Tenders/Announcement No. 8 Nankai Trough Great Earthquake Old Mineral Mining Area Disaster Prevention Measures Project Phase 8 Disaster Prevention Work
Open🇯🇵JapanWorks

Announcement No. 8 Nankai Trough Great Earthquake Old Mineral Mining Area Disaster Prevention Measures Project Phase 8 Disaster Prevention Work

Auto-translated from Japanese
Original title: 公告第8号 南海トラフ巨大地震旧鉱物採掘区域防災対策事業 第8期防災工事
岐阜県御嵩町
Published: May 13, 2026
Updated: Jun 14, 2026
Source: jp_kkj

About This Opportunity

公告第8号 南海トラフ巨大地震旧鉱物採掘区域防災対策事業 第8期防災工事 — works tender in Japan, 岐阜県御嵩町. Published 2026.

This is a works contract in the mining and extractives and humanitarian aid sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the mining and extractives sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese

Announcement No. 8 Nankai Trough Great Earthquake Old Mineral Mining Area Disaster Prevention Measures Project Phase 8 Disaster Prevention Work
Mitake Town Announcement Contract No. 8 Regarding the following construction work, post-verification type conditional public competitive bidding will be conducted, and this is announced in accordance with the provisions of Articles 2 and 3 of the Mitake Town Contract Regulations (Showa 39 Mitake Town Ordinance No. 7). May 13, Reiwa 8 (2026) Mayor of Mitake Town, Yukinobu Watanabe 1. Matters Related to Bidding (1) Specification Number Mitake-A-Ko No. 8-3 (2) Construction Name Nankai Trough Great Earthquake Old Mineral Mining Area Disaster Prevention Measures Project Phase 8 Disaster Prevention Work (3) Place of Performance, etc. Within Fushimi, Mitake Town (4) Construction Outline [Basic Design: Liquefaction Treatment Method] Void Filling Work 1 set (Countermeasure Area: Mid-layer: A=65,929m2, Three-layer: A=16,290m2) Drilling work Filling holes N=618 locations, Investigation holes N=40 locations Filling work End filling material B V=16,821m3 Intermediate filling material V=29,997m3 Temporary filling equipment work 1 set [Reference Design: Two-layer End Filling Method] Void Filling Work 1 set (Countermeasure Area: Mid-layer: A=65,929m2, Three-layer: A=16,290m2) Drilling work Filling holes N=948 locations, Investigation holes N=53 locations Filling work End filling material V=8,250m3 Second end filling material V=6,356m3 Intermediate filling material V=31,733m3 Temporary filling equipment work 1 set (5) Performance Period From the date of contract conclusion to June 30, Reiwa 10 (2028) (6) Estimated Price Post-disclosure (7) Low Bid Investigation Price Yes (8) Disqualification Criteria Yes (9) Minimum Restriction Price None (10) Submission of Breakdown Required *If the breakdown is not submitted, the bid will be invalidated, so please be aware. (11) Bid Bond Exempt (12) Bidding Method [Electronic Bidding] However, if it is difficult to use the electronic bidding system, written submission may be permitted only with the approval of the contracting party. (13) Contract Method This contract will be conducted primarily through electronic contract. (14) Work with Optional Period Setting Not applicable (15) Provisional Contract Yes 2. Bidding Participation Qualifications This construction will be conducted through public competitive bidding by a single entity or a specific construction joint venture (hereinafter referred to as "joint venture"). i) Qualifications required for participation in the bidding for this construction as a single entity are as follows. Required Construction Business Permit Civil Engineering Contractor Business Type and Total Score Business Type: Construction Contract [Civil Engineering All Types] - Must be registered in the Mitake Town Competitive Bidding Participant Qualification Register for the above business items. - As of the announcement date of this construction, must meet the comprehensive evaluation score for each of the following regional classifications for the above business type stipulated by the Construction Business Act (Showa 24 Act No. 100). Within Town A Within Town B Kamo Within Prefecture Outside Prefecture 750 points or more 750 points or more 1,000 points or more 1,200 points or more 1,200 points or more Construction Performance Conditions Must have at least one construction performance record for void filling work (1,000m3 or more) as the prime contractor, either as a single entity or as a joint venture, ordered by the national government, special corporations, local governments, local public corporations, public