Public Notice Appendix Form No. 1 529, Public Notice No. 7-88, September 7, Reiwa 8 (2026), To Whom It May Concern, Mayor of Aga Town, Regarding the Implementation of Limited Public Competition Bidding, We have decided to proceed with a limited public competition bidding for the following matter. Those who wish to participate in the bidding should submit the application documents for this bidding by the specified deadline.
Details:
① Project Overview
Project Category: Construction
Project Name: Teacher Housing Management Expenses
Work Number: R8 Aga Kyo-i No. 17
Subject: Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Work Location: Within Ku-jima, Aga Town
Work Period: From the contract date to December 25, Reiwa 8 (2026)
Work Details: Roof painting N=3 buildings A=261.0㎡, Exterior wall painting N=3 buildings A=348.0㎡
② Matters for Bidding
Bidding Execution Date and Time: September 17, Reiwa 8 (2026) (Thursday) 10:20 AM
Bidding Venue: Aga Town Hall Kamikawa Branch Office, 2nd Floor, Second Conference Room
Bidding Participation Conditions:
Business Category: Individual
Office Category: Head Office
Regional Requirement: The address of the bidder must be within Aga Town.
Aga Town
Industry and Grade:
Industry: Building Construction (General)
Grade: B, C, D
Track Record Requirement: None
Other Requirements: The bidder must not be subject to a suspension of bidding by Aga Town during the period from the date of this public notice to the bidding date.
(Notes): None
Bid Bond: Exempt (However, if the successful bidder fails to conclude the contract, a penalty equivalent to 5/100 of the winning bid amount will be collected.)
Contract Deposit: Deposit an amount equivalent to 10/100 or more of the contract amount.
Advance Payment/Interim Payment: Advance Payment: Yes, Interim Advance Payment: Yes, Partial Payment: Yes
Minimum Reserve Price: Will be set.
Breakdown of Estimated Costs: Submission of a breakdown of estimated costs for this bid is required.
The breakdown of estimated costs should be described down to the major categories.
Invalid Bids: Bids deemed invalid by Article 137, Paragraphs 1 and 3 of the Aga Town Financial Regulations, other Aga Town bidding-related regulations, and the Aga Town Construction Work Bidder's Guidelines will be considered invalid.
Determination of Successful Bid: The successful bid will be determined based on the bid amount plus 10/100 of that amount (if there are fractions of less than 1 yen, those fractions will be rounded down). Therefore, bidders must state the amount equivalent to 100/110 of their estimated contract desired amount on the bid form, regardless of whether they are a taxable or non-taxable business for consumption and local consumption tax.
③ Bidding Application Documents
Submission Deadline: September 14, Reiwa 8 (2026) (Monday) by 12:00 PM
Submission Location and Method: Submit in person or by proxy to the Property Management Section, General Affairs Division, Aga Town Hall (Aga Town Hall Main Building, 2nd Floor).
Documents to Submit:
Bidding Application Form (Appendix Form No. 1): 1 copy
Documents proving track record (copy of contract, etc.): Not required
Construction Track Record Statement (Appendix Form No. 3): Not required
Personnel Assignment Statement (Appendix Form No. 4): Not required
Certificate of Employment for Assigned Personnel:
④ Collins/TECRIS: The successful bidder must register the details of this work in the Collins/TECRIS registration system.
⑤ Regarding the Contract:
Upon determination of the successful bidder for this bid, the contract will be promptly concluded between Aga Town and the successful bidder.
⑥ Matters to be Observed:
This bid and contract will be conducted in accordance with the Aga Town Financial Regulations, the Aga Town Construction Work Competitive Bidding Implementation Guidelines, the Aga Town Construction Work Limited Public Competition Bidding Implementation Guidelines, other Aga Town bidding and contract-related regulations, and the Aga Town Construction Work Bidder's Guidelines posted separately at the bidding venue. Bidders must comply with these regulations.
