Tenders/Kino Policy No. 33, Community-Managed Jōyu Waterway Improvement Construction (Compressed file: 3.2MB)
Open🇯🇵JapanWorks

Kino Policy No. 33, Community-Managed Jōyu Waterway Improvement Construction (Compressed file: 3.2MB)

Auto-translated from Japanese
Original title: 契農政第33号 団体営上湯用水改修工事 (圧縮ファイル: 3.2MB)
岐阜県恵那市
Published: Oct 28, 2026
Updated: Nov 1, 2026
Source: 官公需 (kkj.go.jp)

About This Opportunity

This is a works contract in the agriculture and food security, water and sanitation and construction and civil works sectors, with a focus on Rehabilitation, Drainage, Groundwater and Demolition. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the agriculture and food security sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Kino Policy No. 33, Community-Managed Jōyu Waterway Improvement Construction (Compressed file: 3.2MB) Project Location Design Document, Breakdown Table, Unit Price Table (Construction Unit Price), Unit Price Table (Unregistered Costs), Unit Price Table (Indirect Costs) Project Number, Project Name, Community-Managed Irrigation and Drainage Project, District Name, Inojima District, Construction Name, Community-Managed Jōyu Waterway Improvement Construction Specifications, Fiscal Year, Reiwa 8th Year, Construction Location, Ena City, Kasagi-cho, Kawai District, Project Outline, Design Date, October 1, Reiwa 8, Construction Length L=38m, Earthwork (total), Waterway Construction (BF500) L=28m, Existing Waterway Invert Concrete Construction L=10m, Construction Method, Contracted, Manhole Construction N=2 locations, Co. Demolition V=0.9m3, Temporary Road Construction (Steel Plates) L=24m, Temporary Road Construction (Embankment) V=10m3, Construction Period, Start Date, Completion Date, Work Unit Application Date, Unit Price Application Date, Reason for Commencement, "&L&"MS Mincho,regular"&10 &C&"MS Mincho,regular"&10 Ena City", Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, 01: Main Construction Costs, Work Type Classification: Waterway Construction, Waterway Construction, 1, Lot, Open Channel Construction, 1, Lot, Earthwork, 1, Lot, Excavation (Construction Package), Soil, Other than above (Small Scale), Standard, 0.800, m3, Construction P Unit Price Table (CB210100-0001), Trench Excavation (Construction Package), Soil, Other than above (Small Scale), All Costs, 8, m3, Construction P Unit Price Table (CB210030-0002), Backfill (Construction Package), Other than above (Small Scale), Soil, All Costs, 8, m3, Construction P Unit Price Table (CB210410-0003), Slope Shaping (Construction Package), Cut Slope, None, Gravelly Soil, Sand and Sandy Soil, Clayey Soil, All Costs, 3, m2, Construction P Unit Price Table (CB220010-0004), Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Precast Open Channel Construction, 1, Lot, U-shaped Gutter L=2000mm [Standard], Bench Flume Type II, 500x320x2000mm, Construction Location Correction None, Day, Recycled Crushed Stone RC-40, 0.7, 28, m, Construction Work Unit Table (DC073710-0001), Waterway Invert Concrete Construction, Average Thickness 10cm, 10, m, Unit Price Table (SJ0120), Manhole Construction, 1, Lot, Distribution Manhole Construction, Type 3 (for BF500), 2, Units, Unit Price Table (SJ0160), Structure Removal Construction, 1, Lot, Structure Demolition Construction, 1, Lot, Structure Demolition Construction [Standard], Unreinforced Structure, Mechanical Construction, Day, Low Noise/Low Vibration Measures Not Taken, 0.900, m3, Construction Work Unit Table (DC073005-0006), Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Loading (Concrete Debris) (Construction Package), All Costs, 0.900, m3, Construction P Unit Price Table (CB224260-0008), Debris Transport (Construction Package), Concrete (Unreinforced) Structure Demolition, Mechanical Loading, DID Section None, Within 10.9km, All Costs, 0.900, m3, Construction P Unit Price Table (CB227010-0009), Disposal Fee (Ena City, Takeori, Takeori), Concrete Disposal Site, Unreinforced, 50x50x50cm or less, 2, t, ZC29840002, Temporary Construction, 1, Lot, Temporary Road Construction, 1, Lot, Temporary Road (Steel Plates) Construction, 24, m, Unit Price Table (SJ0210), Temporary Road (Embankment) Construction, 10, m3, Unit Price Table (SJ0230), Large Soil Bag Construction, 24, Bags, Unit Price Table (SJ0240), Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Wildlife Fence Removal and Reinstallation Construction, 1, Lot, Wire Mesh Removal and Reinstallation Construction, 10, m, Unit Price Table (SJ0220), Direct Construction Costs Total, 1, Lot, Indirect Construction Costs, Common Temporary Costs, Transportation Costs, 1, Lot, Common Temporary Costs (Pro-rata