Tenders/Repair Work on Daifukuchi Nishitani No. 3 Bridge
Open🇯🇵JapanWorks

Repair Work on Daifukuchi Nishitani No. 3 Bridge

Auto-translated from Japanese
Original title: 26035大福地西谷3号橋補修工事
広島県竹原市
Published: Jul 24, 2026
Updated: Aug 1, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the architecture and engineering, construction and civil works and transport and logistics sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the architecture and engineering sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Repair Work on Daifukuchi Nishitani No. 3 Bridge Date: July 24, Year 8 1 (1) (2) (3) (4) (5) Days (6) (7) (8) 2 (1) ① ② A B C D E (2) ① ② ③ (3) ① ② ③ ④ Contractor for design services, etc. * A B (5) Takehara City Public Announcement No. 126 We hereby announce that a general competitive tender will be held as follows, in accordance with the provisions of Article 4 of the Takehara City Contract Regulations (Showa 59 Takehara City Ordinance No. 5). In addition to the matters described in this announcement, it is necessary to comply with the attached "Common Matters for General Competitive Tenders (Post-Qualification Review Type) [Construction Work]" (hereinafter referred to as "Common Matters"). Furthermore, this is an electronic bidding project that will be bid using the Hiroshima Prefecture Electronic Bidding System (hereinafter referred to as the "Electronic Bidding System"), and the bidding procedures must be carried out in accordance with the Takehara City Electronic Bidding Implementation Guidelines (hereinafter referred to as the "Electronic Guidelines"). Reiwa Takehara Mayor Akimichi Hirai Details of Procurement Project Name: Repair Work on Daifukuchi Nishitani No. 3 Bridge Project Location: Higashino Town, Takehara City Type of Procurement: Civil Engineering (General) Project Outline: Section repair V=0.52㎥, Concrete strength recovery A=37.3㎡, Surface protection A=37.3㎡, Temporary work N=1 set Scheduled Completion Period: 188 days from the day after the contract signing date Estimated Price: [Publicly Announced in Advance] 19,478,000 yen (excluding consumption tax and local consumption tax) Method of Selecting Successful Bidder: Minimum Reserve Price System Other Necessary Matters: Applicable to projects with a 2-day weekend system. Bidders are expected to hope for this. Eligibility Requirements: In addition to the requirements listed in the Common Matters, all requirements must be met. Requirements for Qualification Certification (Registered Items in the Reiwa 7 & 8 Bid Participation Qualification List) Location of Business Office, etc.: Must have its main business office (head office) in Takehara City. Type of Business Requiring Certification: Certified Business Type: Civil Engineering (General), Qualification Grade: B, Overall Evaluation Score: -, Average Annual Completed Construction Value: Not specified. Permission for Specific Construction Business: - Required Construction Experience for Prime Contractor (Type and Scale): Must be Civil Engineering (General). Completion Period: Must have undergone completion inspection between April 1, Heisei 23 and the day before the bid start date. Construction Location, etc.: Limited to public works, etc. Requirements for Assigned Personnel: Same as Common Matters regarding concurrent positions, etc. Qualifications, etc.: For the business type in 2 (1) (2) A, must fall under Article 7, Item 2, (a), (b), or (c) of the Construction Industry Act. Experience/Track Record: Must have experience as a site supervisor, chief engineer, or supervising engineer in public works, etc. If there is a capital or personnel relationship with the contractor for design services, etc. listed below, participation in the bid is not permitted even if all qualification requirements are met. (Stock Company Nikko Consultant) Capital or personnel relationship refers to the following cases: Capital Relationship: Owns more than half of the total issued shares of the contractor. Personnel Relationship: An officer with representative authority concurrently holds the position of an officer with representative authority of the contractor. Other Necessary Matters: - 3 (1) ① A. Viewing Period: From July 24, Year 8 to August 16, Year 8, until 4:00 PM. B. Viewing Method, etc. ② A. Deadline for Submission of Questionnaires: July 30, Year 8, noon. B. Method of Submitting Questionnaires: If submitting by email or FAX, be sure to confirm receipt of the questionnaire by phone. Email Address: zaisei@city.takehara.lg.jp FAX: 0846-22-8579 ③ A. Answer Viewing Period: From August 3, Year 8, until the end of the design document viewing period. B. Viewing Method, etc. ※ (2) ① Bidding Date: From 9:00 AM on August 17, Year 8, to 4:00 PM on August 18, Year 8. ② Electronic bidding using the Electronic Bidding System. ③ ※ ※ (3) ① Opening Date: August 19, Year 8, 10:00 AM. ※ Attendance is optional. ② At the Takehara City General Affairs Department, Finance Division, Contract Management Section, using the Electronic