Public Notice Appendix Form No. 1 456, Notice No. 7-79, August 17, Reiwa 8, To Whom It May Concern, Mayor of Aga Town, Regarding the Implementation of Restricted General Competitive Bidding, We have decided to implement a restricted general competitive bidding for the following matter. Those who wish to participate in the bidding should submit the application documents for bidding participation for this matter by the specified deadline.
Record
① Project Overview
Project Category: Construction
Project Name: Project for Extending the Lifespan and Disaster Prevention/Mitigation of Agricultural Waterways, etc.
Construction Number: R08 National Subsidy No. 103
Subject: Improvement of Tochibori Waterway, 2nd Phase Construction
Construction Location: Within Aga Town, Hiroya
Construction Period: 150 days from the contract date
Construction Outline: Construction extension L=456m, 1st waterway L=216m, 2nd waterway L=240m
② Matters for Bidding
Bidding Execution Date and Time: August 27, Reiwa 8 (Thursday) 10:10 AM
Bidding Venue: Aga Town Hall Kamikawa Branch Office, 2nd Floor, Meeting Room No. 2
Bidding Participation Conditions:
Business Category: Individual
Office Category: Head Office
Regional Requirement: The bidder's address must be in Aga Town.
Aga Town
Industry and Grade: Industry: Civil Engineering (General), Grade: B, C, D
Track Record Requirement: None
Other Requirements: The bidder must not be subject to a suspension of bidding by Aga Town during the period from the date of this notice to the bidding date.
(Notes): None
Bid Bond: Exempt (However, if the successful bidder fails to conclude the contract, a penalty equivalent to 5/100 of the winning bid amount will be collected.)
Contract Security Deposit: Deposit an amount not less than 10/100 of the contract amount.
Advance Payment/Interim Payment: Advance Payment: Yes, Interim Advance Payment: Yes, Partial Payment: Yes
Minimum Reserve Price: Will be set.
Breakdown of Estimated Costs: Submission of a breakdown of estimated costs for this bid is required. The breakdown of estimated costs should be described down to the major items.
Invalid Bids: Bids deemed invalid by Article 137, Paragraphs 1 and 3 of the Aga Town Financial Regulations, other Aga Town bidding-related regulations, and the Aga Town Construction Work Bidder's Handbook will be considered invalid.
Determination of Successful Bid: For the determination of the successful bid, the successful bid price will be the amount written on the bid form plus 10/100 of that amount (if there is a fraction of less than 1 yen, that fraction will be rounded down). Therefore, bidders must write the amount equivalent to 100/100 of their estimated contract desired amount on the bid form, regardless of whether they are taxable or non-taxable for consumption tax and local consumption tax.
③ Bidding Participation Application Documents
Submission Deadline: August 24, Reiwa 8 (Monday) by 12:00 PM
Submission Location and Method: Submit in person or by an agent to the Property Management Section, General Affairs Division, Aga Town Hall (2nd Floor, Aga Town Hall Main Building).
Submission Documents:
Bidding Participation Application Form (Appendix Form No. 1): 1 copy
Documents Proving Track Record (Copy of Contract, etc.): Not required
Construction Track Record Statement (Appendix Form No. 3): Not required
Assigned Engineer Statement (Appendix Form No. 4): Not required
Certificate of Employment for Assigned Engineer:
④ Collins/TECRIS: The successful bidder must register the contents of this project in the Collins/TECRIS registration system.
⑤ Regarding Contract: Upon determination of the successful bidder for this bid, Aga Town and the successful bidder shall promptly conclude the contract.
⑥ Matters to be Observed: Bidding and contracting for this project shall be conducted in accordance with the Aga Town Financial Regulations, the Aga Town Construction Work Competitive Bidding Implementation Guidelines, the Aga Town Construction Work Restricted General Competitive Bidding Implementation Guidelines, other Aga Town bidding and contract-related regulations, and the Aga Town Construction Work Bidder's Handbook posted separately at the bidding venue. Bidders must comply with these regulations.
⑦ Inquiries, etc.: If you have any questions regarding this bid, contract, or design documents, please submit them in person or by fax to the Property Management Section, General Affairs Division, Aga Town Hall by the deadline for submitting bidding participation application documents. The submission form is optional.
⑧ Contact Information: Property Management Section, General Affairs Division, Aga Town Hall, 580 Tsugawa, Aga Town, Higashikambara District, Niigata Prefecture. Tel: 0254-92-3113, Fax: 0254-92-5479
* The items listed on the right refer to those registered in Aga Town's various bidder qualification lists by the day before this notice, or those delegated by such persons and having the right to conclude contracts with Aga Town.
