurement notices on BidsFactory, including 8 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Transport & Logistics, and Urban Development & Housing. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 3, 2026.

Frequently asked questions about this tender

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 北海道帯広市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

北海道帯広市
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.