Amount), Construction Area: No Construction Area Correction, No Correction, 1, Lot, Common Temporary Costs Total, 1, Lot, Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Net Construction Costs, 1, Lot, Site Management Costs, 1, Lot, Site Management Costs (Pro-rata Amount), Construction Area: No Construction Area Correction, No Correction, 1, Lot, Construction Cost, 1, Lot, General Administrative Expenses, etc., 1, Lot, Total, 1, Lot, Grand Total, "&C&"MS Mincho,regular"&10 Ena City&R&"MS Mincho,regular"&10 &P Page", U-shaped Gutter L=2000mm [Standard], Construction Work Unit Table (DC073710-0001), Bench Flume Type II, 500x320x2000mm, Construction Location Correction None, Day, Recycled Crushed Stone RC-40, 0.7, 10, m, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Drainage Structure Construction [U-shaped Gutter], No Time Constraints, L=2000mm, 1000kg/unit or less, Mechanical/Labor, Day, 10.000, m, Q00103011100, Bench Flume Type II, "500 500x320x2,000", 5.000, Units, ZC15310500, Recycled Crushed Stone (RC), RC-40, 0.840, m3, ZC12160040, Total, 10.000, m, Per Unit, 1.000, m, Per Unit, Mortar Trowel Finish, Construction Work Unit Table (DC102815-0002), Floor, Blast Furnace, 1, m2, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Plastering, Person, RW1035, Special Laborer, Person, RW1002, Mortar Mixing (Construction Package), Blast Furnace, All Costs, 0.020, m3, Construction P Unit Price Table (CB240060-0006), Total, 1.000, m2, Per Unit, 1.000, m2, Per Unit, Precast Manhole Installation, Construction Work Unit Table (DA120097-0003), Within 50m, Exceeding 150kg up to 500kg, 1, Unit, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Construction Supervisor, Person, RW1025, Special Laborer, Person, RW1001, General Laborer, Person, RW1002, Machine Operation Costs, Hour, Construction Work Unit Table (KC010150-0004), Miscellaneous Expenses, 1.000, Lot, X981036, Total, 1.000, Unit, Per Unit, 1.000, Unit, Per Unit, Machine Operation Costs, Construction Work Unit Table (KC010150-0004), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Driver (Special), Person, RW1014, Diesel Fuel, Small Truck, Liter, ZC19020000, Backhoe Machine Rental, Hour, Construction Work Unit Table (KC919504-0005), Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Backhoe Machine Rental, Construction Work Unit Table (KC919504-0005), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe Machine Rental [Column 13], Emission Control Type, Hour, MC019615, Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Structure Demolition Construction [Standard], Construction Work Unit Table (DC073005-0006), Unreinforced Structure, Mechanical Construction, Day, Low Noise/Low Vibration Measures Not Taken, 1, m3, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Structure Demolition Construction [Unreinforced Structure], Mechanical Construction, No Time Constraints, Mechanical/Labor, Day, 1.000, m3, Q00106010100, Total, 1.000, m3, Per Unit, 1.000, m3, Per Unit, Steel Plate Installation/Removal Construction, Construction Work Unit Table (DA150125-0007), Rental Fee ~ Removal, 1000, m2, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Steel Plates, 30000.000, m2, ZNX91464, Steel Plates (Maintenance Fee), 1000.000, m2, ZNX91173, Special Laborer, Person, RW1001, General Laborer, Person, RW1002, Backhoe Operation Costs (Rental), Day, Construction Work Unit Table (KA200200-0008), Total, 1000.000, m2, Per Unit, 1.000, m2, Per Unit, Backhoe Operation Costs (Rental), Construction Work Unit Table (KA200200-0008), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe (with Crane) Rental, Noise Control Ultra-Low Noise/Emission Control 3rd/Stockpile 0.80m3, Operating Day, ZC89112080, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Embankment Spreading (Narrow Width), Construction Work Unit Table (DF010905-0009), 100, m3, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Bulldozer Operation, Day, Construction Work Unit Table (KF100100-0010), General Laborer, Person, RW1002, Total, 100.000, m3, Per Unit, 1.000, m3, Per Unit, Bulldozer Operation, Construction Work Unit Table (KF100100-0010), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Bulldozer Machine Rental, Emission Control Type, Operating Day, MC0101014030, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Large Soil Bag Construction, Construction Work Unit Table (DA150010-0011), Manufacturing and Installation, 34, Bags, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Construction Supervisor, Person, RW1025, Special Laborer, Person, RW1001, General Laborer, Person, RW1002, Large Soil Bags, 1-ton Soil Bag/Round Type, 34.000, Bags, ZC20090000, Purchased Soil, 