3 Road interventions of the Infrastructure, Public Space, and Social Development Project with Citizen Prioritization (IEPDSPC) in the parishes of Argelia, Ferroviaria, and La Mena AZEA
About This Opportunity
TranslatedThree road interventions for infrastructure, public space, and social development with citizen prioritization in Argelia, Ferroviaria, and La Mena parishes.
This is a works contract in the transport and logistics, construction and civil works and energy and power sectors. Located in Ecuador, Latin America, this opportunity is open to firms and consortiums, with an estimated budget of USD 257,988.
Published through SERCOP Ecuador, a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the transport and logistics sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. This contract has already been awarded. The information is published for transparency and market intelligence purposes.
Description
Original language: SpanishCódigo de proceso: LICO-MDMQ-2025-403-41357
3 INTERVENCIONES VIALES DEL PROYECTO INFRAESTRUCTURA, ESPACIO PÚBLICO Y DESARROLLO SOCIAL CON PRIORIZACIÓN CIUDADANA “IEPDSPC” EN LAS PARROQUIAS DE ARGELIA, FERROVIARIA, Y LA MENA, AZEA
Ítems requeridos:
ROTULO LONA 13 ONZAS DESCR. OBRA ANTES Y DESPUES 2 LONAS 2.40 x 1.20 m Marco tubo cuad. 1 1/2-x1.5mm, par. t. cuad.100x3mm, pintura de secador rápido 1m, pint. sint. autom. 2m, gigan. lona 13onz, con inst. de 2 lonas de antes y despues. Incluye instalación. - Cantidad: 1 Unidad (USD 455.62)
ÁRBOLES GRANDES GRUPO 2 DE 1.51 A 1.70m PROMEDIO EN SITIO. Inc. excavación de hueco, transporte y sembrado. No inc. abono. Especies: molle, yaloman, flor de mayo, trueno árbol, pino vela, ficus. - Cantidad: 3 Unidad (USD 29.47)
IMPERMEABILIZACION CON LAMINA DE ASFALTO MODIF. CON POLÍMEROS Instalada al calor, soplete a gas. Colocación inc. traslape 7cm. - Cantidad: 35 Metro Cuadrado (USD 17.68)
AREA ENCESPADA ENCHAMBADA 2063 Transporte 10Km, coloc.chamba, mantenimiento - Cantidad: 10 Metro Cuadrado (USD 3.48)
JARDINERIA-VARIAS ESPECIES 30 UNIDADES siembra de plantas,30 u/m2,varias especies - Cantidad: 10 Metro Cuadrado (USD 31.27)
ANCLAJE EN CONGLOMERADO CON PERNO AUTOPERFORANTE DIAM.EXT.=25mm. INCLUYE INYECC. DE MORTERO EXPANSIVO. Incluye perforación diam. = 25mm, planchuela cónica R25, tuerca R25, capuchón, mortero expansivo, aditivo superplastificante, anclaje en talud, canastilla y equipo de seguridad. Cabezal de tensado aplicado 2 manos de anticorrosivo y engrasado. - Cantidad: 36 Metro (USD 62.88)
DRENES PVC NORMAL 110mm MICHINALES 606-21. - Cantidad: 50 Metro (USD 6.59)
MANGUERA PVC 1/2- CABLEADO ELECTRICO Para cableado electrico, instalada - Cantidad: 200 Metro (USD 0.56)
PASAMANO TUBO 2-, 2 HILERAS,PARANTE TUBO Parante cada 2m, h=0.90m, empotrado 0.15m, pintura, suelda, instalación, no inluye cimentación. - Cantidad: 20.61 Metro (USD 65.38)
PINTURA ELASTOMÉRICA DE LÁTEX PARA EXTERIORES Incluye, limpieza, cogida de fallas y fisuras, fijador al agua y andamios - Cantidad: 250 Metro Cuadrado (USD 4.85)
MASILLADO DE PISOS MORTERO 1:3 esp.=2cm - Cantidad: 60 Metro Cuadrado (USD 7.42)
ENLUCIDO VERTICAL PALETEADO FINO e=2cm, SIN ANDAMIOS. Mortero 1:6, no incluye andamios. - Cantidad: 125.2 Metro Cuadrado (USD 10.06)
