Procurement Item Number: 0000000000000621179
Procurement Type: Public Notice of General Competitive Bidding (WTO Non-Target)
Classification: Minor Construction Work
Procurement Item Name: Misono Housing (Building 503, etc., 2 buildings) Air Conditioner Sleeve Installation and Other Works
Publication Start Date: September 8, Reiwa 8
Publication End Date: October 2, Reiwa 8
Procurement Organization: Ministry of Finance
Procurement Organization Location: Hokkaido
Procurement Item Classification: Construction Work
Notice Content:
NOTICE
The following is hereby put out to general competitive bidding.
September 8, Reiwa 8
Authorized Officer for Expenditure
Director General of Hokkaido Finance Bureau
Akira Endo
Details
1. Use of Government Electronic Procurement System
This work will be conducted through bidding and bid opening procedures using the "Procurement Portal/Electronic Procurement System" (https://www.p-portal.go.jp/pps-web-biz/) (hereinafter referred to as the "System").
However, submission of bids in "paper" format is also acceptable.
2. Matters for Competitive Bidding
(1) Name of Work: Misono Housing (Building 503, etc., 2 buildings) Air Conditioner Sleeve Installation and Other Works
(2) Location of Work: 8-jo 7-chome 3-ban, Misono, Toyohira-ku, Sapporo
(3) Outline of Work: As attached.
(4) Construction Period: From the day after the contract is concluded until March 25, Reiwa 9.
(5) This work is a "Two-Day Work Week Promotion Project (Contractor's Choice Method)".
3. Matters Concerning Qualifications Required for Bidders
(1) Not falling under Article 70 of the Order for Budget, Expenditure, and Accounting (Imperial Ordinance No. 165 of 1947). (Minors, persons under guardianship, or persons under assistance who have obtained the necessary consent for contract conclusion fall under the special circumstances in the same Article.)
(2) Not falling under Article 71 of the Order for Budget, Expenditure, and Accounting.
(3) Must be graded in "General Construction" with C or D, or "Electrical Construction" with A, B, or C in the Reiwa 7 & 8 Ministry of Finance Hokkaido Area Competitive Bidding Qualifications, and have a head office or branch office in Hokkaido.
(4) Not a company that has filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act (Act of 2002, No. 154) or for commencement of rehabilitation proceedings under the Civil Rehabilitation Act (Act of 1999, No. 225) (excluding those who have filed for rehabilitation proceedings and have subsequently received re-certification of competitive bidding qualifications as per (3) above).
(5) Must be able to assign a supervising engineer or a chief engineer with national qualifications, and a site agent corresponding to the contracted work to the construction site.
(6) Not currently subject to suspension of bidding, etc. by any ministry or agency (including those specially permitted by the authorized officer for expenditure).
(7) Not a party who has violated a contract concluded with the contracting officer, refused to conclude a contract after becoming the successful bidder without justifiable reason, or engaged in fraudulent or dishonest conduct during bidding, and is deemed unsuitable as a contract party.
(8) Must be a party whose financial condition or creditworthiness has not extremely deteriorated, and who can ensure proper contract performance.
(9) Must have received or obtained the bidding documents, etc. as specified in Section 8 below.
4. Location for Inspection of Contract Terms and Specifications
10th Floor, Sapporo First Government Building, North 8 West 2, Kita-ku, Sapporo
Hokkaido Finance Bureau Bulletin Board and "System".
5. Deadline for Submission of Certificates, etc.
September 29, Reiwa 8 (Tuesday) 12:00 PM.
6. Deadline for Submission of Bid Forms and Breakdown
October 1, Reiwa 8 (Thursday) 5:15 PM.
7. Location and Date of Bid Opening
11th Floor, Sapporo First Government Building, North 8 West 2, Kita-ku, Sapporo
Hokkaido Finance Bureau Second Conference Room
October 2, Reiwa 8 (Friday) 1:30 PM.
8. Method and Period for Distribution of Bidding Documents, etc.
Bidding documents, etc. should be received using the "System".
For those who wish to receive paper copies of bidding documents, etc., they will be distributed during the following period and at the following location.
Distribution Period: From the date of announcement until September 28, Reiwa 8 (Monday), on weekdays from 8:30 AM to 12:00 PM and from 1:00 PM to 5:15 PM.
Location: 10th Floor, Sapporo First Government Building, North 8 West 2, Kita-ku, Sapporo
Director of Property Management, First Property Management Officer, Hokkaido Finance Bureau
Tel: 011-709-2311 (Ext. 4453)
9. Bid Bond: Exempt.
10. Contract Deposit: To be paid (1/10 or more of the contract amount).
However, payment of the contract deposit may be substituted by providing interest-bearing national bonds, or a guarantee from a financial institution or guarantee company.
Furthermore, if a public works performance guarantee bond is provided or a performance guarantee insurance contract is concluded, the contract deposit will be exempted.
11. Invalid Bids
(1) Bids submitted by persons who do not meet the competitive bidding qualifications specified in Section 3 above, or bids that violate the bidding conditions indicated in the bidding documents, shall be invalid.
(2) In the case of bids submitted via the System, bids submitted by those who violate the "Terms of Use for the Procurement Portal/Electronic Procurement System" shall be invalid.
(3) In principle, bids submitted with no breakdown or with an incomplete breakdown shall be invalid.
12. Language and Currency
The language and currency used in bidding and contract procedures shall be Japanese and Japanese currency only.
13. Matters Concerning Consumption Tax
For the purpose of determining the successful bid, the successful bid price shall be the amount stated in the bid form plus an amount equivalent to 10% of that amount (if there is a fraction of less than 1 yen in that amount, the fractional amount shall be rounded down).
Therefore, bidders shall state in their bid form an amount equivalent to 100/110 of the estimated contract amount (including consumption tax), regardless of whether they are taxable or exempt from consumption tax.
14. Method of Determining the Successful Bidder
The successful bidder shall be the one who submits the lowest bid within the range of the estimated price limit.
However, if the bid price of the party who would be the successful bidder is such that it is deemed unlikely that the contract content will be performed in accordance with the contract, or if it is deemed significantly inappropriate to conclude the contract with such party as it would disrupt the order of fair trade, the bidder who submitted the lowest bid within the range of the estimated price limit may be selected as the successful bidder.
15. Construction Performance Evaluation
For this work, if the contract amount exceeds 5 million yen (including tax), it will be subject to construction performance evaluation as stipulated in Article 7 of the Act on Promotion of Quality Assurance of Public Works (Act No. 18 of 2005).
Construction performance evaluation will be conducted at the time of completion inspection, and the evaluation results will be notified to the contractor via a construction performance evaluation notice.
16. Requirement for Contract Creation: Required.
17. Other
(1) Regarding "5. Deadline for Submission of Certificates, etc." to "7. Location and Date of Bid Opening", if there is a system failure, the date and time will be changed to a date and time to be notified separately.
(2) Those who wish to obtain new bidding qualifications to participate in this work must submit an "Application for Competitive Bidding Qualifications" in person or by mail by 5:15 PM on September 16, Reiwa 8 (Wednesday).
Above
Procurement Documents 1
URL for Downloading Procurement Documents 1
Procurement Documents 2- Procurement Documents 3- Procurement Documents 4- Procurement Documents 5-