[Construction Work] Iko No. Hoho 6 / Prefectural Road Pavement Repair (Urgent Self-Financing Portion) Seki-Kanayama Line Pavement Repair Work
About This Opportunity
This is a works contract in the construction and civil works, transport and logistics and humanitarian aid sectors, with a focus on Roads, Rehabilitation, Demolition and Shelter. Located in Japan, Asia, this opportunity is open to firms and consortiums.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from Japanese[Construction Work] Iko No. Hoho 6 / Prefectural Road Pavement Repair (Urgent Self-Financing Portion) Seki-Kanayama Line Pavement Repair Work
Form No. 2 Public Notice of Bidding Individual Matters [Post-Verification Type] Gifu Prefectural Mino Civil Engineering Office Director Nobuhiro Ukai 1. Works for Public Competitive Bidding (1) Work Number Iko No. Hoho 6 Work Name Work Name Work Name Prefectural Road Pavement Repair (Urgent Self-Financing Portion) Seki-Kanayama Line Pavement Repair Work (Electronic Bidding Target Project) (2) Work Location Major Prefectural Road Seki-Kanayama Line Seki City Shimonohara and other areas (3) Work Outline Shimonohara Work Section Construction Length L=210m W=6.0-9.0 (9.0-12.0)m Milling Overlay Work (Milling Thickness 5cm Recycled Dense Graded Asphalt 5cm) A=1,740m2 Line Marking Work (Molten Type) N=1 set Nakanoho Work Section Construction Length L=100m W=3.0 (9.0)m Milling Overlay Work (Milling Thickness 5cm Recycled Dense Graded Asphalt 5cm) A=300m2 Line Marking Work (Molten Type) N=1 set (4) Work Period From July 17, Reiwa 8 to November 13, Reiwa 8 (5) Estimated Price (6) Yes (Disqualification Criteria Yes) (7) No (8) (9) (10) (11) (12) (13) (14) Public Notice of Bidding (Individual Matters) Public Notice of Public Competitive Bidding for Prefectural Road Pavement Repair (Urgent Self-Financing Portion) Seki-Kanayama Line Pavement Repair Work This work is a comprehensive evaluation bidding system (Simple Type 1) project that accepts proposals of technical documents and determines the successful bidder by comprehensively evaluating factors other than price and price.
This work is a trial project for the correction of on-site management costs that contribute to heatstroke countermeasures, and the on-site management costs will be adjusted at the time of design change according to the maximum daily temperature.
This work is subject to the obligation of separate demolition and recycling of construction materials, etc., and the recycling of specified construction waste materials, based on the Law for Promotion of Recycling of Construction Materials (Law No. 104 of 2000).
This work will be conducted using the electronic bidding system.
If it is difficult to use the electronic bidding system, written submissions may be accepted with prior approval from the head of the contracting organization.
June 22, Reiwa 8 The public notice of bidding shall consist of "Form No. 1 Common Matters for Public Notice of Bidding (Post-Verification Type)" and this document.
"Form No. 1 Common Matters for Public Notice of Bidding (Post-Verification Type)" is posted on the Gifu Prefecture website.
We hereby announce that a post-verification type public competitive bidding will be held for the Prefectural Road Pavement Repair (Urgent Self-Financing Portion) Seki-Kanayama Line Pavement Repair Work, in accordance with the provisions of Article 127 of the Gifu Prefectural Accounting Regulations (Showa 32 Gifu Prefectural Ordinance No. 19, hereinafter referred to as "Regulations").
This bidding will be conducted using the electronic bidding system. However, if you have changed your company name, address, or representative and have not completed the IC card change procedure, please participate using paper bids.
If you continue to use your current IC card, your bid may be invalidated or you may be subject to suspension of bidding eligibility.
Please contact us if you have any questions.
Furthermore, this work is a project that utilizes the flexible work period contract method (optional commencement method), and when utilizing the flexible work period (optional commencement method), the following applies.
Work commencement deadline Reiwa 8, September 14 Work days 120 days 19,327,000 yen (including consumption tax and local consumption tax) Low Bid Price Investigation System Minimum Restriction Price System This work is a model project for improving the construction site environment to secure human resources.
For details, please refer to the "Implementation Guidelines for Model Projects for Improving the Construction Site Environment Ordered by Gifu Prefecture".
This work is a trial project for a human resource development type comprehensive evaluation bidding system aimed at supporting the securing and training of human resources and improving the working environment in the construction industry.
This work involves scattered work locations, and there may be a discrepancy between standard cost estimation and actual construction conditions for common temporary facilities and on-site management costs. Therefore, common temporary facilities and on-site management costs will be calculated for each of the "Shimonohara Work Section (Work Location 1) and Nakanoho Work Section (Work Location 2)" using the "Estimation Method for Works with Scattered Work Locations".
2. Bidding Eligibility The qualifications required for participating in the bidding for this work are as follows.
Ai ①② ③ This work allows for the application of Special Full-time No. 1, Special Full-time No. 2, and Article 26-5 of the Construction Industry Act.
3. Contact Department Bidding Contact Department 0575-33-4011 Postal Code 501-3756 Gifu Prefecture Mino City Ikushi 1612-2 Work Contact Department 0575-33-4011 Gifu Prefectural Chuno General Branch Office 3rd Floor Gifu Prefectural Mino Civil Engineering Office Other Conditions Required Construction Industry Permit Road Division Road Second Section Since fiscal year 2011, within the pavement work stipulated by the Construction Industry Act that has been completed and handed over by the application deadline, experience as a chief engineer, supervising engineer, assistant supervising engineer, or site manager for a construction area of 1,100 square meters or more (experience as a chief engineer or supervising engineer includes experience under Special Full-time No. 1, Special Full-time No. 2 (including specially supervising engineers stipulated by the Construction Industry Act revised and enforced on October 1, Reiwa 2), and Article 26-5 of the Construction Industry Act).
In addition, experience as a chief engineer, supervising engineer, assistant supervising engineer, or site manager as a member of a joint venture is limited to those with an investment ratio of 40% or more.
Furthermore, in cases where the contract is concluded at a price below the low bid price investigation standard price, experience as an engineer additionally required by the Construction Industry Act, separate from the chief engineer, supervising engineer, or assistant supervising engineer, is excluded.
Classification Contract Price Amount of 10 million yen or more and less than 45 million yen (less than 90 million yen for general building construction) Comprehensive Evaluation Bidding System Project (Extension 318) Specific/General (Pavement Construction Business) The chief engineer or supervising engineer engaged in this work must meet the following criteria and be available at the start of the contract period for this work.
However, the person must be assigned full-time on the day the site work for this project begins.
Furthermore, full-time assignment is not required when applying Special Full-time No. 1 and Special Full-time No. 2, or when applying Article 26-5 of the Construction Industry Act.
Engineers assigned during the factory production or material procurement period, and periods without site work, do not need to be the same as the chief engineer or supervising engineer for site work. Engineers assigned during these periods may meet the following criteria (a) and be available at the start of the contract period for this work.
Furthermore, engineers assigned during the factory production period are not necessarily required to be full-time if production is carried out under an integrated management system with production for other similar work within the same factory.
However, full-time assignment is not required if any of the following (1) to (3) apply.
(Extension 304) Contact Department Phone Number / Pavement work stipulated by the Construction Industry Act, with a completed and handed-over construction area of 1,100 square meters or more. Pavement Construction Business / Comprehensive Score 730 points or more Gifu Prefecture Construction Work Bidding Eligibility List Registered Business Type / Comprehensive Score Construction Experience Conditions Deployed Engineer Conditions Business Location Conditions Consignee of Design Work, etc. Gifu Prefectural Mino Civil Engineering Office Consignee of Design Work, etc. for Target Projects None. General Affairs Division Management Coordination Section The head office is located in the Mino area shown in "Table 3" of "Form No. 1 Common Matters for Public Notice of Bidding (Post-Verification Type)" and is registered in the Gifu Prefecture Construction Work Bidding Eligibility List. As shown in "1. Matters Concerning Bidding Eligibility" of "Form No. 1 Common Matters for Public Notice of Bidding (Post-Verification Type)". Address Even for works with a contract price of 10 million yen or more and less than 45 million yen (less than 90 million yen for general building construction stipulated by the Construction Industry Act), the average construction performance evaluation score for the relevant work type (pavement) of Gifu Prefecture-ordered works in Reiwa 7 and 6 is 75 points or more (if there is no record of receiving orders for the relevant work type (pavement) of Gifu Prefecture-ordered works in Reiwa 7 and 6, the average construction performance evaluation score for the relevant work type (pavement) of Gifu Prefecture-ordered works in Reiwa 5 and 4 is 75 points or more). Conditions for concurrent positions of engineers However, for works ordered by the national government or Gifu Prefecture, construction performance evaluation scores below 65 points are excluded. From fiscal year 2011, by the application deadline, experience in constructing the following works as the prime contractor (experience as a member of a joint venture is limited to those with an investment ratio of 40% or more). A person with a Class 1 or Class 2 Civil Engineering Management Engineer (Civil Engineering) or a Professional Engineer (Construction Department) qualification, or an equivalent or higher qualification. Contract Price Amount Less than 10 million yen 4. Bidding Schedule Design Document Viewing (Mon) From 9:00 AM Download from electronic bidding system, etc. (Tue) Until 4:00 PM Question Submission (Mon) From 9:00 AM Via electronic bidding system (Thu) Until 4:00 PM *For paper bidders, please bring to the bidding contact department. Answer Viewing (Mon) From 9:00 AM Via electronic bidding system (Tue) Until 4:00 PM Also available for viewing at the bidding contact department (Mon) From 9:00 AM Via electronic bidding system (Mon) Until 4:00 PM (Wed) Until Via electronic bidding system (Mon) From 9:00 AM Via electronic bidding system (Tue) Until 4:00 PM Bid Opening (Wed) Via electronic bidding system From 9:00 AM At the Gifu Prefectural Mino Civil Engineering Office, 3rd Floor, Chuno General Branch Office (Thu) From 9:00 AM Bring to the bidding contact department (Fri) Until 4:00 PM Bring to the bidding contact department Written (Free Format) Written answers will be provided. Bid Results Publicly announced on the bidding information service or prefectural website. Also available for viewing at the bidding contact department. *For paper bidders, submission in person is permitted, but submissions by mail or facsimile will not be accepted. (Same period/dates) Note) Submission documents are described in "Form No. 1 Common Matters for Public Notice of Bidding (Post-Verification Type)". 5. Matters Concerning Comprehensive Evaluation Bidding System (1) Mechanism of Comprehensive Evaluation Bidding System The successful bidder for this work will be determined by the following method. ① A standard score of 100 points will be awarded if the bidding eligibility requirements are met. ② Additional points of up to 23 points will be awarded based on achievements shown in technical documents. ③ (2) Evaluation Items Evaluation Items: The following items will be evaluated. (a) Matters related to construction capability (b) Matters related to corporate capability (c) Matters related to the capability of the assigned engineer (d) Matters related to regional requirements (3) The assigned engineer will be evaluated based on their involvement in the site work for the commissioned project. Reiwa 8, July 9 Reiwa 8, July 6 Complaint Filing Within 7 days from the notification date of the notice of bidding participation or notice of ineligibility for bidding participation (excluding prefectural holidays) Reiwa 8, June 22 Reiwa 8, July 7 Reiwa 8, June 29 Submission of Bids Method/Location Period/Date Procedures Reiwa 8, July 2 Reiwa 8, June 22 Submission of Application Documents (Successful Bidder Candidate Only) Within 10 days from the day after the final day for filing complaints (excluding prefectural holidays) Reiwa 8, July 7 *For paper bidders, submission in person is permitted.
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on June 22, 2026. Last refreshed 8 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 岐阜県
岐阜県 has issued 397 procurement notices on BidsFactory, including 165 currently open and 53 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 6, 2026.
Frequently asked questions about this tender
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Who is the contracting authority?
This notice was issued by 岐阜県 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.