34.000, m3, ZNX91080, Backhoe Operation Costs (Rental), Day, Construction Work Unit Table (KA200200-0012), Miscellaneous Expenses, 1.000, Lot, X981036, Total, 34.000, Bags, Large Soil Bag Construction, Construction Work Unit Table (DA150010-0011), Manufacturing and Installation, 34, Bags, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Per Unit, 1.000, Bag, Per Unit, Backhoe Operation Costs (Rental), Construction Work Unit Table (KA200200-0012), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe (with Crane) Rental, Noise Control Ultra-Low Noise/Emission Control 2014/Rear Ultra-Small Swivel Type Stockpile 0.45m3 (Level Stockpile 0.35m3) Lifting Capacity 2.9t, Operating Day, ZC59122035, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Large Soil Bag Construction, Construction Work Unit Table (DA150010-0013), Removal, 115, Bags, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Construction Supervisor, Person, RW1025, Special Laborer, Person, RW1001, Backhoe Operation Costs (Rental), Day, Construction Work Unit Table (KA200200-0014), Miscellaneous Expenses, 1.000, Lot, X981036, Total, 115.000, Bags, Per Unit, 1.000, Bag, Per Unit, Backhoe Operation Costs (Rental), Construction Work Unit Table (KA200200-0014), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe (with Crane) Rental, Noise Control Ultra-Low Noise/Emission Control 2014/Stockpile 0.8m3 (Level Stockpile 0.6m3) Lifting Capacity 2.9t, Operating Day, ZC59121060, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Large Soil Bag Loading, Construction Work Unit Table (DC022105-0015), Loading, 100, Sheets, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Laborer, Person, RW1002, Machine Operation Costs, Day, Construction Work Unit Table (KC110850-0016), Total, 100.000, Sheets, Per Unit, 1.000, Sheet, Per Unit, Machine Operation Costs, Construction Work Unit Table (KC110850-0016), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Driver (Special), Person, RW1014, Diesel Fuel, Small Truck, Liter, ZC19020000, Backhoe Machine Rental, Operating Day, Construction Work Unit Table (KC919582-0017), Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Backhoe Machine Rental, Construction Work Unit Table (KC919582-0017), 1, Operating Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe Machine Rental [Column 15], Emission Control Type, Operating Day, MC019620, Total, 1.000, Operating Day, Per Unit, 1.000, Operating Day, Per Unit, Large Soil Bag Transport, Construction Work Unit Table (DC022105-0018), Transport, 100, Sheets, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Dump Truck Operation Costs, Hour, Construction Work Unit Table (KC015600-0019), Total, 100.000, Sheets, Per Unit, 1.000, Sheet, Per Unit, Dump Truck Operation Costs, Construction Work Unit Table (KC015600-0019), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Driver (General), Person, RW1015, Diesel Fuel, Small Truck, Liter, ZC19020000, Dump Truck Machine Rental, Hour, Construction Work Unit Table (KC919514-0020), Tire Wear Costs, , Hour, ZC61010401, Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Dump Truck Machine Rental, Construction Work Unit Table (KC919514-0020), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Dump Truck Machine Rental [Column 13], Hour, MC001865, Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Wildlife Fence Removal, Construction Work Unit Table (DF150180-0021), 100, m, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Laborer, Person, RW1002, Total, 100.000, m, Per Unit, 1.000, m, Per Unit, Wildlife Fence Installation, Construction Work Unit Table (DF150180-0022), 100, m, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Laborer, Person, RW1002, Total, 100.000, m, Per Unit, 1.000, m, Per Unit, Transportation Costs (Temporary Materials), Construction Work Unit Table (DA160015-0023), "Within 12m, Temporary Materials (Steel Plates), Transport Distance = 10 km, Round Trip, Base Loading, Base Unloading", 1, Lot, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Basic Freight Charges, Within 12m, Up to 10km Transport, 12.800, Yen/t, ZY0Z4010, Loading and Unloading

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on October 28, 2026. Last refreshed 4 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 岐阜県恵那市

岐阜県恵那市 has issued 89 procurement notices on BidsFactory, including 22 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: November 4, 2026.

Frequently asked questions about this tender

What type of contract is this?

This is a Works contract in the Agriculture & Food Security sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 岐阜県恵那市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans