Kino Policy No. 33, Community-Managed Jōyu Waterway Improvement Construction (Compressed file: 3.2MB)
Project Location
Design Document, Breakdown Table, Unit Price Table (Construction Unit Price), Unit Price Table (Unregistered Costs), Unit Price Table (Indirect Costs)
Project Number, Project Name, Community-Managed Irrigation and Drainage Project, District Name, Inojima District, Construction Name, Community-Managed Jōyu Waterway Improvement Construction Specifications, Fiscal Year, Reiwa 8th Year, Construction Location, Ena City, Kasagi-cho, Kawai District, Project Outline, Design Date, October 1, Reiwa 8, Construction Length L=38m, Earthwork (total), Waterway Construction (BF500) L=28m, Existing Waterway Invert Concrete Construction L=10m, Construction Method, Contracted, Manhole Construction N=2 locations, Co. Demolition V=0.9m3, Temporary Road Construction (Steel Plates) L=24m, Temporary Road Construction (Embankment) V=10m3, Construction Period, Start Date, Completion Date, Work Unit Application Date, Unit Price Application Date, Reason for Commencement, "&L&"MS Mincho,regular"&10 &C&"MS Mincho,regular"&10 Ena City", Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, 01: Main Construction Costs, Work Type Classification: Waterway Construction, Waterway Construction, 1, Lot, Open Channel Construction, 1, Lot, Earthwork, 1, Lot, Excavation (Construction Package), Soil, Other than above (Small Scale), Standard, 0.800, m3, Construction P Unit Price Table (CB210100-0001), Trench Excavation (Construction Package), Soil, Other than above (Small Scale), All Costs, 8, m3, Construction P Unit Price Table (CB210030-0002), Backfill (Construction Package), Other than above (Small Scale), Soil, All Costs, 8, m3, Construction P Unit Price Table (CB210410-0003), Slope Shaping (Construction Package), Cut Slope, None, Gravelly Soil, Sand and Sandy Soil, Clayey Soil, All Costs, 3, m2, Construction P Unit Price Table (CB220010-0004), Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Precast Open Channel Construction, 1, Lot, U-shaped Gutter L=2000mm [Standard], Bench Flume Type II, 500x320x2000mm, Construction Location Correction None, Day, Recycled Crushed Stone RC-40, 0.7, 28, m, Construction Work Unit Table (DC073710-0001), Waterway Invert Concrete Construction, Average Thickness 10cm, 10, m, Unit Price Table (SJ0120), Manhole Construction, 1, Lot, Distribution Manhole Construction, Type 3 (for BF500), 2, Units, Unit Price Table (SJ0160), Structure Removal Construction, 1, Lot, Structure Demolition Construction, 1, Lot, Structure Demolition Construction [Standard], Unreinforced Structure, Mechanical Construction, Day, Low Noise/Low Vibration Measures Not Taken, 0.900, m3, Construction Work Unit Table (DC073005-0006), Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Loading (Concrete Debris) (Construction Package), All Costs, 0.900, m3, Construction P Unit Price Table (CB224260-0008), Debris Transport (Construction Package), Concrete (Unreinforced) Structure Demolition, Mechanical Loading, DID Section None, Within 10.9km, All Costs, 0.900, m3, Construction P Unit Price Table (CB227010-0009), Disposal Fee (Ena City, Takeori, Takeori), Concrete Disposal Site, Unreinforced, 50x50x50cm or less, 2, t, ZC29840002, Temporary Construction, 1, Lot, Temporary Road Construction, 1, Lot, Temporary Road (Steel Plates) Construction, 24, m, Unit Price Table (SJ0210), Temporary Road (Embankment) Construction, 10, m3, Unit Price Table (SJ0230), Large Soil Bag Construction, 24, Bags, Unit Price Table (SJ0240), Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Wildlife Fence Removal and Reinstallation Construction, 1, Lot, Wire Mesh Removal and Reinstallation Construction, 10, m, Unit Price Table (SJ0220), Direct Construction Costs Total, 1, Lot, Indirect Construction Costs, Common Temporary Costs, Transportation Costs, 1, Lot, Common Temporary Costs (Pro-rata Amount), Construction Area: No Construction Area Correction, No Correction, 1, Lot, Common Temporary Costs Total, 1, Lot, Breakdown Table, Name, Quantity, Unit, Unit Price, Amount, Remarks, Net Construction Costs, 1, Lot, Site Management Costs, 1, Lot, Site Management Costs (Pro-rata Amount), Construction Area: No Construction Area Correction, No Correction, 1, Lot, Construction Cost, 1, Lot, General Administrative Expenses, etc., 1, Lot, Total, 1, Lot, Grand Total, "&C&"MS Mincho,regular"&10 Ena City&R&"MS Mincho,regular"&10 &P Page", U-shaped Gutter L=2000mm [Standard], Construction Work Unit Table (DC073710-0001), Bench Flume Type II, 500x320x2000mm, Construction Location Correction None, Day, Recycled Crushed Stone RC-40, 0.7, 10, m, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Drainage Structure Construction [U-shaped Gutter], No Time Constraints, L=2000mm, 1000kg/unit or less, Mechanical/Labor, Day, 10.000, m, Q00103011100, Bench Flume Type II, "500 500x320x2,000", 5.000, Units, ZC15310500, Recycled Crushed Stone (RC), RC-40, 0.840, m3, ZC12160040, Total, 10.000, m, Per Unit, 1.000, m, Per Unit, Mortar Trowel Finish, Construction Work Unit Table (DC102815-0002), Floor, Blast Furnace, 1, m2, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Plastering, Person, RW1035, Special Laborer, Person, RW1002, Mortar Mixing (Construction Package), Blast Furnace, All Costs, 0.020, m3, Construction P Unit Price Table (CB240060-0006), Total, 1.000, m2, Per Unit, 1.000, m2, Per Unit, Precast Manhole Installation, Construction Work Unit Table (DA120097-0003), Within 50m, Exceeding 150kg up to 500kg, 1, Unit, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Construction Supervisor, Person, RW1025, Special Laborer, Person, RW1001, General Laborer, Person, RW1002, Machine Operation Costs, Hour, Construction Work Unit Table (KC010150-0004), Miscellaneous Expenses, 1.000, Lot, X981036, Total, 1.000, Unit, Per Unit, 1.000, Unit, Per Unit, Machine Operation Costs, Construction Work Unit Table (KC010150-0004), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Driver (Special), Person, RW1014, Diesel Fuel, Small Truck, Liter, ZC19020000, Backhoe Machine Rental, Hour, Construction Work Unit Table (KC919504-0005), Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Backhoe Machine Rental, Construction Work Unit Table (KC919504-0005), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe Machine Rental [Column 13], Emission Control Type, Hour, MC019615, Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Structure Demolition Construction [Standard], Construction Work Unit Table (DC073005-0006), Unreinforced Structure, Mechanical Construction, Day, Low Noise/Low Vibration Measures Not Taken, 1, m3, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Structure Demolition Construction [Unreinforced Structure], Mechanical Construction, No Time Constraints, Mechanical/Labor, Day, 1.000, m3, Q00106010100, Total, 1.000, m3, Per Unit, 1.000, m3, Per Unit, Steel Plate Installation/Removal Construction, Construction Work Unit Table (DA150125-0007), Rental Fee ~ Removal, 1000, m2, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Steel Plates, 30000.000, m2, ZNX91464, Steel Plates (Maintenance Fee), 1000.000, m2, ZNX91173, Special Laborer, Person, RW1001, General Laborer, Person, RW1002, Backhoe Operation Costs (Rental), Day, Construction Work Unit Table (KA200200-0008), Total, 1000.000, m2, Per Unit, 1.000, m2, Per Unit, Backhoe Operation Costs (Rental), Construction Work Unit Table (KA200200-0008), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe (with Crane) Rental, Noise Control Ultra-Low Noise/Emission Control 3rd/Stockpile 0.80m3, Operating Day, ZC89112080, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Embankment Spreading (Narrow Width), Construction Work Unit Table (DF010905-0009), 100, m3, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Bulldozer Operation, Day, Construction Work Unit Table (KF100100-0010), General Laborer, Person, RW1002, Total, 100.000, m3, Per Unit, 1.000, m3, Per Unit, Bulldozer Operation, Construction Work Unit Table (KF100100-0010), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Bulldozer Machine Rental, Emission Control Type, Operating Day, MC0101014030, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Large Soil Bag Construction, Construction Work Unit Table (DA150010-0011), Manufacturing and Installation, 34, Bags, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Construction Supervisor, Person, RW1025, Special Laborer, Person, RW1001, General Laborer, Person, RW1002, Large Soil Bags, 1-ton Soil Bag/Round Type, 