Bidding System. ③ ※ (4) Qualification Requirement Documents, etc. ① ② Submit necessary documents attached via the Electronic Bidding System. ※ 4. Inquiries (1) Inquiries regarding construction, etc. (2) Inquiries regarding bidding procedures Bidding Schedule Design Documents, etc. Design Document Viewing: Reiwa (Year) Reiwa (Day) Posted on Takehara City website (downloadable). Questions regarding Design Documents, etc.: Reiwa (Thursday) Submit in person, by email, or by FAX to the Takehara City General Affairs Department, Finance Division, Contract Management Section. Submissions in person are accepted from 9:00 AM to 4:00 PM on days other than holidays. Answers to Questions, etc.: Reiwa (Month) Posted on Takehara City website (downloadable). If website viewing is not possible: View at the Takehara City General Affairs Department, Finance Division, Contract Management Section. However, this is only available from 9:00 AM to 4:00 PM on days other than holidays. Note: Design documents are not sold or lent. Bidding: Reiwa (Month) Reiwa (Tuesday) Bidding Method, etc. Construction Cost Breakdown: Submit the construction cost breakdown via the Electronic Bidding System at the time of bidding. [Construction Cost Breakdown] - Fill in the required information as specified by the city based on the estimated price and bid amount. - Submit the cover page with the bidder's address, company name or trade name, project name, and project location. (Note) If performing a written bid as stipulated in the Electronic Guidelines, an official seal is also required. If performing a written bid according to the Electronic Guidelines: Submit the bid form and construction cost breakdown, each sealed in an envelope, to the Takehara City General Affairs Department, Finance Division, Contract Management Section. However, this excludes the period from 4:00 PM on the bidding day to 9:00 AM the following day. Bid Opening Opening Date: Reiwa (Wednesday) Morning Opening Location Notification of Bid Opening Results: A "Request for Submission of Qualification Requirement Documents" will be sent to the successful bidder candidate via the Electronic Bidding System. Notification in case of written bidding according to Electronic Guidelines: After notification by phone, a "Request for Submission of Qualification Requirement Documents" will be sent by FAX or delivered in person. Submission Deadline: By the date and time specified in the "Request for Submission of Qualification Requirement Documents". Submission Method: If submitting in writing, submit to the Takehara City General Affairs Department, Finance Division, Contract Management Section. However, this is only accepted from 9:00 AM to 4:00 PM on days excluding holidays within the submission period. Takehara City Construction Department, Construction Division, Construction Maintenance Section 6-28 Chuo 5-chome, Takehara City [Phone] 0846-22-7746 Takehara City General Affairs Department, Finance Division, Contract Management Section 6-28 Chuo 5-chome, Takehara City [Phone] 0846-22-7731 [FAX] 0846-22-8579 Bid Explanation Document 1. Project Name: Repair Work on Daifukuchi Nishitani No. 3 Bridge 2. Common Matters for Announcement: Posted on Takehara City website (downloadable). 3. Bidding Conditions: (1) Bids must be submitted via the Hiroshima Prefecture/Municipal Joint Electronic Bidding System after thoroughly reviewing the specifications, design documents, drawings, bid explanation document, related documents, and the site. (2) Bidders must agree to the Construction Industry Act, its Enforcement Ordinance, its Enforcement Regulations, Takehara City Contract Regulations, Takehara City Construction Work Execution Regulations, other relevant regulations, and the city's various contract terms and conditions before bidding. (3) Bidders must comply with the Penal Code, the Act on Prohibition of Private Monopolization and Maintenance of Fair Trade, and must not engage in acts that undermine the fairness of bidding. (4) Bidders must not engage in acts that undermine the trust between contract parties, such as carrying out construction through subcontracting agreements that violate the Construction Industry Act, so-called "back joint" contracts, or other inappropriate subcontracting arrangements. (5) In the case of a designated competitive tender, if there is only one bidder, the tender shall be deemed invalid. However, for designated competitive tenders for disaster recovery work, etc., the tender shall be valid even if there is only one bidder. 4. Precautions: The successful bidder shall conclude the contract within 5 days from the date of award. If the approval of the assembly is required, a provisional contract (provisional contract document stating that the main contract will be concluded after approval by the assembly) shall be concluded within 5 days after the award. 5. Necessary Construction Days or Completion Deadline: 188 days 6. Calculation of Minimum Reserve Price: The construction classification for this project is ①. 7. Contract Deposit: The contract deposit shall be 10% or more of the contract amount. 