Tenders/Snowbreak Fence Erection and Storage Work (Section 3)
Open🇯🇵JapanWorks

Snowbreak Fence Erection and Storage Work (Section 3)

Auto-translated from Japanese
Original title: 防雪柵張出・収納工事(第3工区) [その他のファイル/1.67MB]
青森県おいらせ町
Published: Sep 11, 2026
Updated: Sep 16, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the architecture and engineering and transport and logistics sectors, with a focus on Quantity Surveying, Transport Policy and Traffic Management. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the architecture and engineering sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Snowbreak Fence Erection and Storage Work (Section 3) Reiwa 8 (2026) Snowbreak Fence Erection and Storage Work (Section 3) Work Number: No. 99 Route Name: Aomori Prefecture, Oirase Town, Nakano-daira/Misawa Line Construction Site: Uzurakuboyama, etc. Location Map Drawing Number: Ha-Chu Location Map Do not block roads. Do not block roads. Section 1: Snowbreak Fence Installation Length L = 1,360m Section 2: Snowbreak Fence Installation Length L = 1,376m Section 3: Snowbreak Fence Installation Length L = 1,271m Length subject to this work: L = 789m Length subject to this work: L = 869m Length subject to this work: L = 871m Snowbreak Fence Erection and Storage Work (Section 3) Summary Table Expense Item / Work Type / Classification / Detail Quantity Unit Unit Price Amount Detail Unit Price Number Standard Construction Cost 1 Lot Main Construction Cost 1 Lot Road Maintenance Work 01 1 Lot Total Oirase Town 1 Snowbreak Fence Erection and Storage Work (Section 3) General Expenses Setting Information Name Value [Weekly Holiday 2-Day Correction] No correction [Work Section Name: Road Maintenance Work 01] [Work Type] Road Maintenance Work [Main Item] Construction Area General Traffic Impact: Yes (2)-1 Advance Payment Disbursement Ratio Category: Exceeding 35% and not exceeding 40% Correction for Contract Guarantee: If the contracting authority requires monetary guarantee Fixed to previous amount Not fixed to previous amount [Common Temporary Work Costs] Rate Specification: Not specified Weighted average of correction factors Rounding: Round to 3 decimal places, stop at 2nd place [Site Environment Improvement Costs] Site Environment Improvement Cost Calculation Category: Not calculated [Site Management Costs] Rate Specification: Not specified Correction based on construction period and work period: Yes Winter Correction: Level 4 Heatstroke Correction: No Emergency Work Correction: No Weighted average of correction factors Rounding: Round to 3 decimal places, stop at 2nd place [General Management Costs, etc.] Rate Specification: Not specified Construction Price Rounding Adjustment: Round to nearest 10,000 yen [Indirect Labor Costs] [Factory Management Costs] [Increased Costs Due to Extension of Construction Period, etc.] Increased Costs Due to Extension of Construction Period, etc. Calculation Category: Not calculated [Consumption Tax] Oirase Town 2 Snowbreak Fence Erection and Storage Work (Section 3) General Expenses Setting Information Name Value (Transitional Measures) Multiple Tax Rates Applicable: No Oirase Town 3 Snowbreak Fence Erection and Storage Work (Section 3) Main Construction Cost Breakdown Expense Item / Work Type / Classification / Detail Quantity Unit Unit Price Amount Detail Unit Price Number Standard Road Maintenance Work 01 1 Lot Road Maintenance 1 Lot Road Cleaning Work 1 Lot Drainage Facility Cleaning Work 1 Lot Gutter Cleaning (Manual) 100 m Specification 1 Weeding Work 1 Lot Road Weeding Work 1 Lot Weeding 870 m2 Specification 2 Winter Countermeasure Facility Work 1 Lot Winter Safety Facility Work 1 Lot Snowbreak Fence On-site Erection/Storage 871 m Specification 3 Snowbreak Fence On-site Erection/Storage 871 m Specification 4 Oirase Town 4 Snowbreak Fence Erection and Storage Work (Section 3) Main Construction Cost Breakdown Expense Item / Work Type / Classification / Detail Quantity Unit Unit Price Amount Detail Unit Price Number Standard Temporary Work 1 Lot Traffic Management Work 1 Lot Traffic Guidance Guard 22 person-days Specification 5 Direct Construction Cost Total Common Temporary Work Costs Total 1 Lot Common Temporary Work Costs (Rate-based) 1 Lot Common Temporary Work Costs Rate 1 Lot Net Construction Cost 1 Lot Site Management Costs 1 Lot Construction Cost 1 Lot General Management Costs, etc. 1 Lot Construction Price 1 Lot Oirase Town 5 Snowbreak Fence Erection and Storage Work (Section 3) Main Construction Cost Breakdown Expense Item / Work Type / Classification / Detail Quantity Unit Unit Price Amount Detail Unit Price