⑦ Inquiries, etc.:
If you have any questions regarding this bid, contract, or design documents, please submit them in person or by fax to the Property Management Section, General Affairs Division, Aga Town Hall by the deadline for submitting bidding application documents. The submission format is optional.
⑧ Contact Information:
Property Management Section, General Affairs Division, Aga Town Hall
580 Tsugawa, Aga Town, Higashikambara District, Niigata Prefecture
Phone: 0254-92-3113 FAX: 0254-92-5479
* The items listed on the right refer to those registered in Aga Town's various bidder qualification lists by the day before this public notice, or those delegated by such registered persons who have the authority to conclude contracts with Aga Town.
* Submitted application documents will not be returned.
* For details of the overview, please refer to the materials posted on the town's homepage.
Appendix Form No. 1
529
Building Construction B, C, D
Aga Town
Head Office_Track Record: None
Application for Participation in General Competitive Bidding
Reiwa Year Month Day
Mayor of Aga Town
Kanda Kazuaki
To:
Address:
Company Name:
Representative Name:
Signature:
Phone Number:
Email Address:
Contact Person Name:
I meet the bidding participation qualification requirements for the matters announced on September 7, Reiwa 8 (2026), and wish to participate in the bidding, so I hereby apply in accordance with Article 4, Paragraph 1 of the Aga Town Construction Work Limited Public Competition Bidding Implementation Guidelines.
Details:
1. Date of Public Notice: September 7, Reiwa 8 (2026)
2. Bidding Execution Date and Time: September 17, Reiwa 8 (2026) (Thursday) 10:20 AM
3. Project Name: Teacher Housing Management Expenses
4. Subject: Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Receipt Slip
Application for Participation in General Competitive Bidding Receipt Slip
Applicant:
Address:
Company Name:
Representative Name:
1. Date of Public Notice: September 7, Reiwa 8 (2026)
2. Bidding Execution Date and Time: September 17, Reiwa 8 (2026) (Thursday) 10:20 AM
3. Project Name: Teacher Housing Management Expenses
4. Subject: Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Received by:
Aga Town Hall, General Affairs Division, Property Management Section
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Yen Yen (Yen) (Yen) Days Days) Completion Deadline
■ Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Roof Painting N=3 buildings A=261.0㎡
Exterior Wall Painting N=3 buildings A=348.0㎡
Reiwa 8 Survey Design Design Document
Year
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Teacher Housing Management Expenses
Design Overview or Completion Deadline
Work Days
Yen 5,984,000 (Including consumption tax 544,000 Yen)
December 25, Reiwa 8
R8 Aga Kyo-i No. 17
Aga Town Contract Amount (Original)
Design Overview or Completion Deadline
Work Days
Change Days (Added Days)
Work Number
Original Execution
Design Amount
Change
Execution Location
Ku-jima, Higashikambara District, Aga Town
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
1. Work Name
2. Work Location
3. Site Area
4. Building Area
5. Total Floor Area
6. Main Use
7. Main Structure
8. Foundation Structure
9. Work Type
10. Work Details
Staff Housing
Wood Frame
Building Construction (General)
Roof Painting N=3 buildings
Exterior Wall Painting N=3 buildings
Work Overview
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Higashikambara District, Aga Town, Ku-jima
- 54.65㎡/building
96.06㎡/building
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Unit Quantity Unit Price Amount
Work Cost
Construction Period
1 month
Unit
1.0
Amount
3,860,540
B Common Costs %
3.9 [Public Building Construction Cost Estimation Standards]
a. Common Temporary Work Costs
Unit
1.0
Amount
150,561
[Renovation Building Construction] %
13.67 [Public Building Construction Cost Estimation Standards]
b. Site Management Costs
Unit
1.0
Amount
548,318
[Renovation Building Construction] %
19.46 [Public Building Construction Cost Estimation Standards]
c. General Management Costs
Unit
1.0
Amount
887,263
[Building Construction]
Total Common Costs (a+b+c)
1,586,141
-6,681
Rounding Adjustment
Total Construction Price (A+B)
5,440,000
Consumption Tax Equivalent Amount
10%
544,000
Total Construction Cost
5,984,000
2. Name Specifications
Original Execution
Change Design
Difference
Remarks
Breakdown
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Unit Quantity Unit Price Amount
A. Construction Costs
1. Temporary Work
Unit
1.0
Amount
1,317,420
2. Roof Painting Work
Unit
1.0
Amount
1,029,180
3. Exterior Wall Painting Work
Unit
1.0
Amount
1,513,940
Total
3,860,540
3. Breakdown
Name Specifications
Original Execution
Change Design
Difference
Remarks
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Unit Quantity Unit Price Amount
1. Temporary Work
Wedge-lock scaffolding, less than 10m high, W=600, including transport costs
㎡
675.0
1,370
924,750
Building Cost Information 2026 Spring
Vertical netting, mesh sheet, including transport costs
㎡
675.0
530
357,750
Building Cost Information 2026 Spring
Sash protection
㎡
36.0
970
34,920
Building Cost Information 2026 Spring
Total
1,317,420
4. Breakdown
Name Specifications
Original Execution
Change Design
Difference
Remarks
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Unit Quantity Unit Price Amount
2. Roof Painting Work
Substrate preparation, galvanized steel sheet (RB type) (including removal of existing coating)
Scraping/cleaning, rust removal included
㎡
261.0
640
167,040
Building Cost Information 2026 Spring
High-pressure water washing, water washing 15MPa
㎡
261.0
250
65,250
Building Cost Information 2026 Spring
Weather-resistant paint, topcoat painting, steel surface (A type)
㎡
261.0
2,320
605,520
Building Cost Information 2026 Spring
Weather-resistant paint, water cut painting, steel surface (B type), W=35-50
㎡
6.0
3,620
21,720
Building Cost Information 2026 Spring
Total
1,029,180
5. Breakdown
Name Specifications
Original Execution
Change Design
Difference
Remarks
Nono-hana Staff Housing Roof and Exterior Wall Painting Work
Unit Quantity Unit Price Amount
3. Exterior Wall Painting Work
High-pressure water washing 15MPa
㎡
348.0
250
87,000
Building Cost Information 2026 Spring
Weather-resistant paint, exterior wall painting, steel surface (C type)
㎡
348.0
2,970
1,033,560
Building Cost Information 2026 Spring
Steel surface, substrate preparation included
Water cut painting, 2 topcoats
m
106.0
1,250
132,500
Building Cost Information 2026 Spring
Fascia boards, entrance wood parts
Wood painting, substrate preparation included
m
168.0
1,000
168,000
Building Cost Information 2026 Spring
EP type, 2 coats
Eaves soffit painting, W=450-500
㎡
54.0
1,720
92,880
Building Cost Information 2026 Spring
Total
1,513,940
6. Breakdown
Name Specifications
Original Execution
Change Design
Difference
Remarks
This work shall be performed in accordance with the "Niigata Prefecture Civil Engineering Work Standard Specifications" and the attached "Special Specifications".
The items and matters marked with ○ below are indicated as they will be subject to restrictions during construction.
If there are any changes to the indicated matters, or if restrictions not indicated arise, appropriate measures will be taken in consultation with Party A (the Town).
I. Construction Process
1. Related Separate Works
- Work Name:
- Scheduled Period:
2. Restrictions on Construction Period, Time, and Method
- Period: Saturdays, Sundays, and national holidays are generally considered non-working days.
- Time: Working hours are from 8:30 AM to 5:00 PM.
- Method:
3. Construction Conditions Based on Consultation with Related Organizations
- :
- :
4. Other
- Regarding the construction period, consult with related parties and organizations.
II. Land Related
1. Unprocessed portions of construction land, etc.
- :
- :
2. Designated temporary yard
- Location:
- Period:
3. Other
III. Pollution Control Related
1. Restrictions on pollution prevention (noise, vibration, exhaust gas, dust, water quality, etc.)
- Construction Method:
- Working Hours:
2. Necessity of Survey of Houses, etc.
- Method:
- Scope:
3. Other
IV. Safety Measures Related
1. Designated traffic safety facilities, etc.
- :
- :
2. Restrictions on nearby work (railways, gas, water, sewage, electricity, telephone, etc.)
- :
- :
- :
3. Blasting work
- Safety equipment and personnel:
- :
- :
4. Protective structures (rockfall, avalanche, landslide, etc.)
- Content:
5. Other
V. Construction Road Related
1. Restrictions on the use of general roads as access roads
- Access Route:
- Period:
- :
2. Occupation of general roads
- Period:
- Regulatory Conditions:
- Time Restrictions:
3. Installation of temporary roads
- :
- Land Related:
- Safety Facilities:
- Post-construction measures:
"Retain" or "Remove"
4. Other
Construction Method Restrictions
Traffic Control
Work Specifications Summary
Construction Conditions Summary Table
Indicated Items
Consultation Content
Work Hours Restrictions
Post-use Measures
Designated Construction Method
Work Hours Restrictions
Protective Work
Completion Estimated Date
Disposal Estimated Date
Other Facilities
Section
VI. Temporary Equipment Related
1. Designated temporary equipment
2. Specified conditions for temporary equipment
3. Transfer or shared use of temporary equipment
- Work Type:
- Content:
4. Image Improvement
- Content:
5. Other
VII. Excess Soil and Industrial Waste Related
As per the attached "Special Specifications for Construction By-products".
VIII. Work Obstructions
1. Obstructions due to occupation (electricity, telephone, water, sewage, gas, etc.)
- Content:
- Relocation, removal, protection method:
- Period:
2. Overlapping work on occupied facilities
- Content:
3. Other
IX. Drainage Work
1. Special measures for turbid water and groundwater treatment (including turbid water treatment)
- Content:
X. Chemical Injection Related
1. Chemical injection method available
XI. Other
1. On-site generated materials
- Item Name:
- Delivery Location:
2. Supplied and loaned items
- Item Name:
- Delivery Location:
3. Work subject to quality certification
4. Other
XII. Exhaust Gas Emission Compliant Construction Machinery
General Construction Machinery
- Backhoe
- Tractor shovel (wheeled)
- Bulldozer
- Engine generator (portable)
- Air compressor (portable)
- Hydraulic unit
- Road roller, tire roller, vibratory roller
- Wheel crane
XIII. Construction Methods, etc.
- Except as specifically provided in the Construction Conditions Summary Table, drawings, specifications, site explanation, and answers to questions regarding the site explanation, the contractor shall determine the means necessary to complete the work objective, including temporary work, construction methods, etc., at the contractor's responsibility.
(In accordance with Article 1, Paragraph 3 of the Standard Conditions for Construction Contracts)
- Limited to construction machinery equipped with diesel engines (engine output 7.5kW or more, 260kW or less).
Remarks
Model
Among the foundation work machinery shown below, those equipped with a hydraulic unit driven by an independent diesel engine separately from the base machine:
Hydraulic hammer, vibratory hammer, hydraulic steel pipe jacking/pulling machine, hydraulic pile jacking/pulling machine, earth auger, all-casing drilling machine, reverse circulation drill, earth drill, underground continuous wall construction machine, full-rotation all-casing drilling machine.
Indicated Items
Construction Conditions
This work requires the use of exhaust gas emission compliant construction machinery as designated by the "Designation Standards for Exhaust Gas Emission Compliant Construction Machinery (Notification No. 247 issued by the Ministry of Land, Infrastructure, Transport and Tourism on October 8, Reiwa 3)".