ENLUCIDO DE FAJAS ancho maximo=0.40m, altura 3-10m - Cantidad: 28.6 Metro (USD 6.01)
DESCANSOS GRADAS, LOSA MACIZA e=15cm, f´c=210kg/cm2 Horm. simple 210kg/cm2, acabado espolvoreado mortero 1:3 aplicado directamente. - Cantidad: 6.5 Metro Cuadrado (USD 24.18)
GRADAS 0.18x0.30m BASE=0.15m, MACIZA, f´c=210kg/cm2 Hormig.Simple f-c=210kg/cm2, encofrado, tablero contrachapado, espolvoreado, mortero 1:3. - Cantidad: 46.8 Metro (USD 16.72)
PINTURA TRÁFICO SEÑALIZACIÓN BORDILLOS. Limpieza superficie, 2 manos pint. tráfico a brocha, sup.aprox. 0.30m2 por metro lineal. - Cantidad: 6.1 Metro (USD 2.70)
BORDILLO HORM.S.180kg/cm2 h=20cm b=10cm Incluye excavación y encofrado. Especificaciones MOP-001-F2002. 610-1c. - Cantidad: 53.2 Metro (USD 9.68)
ACERA HORM.SIMPLE 210Kg/cm2 ESPESOR 10cm. Junta cada 2.5m, acabado espolvoreado mortero 1:3. - Cantidad: 25 Metro Cuadrado (USD 14.93)
HORMIGÓN SIMPLE -A- F-c=210 kg/cm2. Hormigonera y vibrador. 5032. - Cantidad: 38 Metro Cúbico (USD 136.81)
HORMIGON PREMEZCLADO f-c=240 kg/cm2 Incluye bomba, aditivos y transporte. 5032B3 - Cantidad: 62.3 Metro Cúbico (USD 130.22)
Entidad contratante: GOBIERNO AUTONOMO DESCENTRALIZADO DEL DISTRITO METROPOLITANO DE QUITO
Modalidad de contratación: Licitación
Criterios de elegibilidad: Oferta Económica,Otros,Participación Ecuatoriana,Subcontratación,Experiencia General,Experiencia Específica
Data provenance
This notice is sourced from SERCOP Ecuador and was originally published on August 19, 2025. Last refreshed 6 days ago. Original language: Spanish. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About GOBIERNO AUTONOMO DESCENTRALIZADO DEL DISTRITO METROPOLITANO DE QUITO
GOBIERNO AUTONOMO DESCENTRALIZADO DEL DISTRITO METROPOLITANO DE QUITO has issued 947 procurement notices on BidsFactory, including 4 currently open and 872 awarded contracts. Activity concentrates in Governance & Public Administration, Construction & Civil Works, and General Supplies & Services. All notices are published for Ecuador. Notices are distributed via SERCOP Ecuador. Most recent publication: May 15, 2026.
Frequently asked questions about this tender
Who is the contracting authority?
This notice was issued by GOBIERNO AUTONOMO DESCENTRALIZADO DEL DISTRITO METROPOLITANO DE QUITO in Ecuador. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Transport & Logistics sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
What is the estimated budget?
The estimated contract value is Up to $257,988. Bidders should ensure their proposals are consistent with this range and account for any local taxes and contract execution costs.
Where will the contract be performed?
The contract is for delivery in Ecuador. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit SERCOP Ecuador to access the full notice, required documents, and submission instructions provided by the contracting authority.
Is this tender still open?
No — the contract has already been awarded to CADENA CABASCANGO LUIS MANUEL. The award notice is archived on BidsFactory for transparency and market intelligence.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.
Sectors & Categories
Key Details
Contracting Authority
Companies That Won Similar
Companies with awards in Transport & Logistics in Ecuador