Tender No. 61_Protective Fence Renewal Construction
About This Opportunity
This is a works contract in the architecture and engineering and transport and logistics sectors, with a focus on Quantity Surveying, Warehousing, Transport Policy and Traffic Management. Located in Japan, Asia, this opportunity is open to firms and consortiums.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the architecture and engineering sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from JapaneseTender No. 61_Protective Fence Renewal Construction (File: 2.0MB)
General National Route 231 Sanada Jiko Bloom As As Road As Development Bureau Blk Library 6001 Asahi-machi 1-chome Street 6005 Asahi-machi 5-chome Street Suminoe-cho 2-chome GG6015 Suminoe 7-chome Street 0062 Nishi 9-chome Street 6011 Suminoe 3-chome Street 6016 Suminoe 8-chome Street 6017 Suminoe 9-chome Street Garage Apartment Building Warehouse Carport Storage Shed Garage Garage Suminoe-cho 1-chome Construction Name Drawing Name Creation Date Reiwa 8 Year Month Scale Drawing Number Company Name Business Name Hokkaido Rumoi City Protective Fence Renewal Construction 1/500 1 Plan View Reiwa 8 Fiscal Year Construction Start Reiwa 8 Fiscal Year Construction End SP=0.00 SP=197.272.00%0.26 Pedestrian/Vehicle Boundary Curb Type II Foundation Concrete (t=5cm) Drawing Name Creation Date Scale Company Name Business Name Protective Fence Renewal Construction Standard Cross-section 1/25 Reiwa 8 Year Month Hokkaido Rumoi City Construction Name Drawing Number 20.262.502.50 Surface Layer Recycled Fine Aggregate Asphalt Concrete t= 3cm Lower Layer Roadbed Co Recycled Aggregate 0-40mm Class t=10cm Frost Heave Suppression Layer Co Recycled Aggregate 0-80mm Class t=17cm0.30 Longitudinal Drainage φ450mm0.302.00%Right Side Left Side 300 Guard Pipe (Foundation Block Type Removable) GP-BP1-2.0E (Conduit φ139.8×4.5×400(mm)) Foundation Block (Conduit Embedded) 300×300×400(mm) Foundation Material Co Recycled Aggregate 0-80mm Class 100100800 4002001150 General National Route 231 Sanada Jiko Bloom As As Road As Development Bureau Blk Library 6001 Asahi-machi 1-chome Street 6005 Asahi-machi 5-chome Street ENTENTENTENT ENT ENT ENT ENTENT ENT ENT ENT ENTENT ENT ENT ENT ENT Suminoe-cho 2-chome ENT ENTENT ENTENT ENT ENT ENTENTENTGG6015 Suminoe 7-chome Street 0062 Nishi 9-chome Street 6011 Suminoe 3-chome Street 6016 Suminoe 8-chome Street 6017 Suminoe 9-chome Street ENTENT Garage Apartment Building Warehouse Carport Storage Shed Garage Garage Suminoe-cho 1-chome 4.00046.0008.00064.00032.0008.00010.0004.000 4.0006.00016.0004.0002.00017 units 33 units 5 units 3 units 24 units 5 units 6 units 3 units 3 units 4 units 9 units 3 units 2 units 10 units 18.00057.64953.21654.367 Curb Work Curb Work Construction Name Drawing Name Creation Date Reiwa 8 Year Month Scale Drawing Number Company Name Business Name Hokkaido Rumoi City Protective Fence Renewal Construction 1/500 Plan View 3 Safety Fence Installation Safety Fence Installation 8.0004.00023.627
