Tenders/Osaka International Airport 2nd TX Building Air Conditioning Equipment Installation Work
Open🇯🇵JapanWorks

Osaka International Airport 2nd TX Building Air Conditioning Equipment Installation Work

Auto-translated from Japanese
Original title: 大阪国際空港第2TX局舎空気調和設備工事
国土交通省大阪航空局
Published: Jul 31, 2026
Updated: Aug 6, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the construction and civil works, architecture and engineering and energy and power sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Osaka International Airport 2nd TX Building Air Conditioning Equipment Installation Work BID NOTICE We hereby announce that we will conduct an open competitive bid as follows. July 31, Reiwa 8 Acting Disbursing Officer: Kazunori Unno, Deputy Director, Osaka Regional Civil Aviation Bureau 1. Work Overview: (1) Work Name: Osaka International Airport 2nd TX Building Air Conditioning Equipment Installation Work (Electronic Bidding and Electronic Contract) (2) Work Location: 154-1 Nishi-kuwazu, Itami City, Hyogo Prefecture (Osaka International Airport 2nd TX Building) (3) Work Details: This work involves replacing the following aging air conditioning equipment. Osaka International Airport 2nd TX Building Building Overview: Reinforced concrete, single-story building. Target Equipment: Air conditioning equipment for air traffic control system, Radio equipment room (air-conditioned area 47㎡) - Air-cooled package air conditioner: 2 units - Power control panel: 1 unit * Includes equipment transportation and installation, piping, power equipment, automatic control equipment, remote monitoring and control equipment, insulation, comprehensive test runs and adjustments, temporary work, and other related work, as well as removal. * Removed items are the responsibility of the contractor. (4) Work Period: From the weekday following the contract conclusion date until March 12, Reiwa 9. (5) This work is subject to electronic bidding and contracting through the Electronic Procurement System. However, those who find it difficult to use the Electronic Procurement System may, with the approval of the client, use paper bidding and paper contracting methods. (6) This work is subject to the comprehensive evaluation and bidding method (construction capability evaluation type (Type I)) which determines the successful bidder by comprehensively evaluating factors other than price. (7) This work is a trial project for the contract VE method, which accepts proposals on construction methods, etc., after the contract is concluded. (8) This work is subject to the bid-time quantity calculation document utilization method. Details are provided in the bid explanation booklet. (9) This work is subject to evaluation based on the Civil Aviation Bureau Construction Performance Evaluation Guidelines when the contractor makes technical proposals regarding construction rationalization technologies (excluding those specified by the client) during construction and their effectiveness is confirmed. (10) This work does not permit the assignment of a supervising engineer who falls under the provisions of Article 26, Paragraph 3, Proviso of the Construction Industry Act (hereinafter referred to as "Special Supervising Engineer"). (11) This work includes additional points in the comprehensive evaluation for companies that implement wage increases. (12) This work includes additional points in the comprehensive evaluation for companies certified under laws and regulations as promoting work-life balance, etc. (WLB promotion companies). Details are provided in the bid explanation booklet. 1 (13) This work is subject to a labor cost dumping investigation. Details are provided in the bid explanation booklet. 2. Competitive Participation Qualifications: (1) Must not fall under the provisions of Article 70 of the Cabinet Order on Budget, Settlement, and Accounting (hereinafter referred to as "Budgetary Order"). Minors, persons under guardianship, or persons under assistance who have obtained the necessary consent for contract conclusion may be applicable under special circumstances in the said article. (2) Must not fall under the provisions of Article 71 of the Budgetary Order. (3) Must be graded in grade A for "Pipework" in the "FY2025, 2026 Ministry of Land, Infrastructure, Transport and Tourism General (Nomination) Competitive Participation Qualification" as of the bid opening date, and have competitive participation qualifications in the Osaka Regional Civil Aviation Bureau. (For those who have filed for commencement of rehabilitation proceedings under the Company Rehabilitation Act (Law No. 154, Reiwa 14) or for commencement of reorganization proceedings under the Civil Rehabilitation Act (Law No. 225, Reiwa 11), re-certification of general competitive participation qualifications in accordance with procedures separately determined by the Director of the Osaka Regional Civil Aviation Bureau, Ministry of Land, Infrastructure, Transport and Tourism, after the decision to commence proceedings has been made.) Those who do not have the said qualification will be accepted for application for competitive participation qualifications through the application methods described in the "Public Notice on Qualifications of Competitive Bidders" (Official Gazette dated October 1, Reiwa 6). (4) Must not be a party who has filed for commencement of rehabilitation proceedings under the Company Rehabilitation Act or for commencement of reorganization proceedings under the Civil Rehabilitation Act. However, this does not apply to those who have obtained re-certification as mentioned in (3). (5) Must not be subject to suspension of nomination, etc., by the Director of the Osaka Regional Civil Aviation Bureau under the "Standards for Measures Regarding Suspension of Nomination, etc., for Contractual Construction Work under the Jurisdiction of the Civil Aviation Bureau" (Air Bureau Notification No. 386, June 28, Reiwa 59) during the period from the submission deadline of the competitive participation qualification application (hereinafter referred to as "Application") and competitive participation qualification