8. Exemption of Contract Deposit, etc.: In accordance with Article 33 of the Takehara City Contract Regulations. 9. Payment Conditions: (1) Advance Payment: If the design amount is 2,000,000 yen or more, up to 40% of the contract amount. (2) Interim Advance Payment: If the design amount is 2,000,000 yen or more, up to 20% of the contract amount. However, this applies only if the design amount is 10,000,000 yen or more and the construction period is 3 months or more, and the interim advance payment is selected instead of partial payment at the time of contract. (3) Partial Payment: Up to 9/10 of the equivalent value of the completed work, limited to one payment. However, this applies only if the design amount is 10,000,000 yen or more and the construction period is 3 months or more, and partial payment is selected instead of interim advance payment at the time of contract. (4) Final Payment Review of Minimum Reserve Price Calculation Method: The minimum reserve price is calculated by applying the following percentages to the amounts (a), (b), (c), and (d) obtained by applying the respective costs that form the basis for calculating the estimated price of the work to the table below, and then summing them up (rounding up to the nearest 1,000 yen). (a) Direct Construction Costs: 97/100 (b) Common Indirect Costs (Cost Build-up + Rate-based): 90/100 (c) Site Management Costs: 90/100 (d) General Management Costs, etc.: 68/100 *1 If the price calculated by the above method is less than 75/100 of the estimated price, it shall be 75/100 (rounding up to the nearest 1,000 yen). If it exceeds 92/100 of the estimated price, it shall be 92/100 (rounding down to the nearest 1,000 yen). *2 For projects that span multiple construction classifications, the minimum reserve price for the entire project will be the sum of the minimum reserve prices calculated for each construction classification. Type of Work: Minimum Reserve Price Calculation Costs Breakdown Direct Construction Costs (a) Common Indirect Costs (b) Site Management Costs (c) General Management Costs, etc. (d) Cost Build-up Rate-based Civil Engineering Works: ① Civil engineering works other than the following: Direct Construction Costs, Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based), Site Management Costs, General Management Costs, etc. ② Steel Bridge Manufacturing: Direct Construction Costs + Material Costs + Manufacturing Costs + Factory Painting Costs + Transportation Costs + Erection Costs, Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based) + Indirect Labor Costs, Site Management Costs + Factory Management Costs, General Management Costs, etc. ③ Electrical (General Construction): Direct Construction Costs + Direct Manufacturing Costs (Equipment Costs x 0.6), Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based) + Indirect Labor Costs (Equipment Costs x 0.1), Site Management Costs + Factory Management Costs (Equipment Costs x 0.2) + Equipment Indirect Costs, General Management Costs, etc. + Equipment Costs x 0.1 ④ Electrical (Steel Tower/Reflector Construction): Direct Construction Costs + Direct Manufacturing Costs (Equipment Costs x 0.6), Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based) + Indirect Labor Costs (Equipment Costs x 0.3), Site Management Costs + Factory Management Costs (Equipment Costs x 0.1) + Equipment Indirect Costs, General Management Costs, etc. ⑤ Mechanical Equipment: Direct Construction Costs + Direct Manufacturing Costs, Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based) + Indirect Labor Costs, Site Management Costs + Factory Management Costs + Installation Indirect Costs + Design Technology Costs, General Management Costs, etc. Building Construction: ⑥ Building (including building mechanical and electrical equipment): Direct Construction Costs x 0.85, Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based), Site Management Costs + Direct Construction Costs x 0.15, General Management Costs, etc. ⑦ Elevator Equipment Construction: For specialized contractors with manufacturing divisions: Direct Construction Costs x 0.8, Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based), Site Management Costs + Direct Construction Costs x 0.2, General Management Costs, etc. Sewerage Works / Waterworks: ⑧ Sewerage Electrical Equipment, Sewerage Mechanical Equipment, Electrical Equipment (Waterworks), Mechanical Equipment (Waterworks): Direct Construction Costs + Equipment Costs x 0.6, Common Indirect Costs (Cost Build-up), Common Indirect Costs (Rate-based) + Equipment Costs x 0.1, Site Management Costs + Installation Indirect Costs + Design Technology Costs + Equipment Costs x 0.2, General Management Costs, etc. + Equipment Costs x 0.1 ⑨ Others: For special cases, regardless of the above calculation method, it will be set within the range of 75/100 to 92/100 of the estimated price. Reiwa 8th Year Specifications Project Name: Road Maintenance Support Project Project Location: Higashino Town, Takehara City Project Name: Repair Work on Daifukuchi Nishitani No. 3 Bridge Project Outline: Section repair V=0.52, Concrete strength recovery A=37.3㎡, Surface protection A=37.3㎡, Temporary work N=1 set [Attached Documents] □ Special Specifications □ Summary of Construction Quantities □ Drawings, etc. Chapter 1 General Provisions Section 1 Application 1. These special specifications apply to the Repair Work on Daifukuchi Nishitani No. 3 Bridge. 