interest corporations, or land readjustment associations. However, performance as a member of a joint venture is limited to cases where the capital contribution ratio is 40% or more. *Underground voids refer to artificially created voids such as lignite mining voids and special underground tunnels. Placement of Technical Personnel Conditions Must be able to appropriately place a chief technical personnel or supervising technical personnel for this construction at the construction site in accordance with the provisions of the Construction Business Act (Showa 24 Act No. 100). Conditions for Location of Business Office Must have a registered business office, etc., in Gifu Prefecture, Aichi Prefecture, or Mie Prefecture in the Mitake Town Competitive Bidding Participant Qualification Register (Construction Contract). Contractors for Design and Other Services Not applicable Other Conditions (1) The conclusion of the contract for this bid is subject to the approval of the plan change application under Article 8, Paragraph 2 of the "Gifu Prefecture Nankai Trough Great Earthquake Old Mineral Mining Area Disaster Prevention Measures Project Subsidy (Ground Weakness Survey and Disaster Prevention Work Portion)" Grant Guidelines, and the resolution of the Mitake Town Assembly under Article 96, Paragraph 1, Item 5 of the Local Autonomy Act (Showa 22 Act No. 67) and Article 2 of the Ordinance on Contracts and Acquisition or Disposal of Property Subject to Resolution by the Mitake Town Assembly (Showa 39 Ordinance No. 6). If the contract cannot be concluded even after a considerable period has passed since the provisional contract, the provisional contract may be terminated by mutual agreement. Furthermore, even if the contractor incurs damages due to the above, the town shall not be held responsible for such damages. (2) Must be able to perform the matters stipulated in the specifications and special specifications. (3) Must not fall under the provisions of Article 167-4 of the Local Autonomy Act Enforcement Regulations (Showa 22 Cabinet Order No. 16). (4) Must not be within a suspension period based on the Mitake Town Competitive Bidding Qualification Suspension Measures Ordinance (Heisei 4 Administrative Order Ko No. 8). (5) Must be able to appropriately place each technical personnel for this work in accordance with the provisions of the Construction Business Act. (6) Must not be delinquent in corporate inhabitant tax or other local taxes. (7) Must not have filed for commencement of rehabilitation proceedings under Article 17, Paragraph 1 of the Corporate Rehabilitation Act (Heisei 14 Act No. 154), nor have had such proceedings filed against them under Paragraph 2 of the same Article. (8) Must not have filed for commencement of rehabilitation proceedings under Article 21, Paragraph 1 of the Civil Rehabilitation Act (Heisei 11 Act No. 225), nor have had such proceedings filed against them under Paragraph 2 of the same Article. (9) Must not have received a suspension of bidding eligibility from Mitake Town based on the "Mitake Town Ordinance on Measures to Exclude Organized Crime Groups from Contracts (Heisei 22 Administrative Order Ko No. 41)" between the application deadline for confirmation of bidding eligibility and the bidding date, or not fall under the measures criteria listed in the appendix of the same ordinance. Confirmation of Eligibility Documents (Successful Bidder Only) The successful bidder must submit the following documents by the deadline. - Application for Confirmation of Eligibility for Conditional Public Competitive Bidding [Post-Verification Type] Attached documents - Statement of Business Office Status (Required only when applying from a business office not registered) - Statement of Construction Performance Records as stipulated in the bidding eligibility conditions ii) Qualifications required for participation in the bidding for this construction as a joint venture are as follows. Bidding Participation Conditions Requirements regarding capital contribution ratio, etc., of constituent members: The number of constituent members of the joint venture shall be 2 or 3, and the formation shall be voluntary. The capital contribution ratio of each constituent member shall be 30% or more for 2 members, and 20% or more for 3 members. Required Construction Business Permit Civil Engineering Contractor Business Type and Comprehensive Evaluation Score Business Type: Construction