* Submitted application documents will not be returned.
* For details of the outline, please refer to the materials posted on the town's homepage.
Appendix Form No. 1, 456, Civil Engineering B, C, D, Aga Town, Head Office_Track Record: None, General Competitive Bidding Participation Application Form, Reiwa Year Month Day, Mayor of Aga Town, Kanda Kazuaki, Esq., Address, Company Name or Trade Name, Representative's Name, Seal, Phone Number, Email Address, Contact Person's Name, I meet the bidding participation qualification requirements for the matter announced on August 17, Reiwa 8, and wish to participate in the bidding, so I hereby apply in accordance with the provisions of Article 4, Paragraph 1 of the Aga Town Construction Work Restricted General Competitive Bidding Implementation Guidelines.
Record
1. Date of Announcement: August 17, Reiwa 8
2. Bidding Execution Date and Time: August 27, Reiwa 8 (Thursday) 10:10 AM
3. Project Name: Project for Extending the Lifespan and Disaster Prevention/Mitigation of Agricultural Waterways, etc.
4. Subject: Improvement of Tochibori Waterway, 2nd Phase Construction
Cut Here
General Competitive Bidding Participation Application Receipt
Applicant: Address, Company Name or Trade Name, Representative's Name
1. Date of Announcement: August 17, Reiwa 8
2. Bidding Execution Date and Time: August 27, Reiwa 8 (Thursday) 10:10 AM
3. Project Name: Project for Extending the Lifespan and Disaster Prevention/Mitigation of Agricultural Waterways, etc.
4. Subject: Improvement of Tochibori Waterway, 2nd Phase Construction
Reception: Aga Town Hall, General Affairs Division, Property Management Section
This work shall be carried out in accordance with the "Niigata Prefecture Agricultural Land Department Civil Engineering Work Standard Specifications" and the attached "Special Specifications".
The items and matters marked with a circle below indicate constraints that will be imposed during construction. If the indicated matters change, or if constraints not indicated arise, the contractor shall consult with the client and take appropriate measures.
Ⅰ. Schedule Related
1. Related separate works exist. Work Name: , Planned Period:
2. Restrictions on construction period, time, and method exist. Period: , Time: , Method:
3. Schedule conditions based on consultation with related organizations exist. Consultation Content: ,
4. Others
Ⅱ. Land Related
1. Unprocessed portions of construction land, etc. exist. Location: , Period:
2. Temporary yard designation, etc. exists. Location: , Period:
3. Others
Ⅲ. Pollution Control Related
1. Pollution prevention restrictions exist (noise, vibration, exhaust gas, dust, water quality, etc.). Construction Method: , Working Hours:
2. Necessity of surveying houses, etc. Method: , Scope:
3. Others
* Machinery specifications shall be for exhaust gas regulated vehicles.
Ⅳ. Safety Measures Related
1. Traffic safety facilities, etc. are designated. (Submission of work performance required)
2. Restrictions on nearby work (railways, gas, water, sewage, electricity, telephone, etc.)
3. Blasting work exists. Safety equipment and personnel: ,
4. Protective facilities (rockfall, avalanche, landslide, etc.)
5. Others
Ⅴ. Construction Road Related
1. Restrictions on the use of general roads as access roads.
2. Occupation of general roads. Period: , Regulation Conditions: , Time Restrictions:
3. Installation of temporary roads. Method: , Land Relations: , Safety Facilities: , "Retention" or "Removal" after completion of construction:
4. Others
Completion Estimated Date
Special Specifications Summary
Construction Conditions Summary
Indicated Items
Indicated Matters
Consultation Content
Construction shall be carried out after the rice harvest, in consultation with farmers and supervisors.
Processing Estimated Time
Section
Traffic Guidance Security
Content
Construction Method Restrictions
Working Hour Restrictions
Protective Measures
Working Hour Restrictions
Usage After Treatment
Method Designation
Other Facilities, etc.
