Tender Announcement
As follows, an open competitive tender will be conducted, and in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act (Cabinet Order No. 16, March 1947), the following announcement is made.
September 7, Reiwa 8
Signed: Katsuhisa Sasaki, Mayor of Sabae City
1. Work to be Tendered via Open Competitive Tender:
Work Name: Yoshida Niban Line Snow Melting Facility Construction Part 2 (26-102024)
Work Location: Niban-cho, Sabae City
Outline: Construction Length L=285.2m
Snow Melting Sprinkler Pipe Installation: Sprinkler Pipe HIVP-RRφ65 L=285.2m
Construction Period: Until January 29, Reiwa 9
Design Amount: ¥12,331,000 (including consumption tax and local consumption tax)
Tender Method: Restricted Open Competitive Tender (Post-Bid Review Type)
Electronic Bidding
Minimum Reserve Price: Yes
Bid Security: None
Contract Security: 10% of the contract amount
2. Qualifications Required for Bidders (Reiwa 7/8 Grading):
Type of Construction Work: Piping Work (Water Supply)
Target Industry Grade, etc.:
A: Reiwa 7 Snow Removal Cooperation Contractor (2.5km or more)
B: Reiwa 7 Snow Removal Cooperation Contractor (2.5km or more)
C: Reiwa 7 Snow Removal Cooperation Contractor (2.5km or more)
Head Office Location: Must have headquarters or a branch office in Sabae City.
Other: Must be listed in the Sabae City Construction Work and Other Bidding Qualification Register and registered in the specified grade for the target industry above.
Must not fall under the provisions of Article 167-4 of the Local Autonomy Act.
Must be able to assign necessary personnel, including engineers and site supervisors as defined by the Construction Industry Act (Act No. 100, 1949), to the target work.
Must not be within a period of suspension of bidding based on the "Sabae City Construction Work and Other Contractual Agreements Suspension Measures Ordinance."
3. Bidding Procedures:
Procedure | Period/Date/Deadline | Method
-----------------|--------------------------|--------
Design Document Browsing | Sep 7, Reiwa 8 (Mon) 2:00 PM - Sep 16, Reiwa 8 (Wed) 5:00 PM | Sabae City Hall, Electronic Browsing
Inquiry Reception for Design Documents | Sep 10, Reiwa 8 (Thu) | To the Bidding Administration Section (Submission or Email)
Inquiry Response Browsing | Same as Design Document Browsing Deadline | Bidding Administration Section
Bidding Date | Sep 15, Reiwa 8 (Tue) 8:30 AM - Sep 16, Reiwa 8 (Wed) 4:00 PM | Electronic Bidding System
Bid Opening Date | Sep 17, Reiwa 8 (Thu) 10:00 AM | Electronic Bidding System
Submission of Work Cost Breakdown | Required (Statutory welfare costs must be itemized) | Electronic Bidding System
Submission Deadline for Request for Tender Participation Application, etc. | Sep 17, Reiwa 8 (Thu) 3:00 PM | Electronic Bidding System
Qualification Notification | After confirmation of Tender Participation Qualification Application, results will be notified. | Electronic Bidding System
Successful Bidder Notification | To be notified to the successful bidder. | Electronic Bidding System
4. Documents to Submit with Tender Participation Qualification Application:
① Tender Participation Qualification Application (via Electronic Bidding System)
② Tender Participation Qualification Confirmation Documents
- Qualifications, background, and experience of the planned site supervisor and supervising engineer, etc. (Form No. 4)
5. Notes:
Submit a work cost breakdown corresponding to the bid amount written on the bid form.
Submission of Work Cost Breakdown:
- The work cost breakdown must include quantities, unit prices, and amounts.
(If necessary)
- The work cost breakdown will be confirmed by city officials and kept by Sabae City.
For the determination of the successful bidder, the bid price will be the amount written on the bid form plus 10% of that amount. Therefore, bidders must write the amount excluding consumption tax, regardless of whether they are subject to consumption tax or not. The amount obtained after rounding down to the nearest yen any fraction less than one yen in the amount equivalent to 110/100 of the amount written on the bid form shall be considered the submitted bid.
Bids submitted by individuals who do not meet the required qualifications, those who have made false statements in their application for qualification review, those who have violated the construction bid instructions or other conditions indicated in the announcement, etc., shall be deemed invalid.
Furthermore, bids submitted by those who have been suspended from bidding after receiving confirmation, or those who do not meet the bidding qualifications at the time of bidding or bid opening, shall be deemed invalid.
Bids submitted without a work cost breakdown shall be deemed invalid.
Bids submitted without confirming the browsing documents shall be deemed invalid.
Method of Determining the Successful Bidder:
The successful bidder shall be the one who submits the lowest bid within the limit of the estimated price. (If there are multiple bidders with the same lowest bid price, the successful bidder will be determined by lottery.)
Other:
- The number of bidding rounds for this tender is limited to two. (Re-bidding will be conducted at a time designated by the bidding officer after the first bid opening concludes, so bidders must remain near the electronic bidding system equipment until all procedures related to the bid opening are completed.)
- If there are fewer than two bidders, the bidding will be terminated.
- Bidders must carefully read and comply with the construction bid instructions and the Sabae City Construction Contract Terms and Conditions, etc.
- Information and forms required for bidding can be found on the Sabae City website.
6. Contact Department:
Bidding Administration: Sabae City, Financial Management Division
Construction Work, etc.: Sabae City, Civil Engineering Division