Number Standard Consumption Tax Equivalent Amount 1 Lot Total Oirase Town 6 Snowbreak Fence Erection and Storage Work (Section 3) [Specification No. 1] Gutter Cleaning (Manual) per 1 meter Name / Specification Quantity Unit Unit Price Amount Detail Unit Price Number Standard Gutter Cleaning (Manual Cleaning Work) Uncovered 1 m Specification 1 Total per unit Oirase Town 7 Snowbreak Fence Erection and Storage Work (Section 3) [Specification No. 2] Weeding per 1 m2 Name / Specification Quantity Unit Unit Price Amount Detail Unit Price Number Standard Weeding Shoulder-mounted type, with stone guard 1 m2 Specification 2 Total per unit Oirase Town 8 Snowbreak Fence Erection and Storage Work (Section 3) [Specification No. 3] Snowbreak Fence On-site Erection/Storage per 1 meter Name / Specification Quantity Unit Unit Price Amount Detail Unit Price Number Standard Snowbreak Fence On-site Erection 4.3m or less (blowing type/stopping type) 1 m Specification 3 Total per unit Oirase Town 9 Snowbreak Fence Erection and Storage Work (Section 3) [Specification No. 4] Snowbreak Fence On-site Erection/Storage per 1 meter Name / Specification Quantity Unit Unit Price Amount Detail Unit Price Number Standard Snowbreak Fence On-site Storage 4.3m or less (blowing type/stopping type) 1 m Specification 4 Total per unit Oirase Town 10 Snowbreak Fence Erection and Storage Work (Section 3) [Specification No. 5] Traffic Guidance Guard per 1 person-day Name / Specification Quantity Unit Unit Price Amount Detail Unit Price Number Standard Traffic Guidance Guard B 1 person-day Specification 5 Total per unit Oirase Town 11 Snowbreak Fence Erection and Storage Work (Section 3) [Construction Unit Price Table No. 1] Traffic Guidance Guard B per 1 person-day Name / Specification Quantity Unit Unit Price Amount Detail Unit Price Number Standard Traffic Guidance Guard B person Miscellaneous Expenses (Rounding) 1 Lot Total per unit Oirase Town 12 Snowbreak Fence Erection and Storage Work (Section 3) [Construction Package No. 1] Gutter Cleaning (Manual Cleaning Work) Uncovered per 1 meter Name / Specification Amount Composition Ratio (%) Amount Composition Ratio (%) Standard Area Unit Price Estimated Area Unit Price Detail Unit Price Number Standard [Labor] General Laborer Foreman [Rounding] [Condition] [J1] = 1 Gutter Lid Specification: Uncovered Oirase Town 13 Snowbreak Fence Erection and Storage Work (Section 3) [Construction Package No. 2] Weeding Shoulder-mounted type, with stone guard per 1 m2 Name / Specification Amount Composition Ratio (%) Amount Composition Ratio (%) Standard Area Unit Price Estimated Area Unit Price Detail Unit Price Number Standard [Machinery] Brush cutter, shoulder-mounted, cutter diameter 255mm [Labor] Specialized Laborer General Laborer Foreman Others (Labor) [Rounding] [Condition] [J1] = 1 Work Type: Shoulder-mounted [J2] = 1 Stone Guard: With stone guard Oirase Town 14 Snowbreak Fence Erection and Storage Work (Section 3) [Construction Package No. 3] Snowbreak Fence On-site Erection 4.3m or less (blowing type/stopping type) per 1 meter Name / Specification Amount Composition Ratio (%) Amount Composition Ratio (%) Standard Area Unit Price Estimated Area Unit Price Detail Unit Price Number Standard [Labor] General Laborer Foreman Others (Labor) [Rounding] [Condition] [J1] = 1 Work Classification: Erection [J2] = 1 Snowbreak Fence Height (Type): 4.3m or less (blowing type/stopping type) Oirase Town 15 Snowbreak Fence Erection and Storage Work (Section 3) [Construction Package No. 4] Snowbreak Fence On-site Storage 4.3m or less (blowing type/stopping type) per 1 meter Name / Specification Amount Composition Ratio (%) Amount Composition Ratio (%) Standard Area Unit Price Estimated Area Unit Price Detail Unit Price Number Standard [Labor] General Laborer Foreman Others (Labor) [Rounding] [Condition] [J1] = 2 Work Classification: Storage [J2] = 1 Snowbreak Fence Height (Type): 4.3m or less (blowing type/stopping type) Oirase Town 16 = = = Road Weeding Work 870.00 Quantity Calculation Sheet Snowbreak Fence Erection and Storage Work (Section 3) Upper part shows changes from the original. Work Type / Classification / Detail / Specification / Unit / Quantity Road Cleaning Work Drainage Facility Cleaning Work Gutter Cleaning (Manual) Uncovered m 100.0 Winter Countermeasure Facility Work Winter Safety Facility Work Weeding (Shoulder-mounted type) m2 870.0 Snowbreak Fence Erection Work m 871.0 Snowbreak Fence Storage Work m 871.0 - 1 - Quantity Calculation Sheet Snowbreak Fence Erection and Storage Work (Section 3) Upper part shows changes from the original. Work