2. Matters not described in these special specifications shall be handled as follows: - Civil Engineering Work Common Specifications (August Reiwa 7) Hiroshima Version (Applicable Classification "Hiroshima" and "Hiroshima Prefecture") - Special Specifications (Common Matters) (April Reiwa 8) Hiroshima Prefecture * Civil Engineering Work Common Specifications and Special Specifications (Common Matters) are posted on "Hiroshima Prefecture Procurement Information". https://chotatsu.pref.hiroshima.lg.jp/ Section 2 Intermediate Inspection: This project is subject to intermediate inspection. Implementation shall be in accordance with Chapter 1, General Provisions, Section 2, Intermediate Inspection of the Special Specifications (Common Matters). Section 3 Section 4 Construction By-products 1. Recycling Plan and Recycling Promotion Plan 2. Posting and Publication of Plans 3. Submission of Implementation Plan 4. Construction Site Management System 5. Confirmation of Procedures Related to Laws and Regulations for Construction Waste Soil Export and Creation of Confirmation Result Form (1)(2) The following matters related to the act of bringing construction waste soil into the destination specified in the recycling promotion plan (3) 6. Notification to Haulers 7. Posting and Publication of Confirmation Result Form 8. Storage of Confirmation Result Form The contractor shall store the confirmation result form for 5 years after the completion of the construction work. 9. Request for Delivery of Receipt from Construction Waste Soil Destination (1) Name and location of the destination for construction waste soil (if the destination is a construction site, the name of the construction work). (2) Contractor's company name, trade name, or individual name at the destination of construction waste soil. (3) Name and location of the origin of construction waste soil. (4) Amount of construction waste soil transported. (5) Date of completion of transportation of construction waste soil. 10. Delivery of Receipt to Construction Waste Soil Origin 11. Confirmation of Receipt Contents When the contractor receives a receipt from the destination, they shall confirm that it matches the contents described in the recycling promotion plan. 12. Storage of Receipt The contractor shall store the receipt or a copy thereof for 5 years after the completion of the construction work. 13. Confirmation of Construction Waste Soil to Final Destination (1) Places managed by the national or local government, for which a receipt is issued upon completion of acceptance. (2) Temporary storage at another construction site under the contractor's control for use. (3) Stockyards registered with the national government under the Stockyard Operator Registration Regulations. (4) Construction waste soil receiving sites where the type of soil use indicated on the receipt in item 9 is "Embankment Use, etc." (not to be re-transported). a. If the act requires permission under Article 12, Paragraph 1, Article 16, Paragraph 1, Article 30, Paragraph 1, or Article 35, Paragraph 1 of the Land Development and Regulated Embankment Act (Showa 36, Act No. 191; hereinafter referred to as the "Embankment Regulation Act"), such permission has been obtained. b. If the act requires notification under Article 21, Paragraph 1, Article 27, Paragraph 1, Article 28, Paragraph 1, or Article 40, Paragraph 1 of the Embankment Regulation Act, such notification has been made. In addition to the matters listed in (1) and (2) above, any other matters necessary to confirm the appropriateness of the destination specified in the recycling promotion plan, and other matters related to the transportation of construction waste soil. If the contractor creates a recycling plan and a recycling promotion plan, they must promptly submit a recycling implementation plan and a recycling promotion implementation plan, which record the implementation status, to the supervisor after the completion of the work.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on July 24, 2026. Last refreshed today. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 広島県竹原市

広島県竹原市 has issued 15 procurement notices on BidsFactory, including 6 currently open and 2 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: July 31, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by 広島県竹原市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

広島県竹原市
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.