confirmation documents (hereinafter referred to as "Documents") to the bid opening date. (6) There shall be no capital or personnel relationship between the bidders (or their constituent members in the case of a joint venture). Note that contacting parties for the purpose of deciding on withdrawal when such relationships exist does not conflict with the provisions of Article 4, Paragraph 3, Item 2 of the "Kokudo Kotsu Sho Koku Kyoku Kyoso Keiyaku Nyusatsusha Kokoroe" (Kokudo Kotsu Sho Aviation Bureau Competitive Contract Bidder Handbook). (7) Must not be a party who has been requested by the police authorities to be excluded from public works, etc., of the Ministry of Land, Infrastructure, Transport and Tourism as a business substantially controlled by a gangster or equivalent, and this situation must not be ongoing. (8) Must not be the contractor of the design work, etc., for the said work, or a construction company related to the said contractor in terms of capital or personnel (for details, refer to the bid explanation booklet). (9) Must meet all competitive participation qualification requirements separately determined by the Disbursing Officer, Director of the Osaka Regional Civil Aviation Bureau, in accordance with Article 73 of the Budgetary Order (for details, refer to Attached Document 1 "Competitive Participation Qualification Requirements"). (10) Must have received the bid explanation booklet or downloaded it from the Electronic Procurement System. 3. Bidding Procedures, etc.: (1) Responsible Department: As per Table 1. (2) URL and Contact Information for the Electronic Procurement System: Electronic Procurement System 2 https://www.p-portal.go.jp/pps-web-biz/ Procurement Portal/Electronic Procurement System Help Desk Telephone Number: 0570-000-683 (Navi Dial) 03-4332-7803 (for IP phones, etc.) (3) Period and Method of Bid Explanation Booklet Delivery: As per Table 1. (4) Period, Location, and Method of Submission of Application and Documents: As per Table 1. (5) Date, Time, Location, and Method of Bid and Bid Form Submission: As per Table 1. 4. Other: (1) Language and Currency Used in Procedures: Japanese and Japanese currency only. (2) Bid Bond and Contract Deposit: 1) Bid Bond: Exempt. 2) Contract Deposit: Must be paid. However, payment of the contract deposit may be substituted by providing interest-bearing national bonds or a guarantee from a financial institution, etc. Furthermore, if a performance guarantee bond for public works is provided or a performance guarantee insurance contract is concluded, the payment of the contract deposit will be exempted. Details are provided in the bid explanation booklet. (3) Invalid Bids: Bids submitted by persons who do not meet the competitive participation qualifications stated in this announcement, bids with false statements in the application or documents, and bids that violate the bidding conditions are invalid. (4) Determination of Successful Bidder: The successful bidder will be the one who submits a bid price within the limit of the estimated price and has the highest evaluation score through comprehensive evaluation. However, if the prospective successful bidder's bid price is such that there is a risk that the contract content cannot be performed in accordance with the contract, or if it is deemed significantly inappropriate due to the risk of disrupting the order of fair trade to conclude a contract with that person, the bidder with the next highest evaluation score among other bidders who submitted bids within the limit of the estimated price may be selected as the successful bidder. If the prospective successful bidder's bid price falls below the investigation standard price based on Article 85 of the Budgetary Order, an investigation under Article 86 of the Budgetary Order will be conducted. (5) Confirmation of Assigned Chief (or Supervising) Engineer: If a violation of the専任制 (full-time assignment) of the assigned engineer is confirmed by CORINS, etc., after the successful bidder is determined, the contract may not be concluded. Replacement of the application is not permitted except in cases approved as unavoidable due to various circumstances. (6) For works requiring the full-time assignment of a chief (or supervising) engineer, and when concluding a contract at a price below the investigation standard price, a technical expert with equivalent qualifications may be required in addition to the full-time chief (or supervising) engineer (refer to the bid explanation booklet). (7) Negotiation during Procedures: None. (8) Requirement for Contract Creation: Required. This project is subject to electronic transfer of documents related to contract procedures through the Electronic Procurement System. However, if it is difficult to use the Electronic Procurement System, a "Paper Contract Method Acceptance Request" must be submitted to use the paper contract method. 3 (9) Whether there is a plan to conclude a separate contract with the successful bidder for other works directly related to this work: None. (10) Participation by those who have not received general competitive participation qualification certification: Those who have not received the general competitive participation qualification certification mentioned in 2.(3) may also submit an application and documents in accordance with 3.(4), but to participate in competitive bidding, they must have received the qualification certification by the time of bid opening. (11) Contract VE Proposal: After the contract is concluded, the contractor may propose changes to the specifications that would reduce the contract amount without lowering the functions or performance of the contracted work. If the proposal is deemed appropriate, the specifications will be changed, and if necessary, the contract amount will be adjusted. Details are provided in the special specifications, etc. (12) Notes on Construction Plan: If a construction plan is not submitted during the qualification examination, or if it is deemed to have been created through consultation with other bidders regarding this work, or if the content of the construction plan is deemed inappropriate, competitive participation qualification will not be granted. (13) Other: Details are provided in the bid explanation booklet. 