Type / Classification / Detail / Specification / Unit / Quantity = Daytime, 8 working hours, no shift personnel Name x Days = Person-days Temporary Work 871.00 11.0 22 Traffic Guidance Guard B Daytime, 8 working hours, no shift personnel 2 person-days 22.0 Traffic Management Work - 2 - Work Number: No. 99 Reiwa 8 (2026) Snowbreak Fence Erection and Storage Work (Section 3) Special Specifications Oirase Town, Uzurakuboyama, etc. Oirase Town, Regional Development Division 1. Application of Common Specifications This work shall be carried out in accordance with the "Common Specifications" established by the Aomori Prefectural Government, Civil Engineering Department, and these Special Specifications. If any matters not described in the specifications arise, appropriate measures shall be taken in consultation with the supervisor. 2. Snowbreak Fence Erection The contractor shall complete the snowbreak fence erection work by December 20, Reiwa 8 (2026). However, if completion is not possible for unavoidable reasons, consultation shall be held separately. 3. Snowbreak Fence Storage The contractor shall complete the snowbreak fence storage work by March 31, Reiwa 9 (2027). Storage shall commence upon instruction from the supervisor, but early storage may be required depending on the agricultural work status of the land adjacent to the snowbreak fence installation site, so adjustments should be made accordingly. 4. Procedures with Government and Public Offices For the execution of the work, the contractor shall submit an application for permission to use the road to the Misawa Police Station and a notification of road work to the Oirase Fire Department. Additionally, procedures shall be carried out with other relevant organizations as necessary. 5. Safety Management Traffic control personnel shall be assigned during construction. 6. Delivery and Return of Materials (Bolts, Pins) Materials (bolts, pins) used for the work shall be delivered to and returned at the garage of the town hall main building. If there are any insufficient materials, the supervisor shall be promptly reported. 7. Interim Report and Confirmation Upon completion of the erection work, the contractor shall promptly report to the supervisor and receive confirmation. 8. Inspection and Maintenance of Snowbreak Fences The contractor shall conduct inspections on the following items and report the results to the supervisor. Inspection timing shall be at the discretion of the supervisor. (1) Looseness of joints, connecting hardware, etc. (2) Condition of each component 9. Other Matters Design changes may be discussed if areas not to be stored this year are specified. 10. Documents to be Submitted The contractor shall submit the documents listed in the table below. Electronic data submission is not required. 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy 1 copy Accident Report: As needed Other: As instructed by the supervisor Construction Industry Retirement Mutual Aid Association Premium Payment Notice (for the ordering party): At the time of contract conclusion or within 1 month after contract conclusion if there are circumstances. Invoice Work Meeting Minutes: As needed Construction Photos: Within 5 days of completion and as needed Resume: At the start of work and upon changes Completion Report: After passing the completion inspection Work Start Notification: Within 14 days of contract conclusion Delivery Slip: After passing the completion inspection Name Submission Deadline Work Progress Report Site Agent Notification: At the start of work Remarks Within 5 days of completion CORINS Registration Content Confirmation: Promptly upon receipt of confirmation At the start of work Ten Billion Hundred Million Ten Billion Million Hundred Thousand Ten Thousand Hundred Ten Yen Estimated Price: ¥4,961,000 Ten Billion Hundred Million Ten Billion Million Hundred Thousand Ten Thousand Hundred Ten Yen Minimum Limit Price Ten Billion Hundred Million Ten Billion Million Hundred Thousand Ten Thousand Hundred Ten Yen Low Bid Price Ten Billion Hundred Million Ten Billion Million Hundred Thousand Ten Thousand Hundred Ten Yen Investigation Standard Price Bid Opening Date: Contract Number: Serial Number: Project Name 417 Mayor Estimated Price Statement Ten Billion Hundred Million Ten Billion Million Hundred Thousand Yen Bid Comparison Price [Excluding Tax of Minimum Limit Price] Ten Yen Bid Comparison Price [Excluding Tax of Estimated Price] * To be used when setting a minimum limit price. Ten Billion Hundred Million Ten Billion Million Hundred Thousand Yen Bid Comparison Price [Excluding Tax