Cost Breakdown Sheet Year Month Day To Company Name: Representative Name: Serial Number No. Construction Name Protective Fence Renewal Construction Unit Quantity Amount Road Improvement Suminoe 4-chome Street Lot 1 Structure Removal Work Lot 1 Protective Fence Removal Work Lot 1 Structure Demolition Work Lot 1 Curb Removal Work Lot 1 Transportation and Disposal Work Construction Classification/Type/Category - 1 - Cost Breakdown Sheet Construction Name Protective Fence Renewal Construction Unit Quantity Amount Construction Classification/Type/Category Lot 1 Paving Suminoe 4-chome Street Lot 1 Paving Work Lot 1 Paving Preparation Work Lot 1 Asphalt Paving Work Lot 1 Curb Work Lot 1 Curb Work Lot 1 Protective Fence Work Lot 1 Safety Fence Work Lot 1 Earthwork - 2 - Cost Breakdown Sheet Construction Name Protective Fence Renewal Construction Unit Quantity Amount Construction Classification/Type/Category Lot 1 Protective Fence Foundation Work Lot 1 Temporary Work Lot 1 Traffic Management Work Lot 1 Direct Construction Cost Lot 1 Including Material Costs Lot 1 Including Labor Costs Lot 1 Common Temporary Work Lot 1 Common Temporary Work (Ratio Calculation) Lot 1 Net Construction Cost - 3 - Cost Breakdown Sheet Construction Name Protective Fence Renewal Construction Unit Quantity Amount Construction Classification/Type/Category Lot 1 Site Management Cost Lot 1 Including Employer's Share of Statutory Welfare Costs Lot 1 Including Payments to the Construction Worker's Pension Fund Lot 1 Construction Cost Lot 1 Including Safety and Health Expenses Lot 1 General Administrative Costs, etc. Lot 1 Construction Price (= Bidder's Estimated Price) Lot 1 Note 1 When submitting the breakdown sheet in electronic file format, please attach it to the bid with the company name (or JV name) written on it.
When submitting the breakdown sheet in paper format, it requires the same signature and seal as the bid.
2. Please do not include any unfounded rounding or reduction in the name of "discount", "adjustment amount", "good faith discount", etc.
Cost Breakdown Sheet_xlfn.IFERROR&C&16Cost Breakdown Sheet&L&R&C- &P -Year Month Day,To,,Company Name:,Representative Name:,Serial Number,No.,Construction Name,Protective Fence Renewal Construction,,Construction Classification/Type/Category,Unit,Quantity,Amount,Road Improvement,,,Suminoe 4-chome Street,Lot,1,,,,Structure Removal Work,,,,Lot,1,,,,Protective Fence Removal Work,,,,Lot,1,,,,Structure Demolition Work,,,,Lot,1,,,,Curb Removal Work,,,,Lot,1,,,,Transportation and Disposal Work,,,,Lot,1,,,,Paving,,,Suminoe 4-chome Street,Lot,1,,,,Paving Work,,,,Lot,1,,,,Paving Preparation Work,,,,Lot,1,,,,Asphalt Paving Work,,,,Lot,1,,,,Curb Work,,,,Lot,1,,,,Curb Work,,,,Lot,1,,,,Protective Fence Work,,,,Lot,1,,,,Safety Fence Work,,,,Lot,1,,,,Earthwork,,,,Lot,1,,,,Protective Fence Foundation Work,,,,Lot,1,,,,Temporary Work,,,,Lot,1,,,,Traffic Management Work,,,,Lot,1,,,,Direct Construction Cost,,,,Lot,1,,,,Including Material Costs,,,,Lot,1,,,,Including Labor Costs,,,,Lot,1,,,,Common Temporary Work,,,,Lot,1,,,,Common Temporary Work (Ratio Calculation),,,,Lot,1,,,,Net Construction Cost,,,,Lot,1,,,,Site Management Cost,,,,Lot,1,,,,Including Employer's Share of Statutory Welfare Costs,,,,Lot,1,,,,Including Payments to the Construction Worker's Pension Fund,,,,Lot,1,,,,Construction Cost,,,,Lot,1,,,,Including Safety and Health Expenses,,,,Lot,1,,,,General Administrative Costs, etc.,,,,Lot,1,,,,Construction Price (= Bidder's Estimated Price),,,,Lot,1,,,,Note 1 When submitting the breakdown sheet in electronic file format, please attach it to the bid with the company name (or JV name) written on it.
When submitting the breakdown sheet in paper format, it requires the same signature and seal as the bid.
, 2. Please do not include any unfounded rounding or reduction in the name of "discount", "adjustment amount", "good faith discount", etc.