4 (Bid Notice) Attached Document 1: Competitive Participation Qualification Requirements Project Name: Osaka International Airport 2nd TX Building Air Conditioning Equipment Installation Work Bid Notice 2.(9) "Must meet all competitive participation qualification requirements separately determined by the Disbursing Officer, Director of the Osaka Regional Civil Aviation Bureau, in accordance with Article 73 of the Budgetary Order." refers to the following items: (1) Construction Experience: Must have construction experience in the following works completed and delivered between April 1, Reiwa 23 and the date of this announcement (Private sector experience and overseas experience certified by the Overseas Infrastructure Project Engineer Certification/Award System are also acceptable). Limited to experience as the prime contractor. For experience as a member of a joint venture under Type A agreement, it is limited to cases where the investment ratio is 20% or more. For experience under Type B agreement, only experience in the work content divided among the joint venture members will be recognized, regardless of the investment ratio. If construction performance evaluation has been notified for works ordered by the Ministry of Land, Infrastructure, Transport and Tourism and the Okinawa General Bureau of the Cabinet Office, works with an evaluation score of less than 65 points are excluded. [Construction Experience]: Air conditioning equipment installation work. However, minor works (contract amount less than 5 million yen) are excluded. (2) Qualifications of Assigned Personnel, etc.: Must be able to assign a chief engineer or supervising engineer who meets the following criteria to this work on a full-time basis. However, if Article 26, Paragraph 3 of the Construction Industry Act does not apply, full-time assignment is not required. 1) Must have qualifications such as Class 1 or Class 2 Pipework Construction Management Engineer, or equivalent. 2) Must have experience in the works listed in (1). The experience does not need to be for the same work as the company's construction experience. 3) For supervising engineers, must possess a Supervising Engineer's Certificate and a Supervising Engineer Training Completion Certificate. 4) Must have a direct and continuous employment relationship with the bidder and be able to present documentation proving it. 5) Periods during which full-time assignment of a chief engineer or supervising engineer is not required are as follows: ① Period from contract conclusion until commencement of on-site construction. (Period until the site office is set up, materials are delivered, or temporary work begins.) The date of commencement of on-site construction will be determined through consultation with the supervisor after the contract conclusion. ② Period after project completion, inspection, and only administrative procedures and cleanup remain. The date of completion of inspection is the date when the client notifies the contractor of the confirmation of project completion (e.g., date on "Completion Inspection Confirmation Notice"). 6) This work does not permit the assignment of a Special Supervising Engineer. (3) Technical findings regarding the construction plan must be appropriate. If there is no description or the content is significantly inappropriate, competitive participation qualification will not be granted. (4) For pipework ordered by the Osaka Regional Civil Aviation Bureau and its branch offices (offices of regional civil aviation bureaus as stipulated in Article 39, Paragraph 1 of the Ministry of Land, Infrastructure, Transport and Tourism Establishment Act), if there is construction experience with a notified construction performance evaluation for works completed between April 1, Reiwa 6 and the date of this announcement, the average construction performance evaluation score for these works must be 65 points or higher. Table 1: Bidding Schedule, etc. Project Name: Osaka International Airport 2nd TX Building Air Conditioning Equipment Installation Work 3.(1) Delivery Method: July 31, Reiwa 8 to August 24, Reiwa 8 Submission Location: Same as the responsible department above. Submission Method: Bid Date/Time (Electronic Bidding System): September 15, Reiwa 8 (Between 9:00 AM and 5:00 PM). Bid Date/Time (Paper Bidding): September 15, Reiwa 8 (Between 9:00 AM and 5:00 PM). Submission Method: Bid Opening Date/Time: September 16, Reiwa 8 Bid Opening Location: 16:00 PM Osaka Regional Civil Aviation Bureau, 11th Floor, Bidding Room 1) Delivered via the Electronic Procurement System. 2) If it is impossible to obtain through the above delivery method due to unavoidable reasons, please contact the responsible department. Application and Document Submission Period, Location, and Method: Application Submission Period: (Excluding Saturdays, Sundays, and holidays, daily from 9:00 AM to 5:00 PM. However, until 2:00 PM on the final day.) Submission of applications and documents will be done via the Electronic Procurement System. However, if paper bidding is approved by the client, it can be submitted in person or by mail (registered mail only; must arrive within the submission period) or by courier (equivalent to registered mail; must arrive within the submission period) to the submission location. Bid Explanation Booklet Delivery Period and Method: Delivery Period: July 31, Reiwa 8, 9:00 AM to August 21, Reiwa 8, 5:00 PM 3.(3)

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on July 31, 2026. Last refreshed today. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 国土交通省大阪航空局

国土交通省大阪航空局 has issued 124 procurement notices on BidsFactory, including 41 currently open and 15 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 5, 2026.

Frequently asked questions about this tender

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 国土交通省大阪航空局 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

国土交通省大阪航空局
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.