of Low Bid Price Investigation Standard Price] September 30, Reiwa 8 (2026) 99 Snowbreak Fence Erection and Storage Work (Section 3) * To be used when setting a low bid price investigation standard price. Ten Billion Hundred Million Ten Billion Million Hundred Thousand Yen 256256182 1 Oirase Town Public Notice No. 72 As follows, conditional general competitive bidding will be conducted, and in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act Enforcement Order (Cabinet Order No. 16 of 1947), the following is hereby announced. September 11, Reiwa 8 (2026) Oirase Town Mayor, Mitsuhisa Narita 1. Matters for Bidding Name: No. 99 Snowbreak Fence Erection and Storage Work (Section 3) Location: Oirase Town, Uzurakuboyama, etc. Type: Civil Engineering (General) Work Outline: Snowbreak Fence Erection Work: 871m Snowbreak Fence Storage Work: 871m Construction Period: From the day after the contract is concluded until March 31, Reiwa 9 (2027) Estimated Price: ¥4,961,000 (including consumption tax and local consumption tax) 2. Bid Participation Qualifications Bidders who can participate in the bidding for the work based on this announcement must meet all of the following requirements. Bid Participation Format: Individual Basic Requirements: (1) Not falling under the persons stipulated in Article 167-4, Paragraph 1 of the Local Autonomy Act Enforcement Order (hereinafter referred to as "the Order"). (2) Not a person recognized as falling under any of the items in Article 167-4, Paragraph 2 of the Order, for whom three years have not passed since the fact occurred, and not using such a person as an agent, manager, or other employee. (3) In the case of construction work, must have obtained a construction business permit based on the provisions of Article 3 of the Construction Industry Act (Law No. 100 of 1949; hereinafter referred to as "the Act"). (4) In the case of construction work, must have undergone the management performance review stipulated in Article 27-23 of the Act (hereinafter referred to as "management performance review") and its validity period must not have expired. (5) Must not be within the period of suspension of bidding based on the "Oirase Town Competitive Bidding Participant Qualification Suspension Guidelines" (Oirase Town Notice No. 49 of 2017). (6) Not a person for whom a petition for commencement of rehabilitation proceedings under the Company Rehabilitation Act (Law No. 154 of 2002) or a petition for commencement of reconstruction proceedings under the Civil Reconstruction Act (Law No. 225 of 1999) has been filed. However, this does not apply to cases where re-certification of bidding qualifications has been obtained after the decision to commence rehabilitation or reconstruction proceedings. (7) Must not be a construction company substantially controlled by a member of a violent group or equivalent, for whom a request for exclusion from public works has been made to the Mayor by the police authorities, and such state continues. Regional Requirements: Must have its head office in Oirase Town. 2. Registered Work Type Classification Grade Construction Permit Comprehensive Evaluation Score In accordance with the provisions of Article 3 of the "Oirase Town Competitive Bidding Qualification Review and Contractor Selection Regulations," registered in the Oirase Town Bidding Participant Qualification List for the corresponding work type, possessing the classification grade for that work type and the corresponding permit under the Act, and having a total score of the comprehensive evaluation score in the management performance review stipulated in Article 27-23, Paragraph 1 of the Act, plus the subjective scores defined in the Oirase Town Competitive Bidding Qualification Review Standards, equal to or higher than the following points. Registered Work Type Classification Grade Construction Permit Total Score Civil Engineering (General) A or B Specified or General Not specified Construction Experience: No requirement for construction experience.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on September 11, 2026. Last refreshed 4 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 青森県おいらせ町

青森県おいらせ町 has issued 47 procurement notices on BidsFactory, including 10 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Transport & Logistics, and Architecture & Engineering Services. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: September 11, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by 青森県おいらせ町 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

青森県おいらせ町
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.