34.000, Bags, ZC20090000, Purchased Soil, 34.000, m3, ZNX91080, Backhoe Operation Costs (Rental), Day, Construction Work Unit Table (KA200200-0012), Miscellaneous Expenses, 1.000, Lot, X981036, Total, 34.000, Bags, Large Soil Bag Construction, Construction Work Unit Table (DA150010-0011), Manufacturing and Installation, 34, Bags, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Per Unit, 1.000, Bag, Per Unit, Backhoe Operation Costs (Rental), Construction Work Unit Table (KA200200-0012), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe (with Crane) Rental, Noise Control Ultra-Low Noise/Emission Control 2014/Rear Ultra-Small Swivel Type Stockpile 0.45m3 (Level Stockpile 0.35m3) Lifting Capacity 2.9t, Operating Day, ZC59122035, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Large Soil Bag Construction, Construction Work Unit Table (DA150010-0013), Removal, 115, Bags, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Construction Supervisor, Person, RW1025, Special Laborer, Person, RW1001, Backhoe Operation Costs (Rental), Day, Construction Work Unit Table (KA200200-0014), Miscellaneous Expenses, 1.000, Lot, X981036, Total, 115.000, Bags, Per Unit, 1.000, Bag, Per Unit, Backhoe Operation Costs (Rental), Construction Work Unit Table (KA200200-0014), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe (with Crane) Rental, Noise Control Ultra-Low Noise/Emission Control 2014/Stockpile 0.8m3 (Level Stockpile 0.6m3) Lifting Capacity 2.9t, Operating Day, ZC59121060, Diesel Fuel, Small Truck, Liter, ZC19020000, Driver (Special), Person, RW1014, Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Large Soil Bag Loading, Construction Work Unit Table (DC022105-0015), Loading, 100, Sheets, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Laborer, Person, RW1002, Machine Operation Costs, Day, Construction Work Unit Table (KC110850-0016), Total, 100.000, Sheets, Per Unit, 1.000, Sheet, Per Unit, Machine Operation Costs, Construction Work Unit Table (KC110850-0016), 1, Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Driver (Special), Person, RW1014, Diesel Fuel, Small Truck, Liter, ZC19020000, Backhoe Machine Rental, Operating Day, Construction Work Unit Table (KC919582-0017), Total, 1.000, Day, Per Unit, 1.000, Day, Per Unit, Backhoe Machine Rental, Construction Work Unit Table (KC919582-0017), 1, Operating Day, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Backhoe Machine Rental [Column 15], Emission Control Type, Operating Day, MC019620, Total, 1.000, Operating Day, Per Unit, 1.000, Operating Day, Per Unit, Large Soil Bag Transport, Construction Work Unit Table (DC022105-0018), Transport, 100, Sheets, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Dump Truck Operation Costs, Hour, Construction Work Unit Table (KC015600-0019), Total, 100.000, Sheets, Per Unit, 1.000, Sheet, Per Unit, Dump Truck Operation Costs, Construction Work Unit Table (KC015600-0019), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Driver (General), Person, RW1015, Diesel Fuel, Small Truck, Liter, ZC19020000, Dump Truck Machine Rental, Hour, Construction Work Unit Table (KC919514-0020), Tire Wear Costs, , Hour, ZC61010401, Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Dump Truck Machine Rental, Construction Work Unit Table (KC919514-0020), 1, Hour, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Dump Truck Machine Rental [Column 13], Hour, MC001865, Total, 1.000, Hour, Per Unit, 1.000, Hour, Per Unit, Wildlife Fence Removal, Construction Work Unit Table (DF150180-0021), 100, m, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Laborer, Person, RW1002, Total, 100.000, m, Per Unit, 1.000, m, Per Unit, Wildlife Fence Installation, Construction Work Unit Table (DF150180-0022), 100, m, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, General Laborer, Person, RW1002, Total, 100.000, m, Per Unit, 1.000, m, Per Unit, Transportation Costs (Temporary Materials), Construction Work Unit Table (DA160015-0023), "Within 12m, Temporary Materials (Steel Plates), Transport Distance = 10 km, Round Trip, Base Loading, Base Unloading", 1, Lot, Per Unit, Name/Specification, Quantity, Unit, Unit Price, Amount, Remarks, Basic Freight Charges, Within 12m, Up to 10km Transport, 12.800, Yen/t, ZY0Z4010, Loading and Unloading