,
Mirror (Excluding Monetary Amount Specified) - 1 -26-15-A0-0239-0 This reference material is for calculating the bid price and does not impose contractual restrictions.
FY2026 Construction Hokkaido Rumoi City Protective Fence Renewal Construction Design Document Unit 1 Page Reference Material Mirror (Cost Estimation Information) Rumoi City Actual Construction Period: 202 days 2026/08/05 - 2027/02/22 (202 days) Page 2 Construction Site Name 2027/02/ - 2 - G00: Rumoi Construction Management Department Total Materials G02: Rumoi City Construction Designer Normal Construction Period Road Improvement Construction Fuel Materials Construction Period Setting Port Stone Winter Labor Adjustment 2026/08/04 Applicable Work Type Stone Materials Bidding Date (Opening Date) Design Document Number - 2026/08/ 2026/06/05 Winter Labor Adjustment: 26-15-A0-0239-0 Estimation Period Time Constraints: Construction Concrete 2026/06/12 17:16:03 Unit Price Applicable Year Month 26-15-A0-0239-0 Region Time Constraints None General Civil Engineering 2026/06/05 Work Rate Applicable Year Month Completion Deadline: 2027/02/22 Applicable Unit Price Applicable Unit Price G01: Rumoi City, Mashike Town, Obihirō Town G01: Rumoi City, Obihirō Town (West) None Cost Estimation Information Mirror (Construction Outline Table) 3 7 Construction 6 Water System/Road River Name Guard Pipe L=226m Project Type No. 2 Construction Outline Table - 3 - Construction Location Suminoe 4-chome Street Suminoe-cho 1-chome et al. Key Road Stock Improvement Project [Suminoe 4-chome Street] 26-15-A0-0239-0 Cost Item 4 Construction Outline Protective Fence Renewal Construction Initial Bridge Name, etc. Construction Cost 5 Overhead Information - 4 - City Area Adjustment No No Site Environment Improvement Cost Emergency Construction Adjustment Adjustment None (For rural areas where the construction site is not affected by general traffic, etc.) Adjustment by Advance Payment Ratio Construction Area Adjustment General Administrative Costs, etc. Inclusion Yes/No No Main Construction Type Common Temporary Work Construction Area Adjustment 4 weeks 8 holidays or more (monthly basis) (R6 Standard) Construction Period Extension, etc. Number of Days Included Adjustment None (For rural areas where the construction site is not affected by general traffic, etc.) Adjustment None Construction Area Adjustment ICT Adjustment City Area Adjustment None (For rural areas where the construction site is not affected by general traffic, etc.) 2026/06 35% or more Adjustment related to contract security Extension Period Final Day Standard Month/Year No Overhead Information Snow Removal Adjustment Foundation, etc. Adjustment No 26-15-A0-0239-0 04: Road Improvement Construction Sabo/Landslide Construction Adjustment Weekly Holiday 2-day System Adjustment No 0 days Site Management Cost Site Maintenance Cost due to Construction Period Extension, etc. Design Summary Table Amount Increase/Decrease 1 1 Initial Construction Type Asphalt Paving Work Protective Fence Renewal Construction Lot Structure Removal Work 1 Quantity Increase/Decrease 1 Design Summary Table Lot Road Improvement Unit Price Quantity 1 Curb Work Lot Paving Work Unit 1 Road Improvement Protective Fence Removal Work 1 Lot Amount Road Construction/Renovation Lot Lot Lot Construction Classification/Type/Category 1 Summary Project Classification 1 Construction Name Curb Work Paving Curb Work Structure Demolition Work Transportation and Disposal Work - 1 - 1 Lot 1 Lot Lot Lot Protective Fence Work Paving Preparation Work 26-15-A0-0239-0 Lot Lot Amount Increase/Decrease Construction Price 1 1 Initial Construction Type Net Construction Cost General Administrative Costs, etc. Protective Fence Renewal Construction Lot 1 Quantity Increase/Decrease Earthwork Construction Cost 1 Site Management Cost Design Summary Table Safety Fence