Access Route
Period
VI. Temporary Facilities Related
1. Temporary facilities are designated.
2. Conditions for temporary facilities are designated.
3. Reuse or shared use of temporary structures. Type: , Content:
4. Image enhancement exists. Content:
5. Others
VII. Excess Soil and Industrial Waste Related
As per the attached "Special Specifications for Construction By-products"
VIII. Construction Obstructions
1. Obstruction of existing utility lines (electricity, telephone, water, sewage, gas, etc.) exists. Content: , Method of relocation, removal, protection, etc.: , Period:
2. Overlapping construction of occupied utility lines exists. Content:
3. Others
IX. Drainage Work
1. Special measures for turbidity and groundwater treatment are required (including turbidity treatment). Content:
X. Chemical Injection Related
1. Chemical injection method exists. Content:
XI. Others
1. Site-generated materials exist. Name: , Delivery Location:
2. Supplied materials and loaned items exist. Name: , Delivery Location:
3. Simplification of construction documentation.
4. Others
*Indicated Items
Construction Conditions
This is a small-value construction project, so simplification of construction documentation will be pursued. Submission documents shall be based on the Construction Document Preparation Manual (prepared by Niigata Prefecture Civil Engineering Department), but details should be confirmed with the supervisor.
Submit a construction plan.
1. Use of Recycled Materials: Recycled materials shall be used for the following materials.
2. Use of Construction Generated Soil: Construction generated soil used for embankment, etc. shall be from the following construction projects.
3. Transport of Construction Generated Soil: Construction generated soil generated by this construction project is estimated as follows. When transporting soil to the construction generated soil improvement plant, the above table is for estimation purposes and does not designate the processing facility. Even if the facility assumed by the client differs from the facility proposed by the contractor, it will not be subject to design changes. However, this does not apply to matters not attributable to the contractor, such as changes in site conditions or quantities.
If the receiving party is a construction generated soil improvement plant, write "Plant" in the transport destination column and leave the transport destination name and contact information blank.
4. Transport of Construction Waste: Waste generated by this construction project is estimated as follows.
5. Transport of Turbid Water during Pavement Cutting: Turbid water generated during pavement cutting by this construction project is estimated as follows.
6
7. Except for transporting and disposing of industrial waste oneself, submit a copy of the consignment contract.
8. Consultation:
Viscous Soil
Insufficient Soil
Serita Yard
*Special Specifications for Construction By-products
Recycled Material Name
Specifications
Usage Location
Remarks
Client
Project Name
Origin
Contractor Name/Contact Info
Transport Destination
Remarks
Destination Name
Contact Info
Estimated Transport Distance
Estimated Receiving Time
Temporary Storage Location Available
Remarks
Waste Name to be Transported
Concrete Rubble (Secondary Products)
Asphalt Rubble
Estimated Transport Distance
L=37km
L=39km
Estimated Receiving Time
Estimated Receiving Time
Estimated Receiving Cost
2,700/t
1,500/t
Remarks
*The above table is for estimation purposes and does not designate the processing facility. Even if the facility assumed by the client differs from the facility proposed by the contractor, it will not be subject to design changes. However, this does not apply to matters not attributable to the contractor, such as changes in site conditions or quantities.
Estimated Transport Distance
*The above table is for estimation purposes and does not designate the processing facility. Even if the facility assumed by the client differs from the facility proposed by the contractor, it will not be subject to design changes. However, this does not apply to matters not attributable to the contractor, such as changes in site conditions or quantities.
Construction Generated Soil Improvement Plant
*The above table is for estimation purposes and does not designate the processing facility. Even if the facility assumed by the client differs from the facility proposed by the contractor, it will not be subject to design changes. However, this does not apply to matters not attributable to the contractor, such as changes in site conditions or quantities.
Estimated Receiving Cost
Remarks
For construction projects subject to the Construction Recycling Law, upon completion of recycling of specified construction waste, a report on the completion of recycling shall be submitted in accordance with Article 18 of the Law.
If it is impossible to comply with the above designations and conditions due to unavoidable circumstances that become apparent after the placement of the construction contract, report to the client promptly and consult.
*Material Designation Related
Material name and specifications are designated in the reference materials. The quantities, material names, and material specifications for temporary work in the reference materials are for estimation purposes only, unless otherwise specified in other design documents, and do not constitute a designation.
*Construction Contract Standard Terms and Conditions, etc.
1. Related Works: Article 2 of the Construction Contract Standard Terms and Conditions (hereinafter referred to as "the Terms") concerning related works.
2. Use of Patents, etc.: Article 9 of the Terms concerning patented technologies and other construction methods subject to third-party rights.
3. Inspection of Construction Materials: Inspection in accordance with Article 14, Paragraph 2 of the Terms.
4. Supervisor's Attendance: Attendance in accordance with Article 15 of the Terms.
5. Supplied Materials and Loaned Items: As defined in Article 16 of the Terms.
6. Partial Payment: The items to be subject to partial payment as defined in Article 38 of the Terms shall be all items defined in Article 39 of the Construction Execution Regulations. However, among these, (11) custom-made items will be considered complete when installed on site.