Work Lot Unit Price Quantity 1 Lot Unit 1 1 Lot Construction Classification/Type/Category Common Temporary Work (Ratio Calculation) 1 - 2 - Summary Project Classification 1 Construction Name Paving Temporary Work Direct Construction Cost 1 Traffic Management Work Lot 1 Lot Lot Protective Fence Foundation Work Common Temporary Work 1 Amount Increase/Decrease Common Temporary Work Consumption Tax Equivalent Amount Initial Construction Type Protective Fence Renewal Construction Quantity Increase/Decrease - 3 - Design Summary Table Unit Price Quantity Lot Unit 1 Amount Road Construction/Renovation Construction Cost Total Construction Classification/Type/Category 1 Summary Project Classification Construction Name 26-15-A0-0239-0 Lot Construction Cost Summary Table - 1 - (Including Consumption Tax, etc.) Consumption Tax Equivalent Amount Cost Item Construction Cost Machinery and Equipment Costs Construction Price Emergency Construction Cost Miscellaneous Construction Costs Contract Amount Contract Guarantee Survey and Testing Costs Building Expenses Applicable Construction Cost Summary Table (Excluding Consumption Tax, etc.) Note: Upper row is current design, lower row is design change Land Acquisition and Compensation Costs Construction Cost Attached Construction Cost Design Breakdown Pavement Cutting Suminoe 4-chome Street Structure Removal Work Weekly Holiday Yes 200 Quantity Protective Fence (Cross/Fall Prevention Fence) Removal 1 Summary 360 226 Main Construction Type Lot Weekly Holiday Yes Road Construction/Renovation Asphalt Pavement 15cm or less m2 m Unit - No. 3 Construction Name Structure Demolition Work m3 Transportation and Disposal Work 220 Lot m Unreinforced Structure Mechanical Construction Initial Construction Classification/Type/Category/Subcategory Road Improvement Lot Weekly Holiday Yes 1 Lot Disposal Weekly Holiday Yes Unit - No. 5 Curb Removal Work 1 Construction Classification 29 Protective Fence Removal Work Project Classification Weekly Holiday Yes Lot Lot Concrete Structure Demolition 1 Specification Unit Price Quantity Increase/Decrease Pedestrian/Vehicle Boundary Block Removal Asphalt Pavement 3cm 1m Pavement Cutting - 1 - 1 Protective Fence Renewal Construction No Adjustment Lot Construction Classification/Type/Category/Subcategory Road Improvement Lot Weekly Holiday Yes Unit - No. 4 Sludge Tonite Cement Milk, Jacking, Piles [Recycled Waste Acceptance] | 2t Truck [Dump Truck (Off-road Diesel) Type] Quantity Paving Summary 1 Unit - No. 11 Main Construction Type Concrete Shell (Unreinforced) Weekly Holiday Yes Road Construction/Renovation m3 | Dump Truck (Off-road Diesel) Type] Shell Transport 7 Approximate m3 Construction Name Unit - No. 9 Shell Disposal n Road-Diesel Type] | 10t Truck [ Shell Transport Unit - No. 6 Suminoe 4-chome Street Asphalt Shell Work | 2-3t Asphalt Shell Weekly Holiday Yes Pavement, Side Ditch, Cutter, etc.)] - 2 - m3 Project Classification Weekly Holiday Yes Cost | Moisture Content over 85% (Ben t Lot [Dump Truck (Off-road Diesel) Type] Unit - No. 8 Specification Unit Paving Work Type Good Service Date Approximate Unit Price Quantity Increase/Decrease 1 0.1 Approximate Protective Fence Renewal Construction No Adjustment Amount Amount Increase/Decrease Road Improvement Construction Lot Road Improvement 26-15-A0-0239-0 Design Breakdown Construction Area 7 mm,
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on July 1, 2026. Last refreshed 8 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 北海道留萌市
北海道留萌市 has issued 44 procurement notices on BidsFactory, including 11 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: July 31, 2026.
Frequently asked questions about this tender
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Who is the contracting authority?
This notice was issued by 北海道留萌市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.