Contract [Civil Engineering All Types] - Must be registered in the Mitake Town Competitive Bidding Participant Qualification Register for the above business items. - As of the announcement date of this construction, the representative constituent member (the one with the largest capital contribution ratio among the constituent members) and other constituent members must meet the comprehensive evaluation score for each of the following regional classifications for the above business type stipulated by the Construction Business Act (Showa 24 Act No. 100). Must have been operating for 3 years or more with a permit for the above business type stipulated by the same Act. Within Town A Within Town B Kamo Within Prefecture Outside Prefecture 750 points or more 750 points or more 1,000 points or more 1,200 points or more 1,200 points or more Construction Performance Conditions The representative constituent member must have at least one construction performance record for void filling work (1,000m3 or more) as the prime contractor, either as a single entity or as a joint venture, ordered by the national government, special corporations, local governments, local public corporations, public interest corporations, or land readjustment associations. However, performance as a member of a joint venture is limited to cases where the capital contribution ratio is 40% or more. *Underground voids refer to artificially created voids such as lignite mining voids and special underground tunnels. Placement of Technical Personnel Conditions The representative constituent member must be able to appropriately place a chief technical personnel or supervising technical personnel for this construction at the construction site in accordance with the provisions of the Construction Business Act (Showa 24 Act No. 100). Conditions for Location of Business Office The representative constituent member and other constituent members must have a registered business office, etc., in Gifu Prefecture, Aichi Prefecture, or Mie Prefecture in the Mitake Town Competitive Bidding Participant Qualification Register (Construction Contract). Contractors for Design and Other Services Not applicable Other Conditions (1) The conclusion of the contract for this bid is subject to the approval of the plan change application under Article 8, Paragraph 2 of the "Gifu Prefecture Nankai Trough Great Earthquake Old Mineral Mining Area Disaster Prevention Measures Project Subsidy (Ground Weakness Survey and Disaster Prevention Work Portion)" Grant Guidelines, and the resolution of the Mitake Town Assembly under Article 96, Paragraph 1, Item 5 of the Local Autonomy Act (Showa 22 Act No. 67) and Article 2 of the Ordinance on Contracts and Acquisition or Disposal of Property Subject to Resolution by the Mitake Town Assembly (Showa 39 Ordinance No. 6). If the contract cannot be concluded even after a considerable period has passed since the provisional contract, the provisional contract may be terminated by mutual agreement. Furthermore, even if the contractor incurs damages due to the above, the town shall not be held responsible for such damages. (2) Must be able to perform the matters stipulated in the specifications and special specifications. (3) Must not fall under the provisions of Article 167-4 of the Local Autonomy Act Enforcement Regulations (Showa 22 Cabinet Order No. 16). (4) Must not be within a suspension period based on the Mitake Town Competitive Bidding Qualification Suspension Measures Ordinance (Heisei 4 Administrative Order Ko No. 8). (5) Must be able to appropriately place each technical personnel for this work in accordance with the provisions of the Construction Business Act. (6) Must not be delinquent in corporate inhabitant tax or other local taxes. (7) Must not have filed for commencement of rehabilitation proceedings under Article 17, Paragraph 1 of the Corporate Rehabilitation Act (Heisei 14 Act No. 154), nor have had such proceedings filed against them under Paragraph 2 of the same Article. (8) Must not have filed for commencement of rehabilitation proceedings under Article 21, Paragraph 1 of the Civil Rehabilitation Act (Heisei 11 Act No. 225), nor have had such proceedings filed against them under Paragraph 2 of the same Article. (9) Must not have received a suspension of bidding eligibility from Mitake Town based on the "Mitake Town Ordinance on Measures to Exclude Organized Crime Groups from Contracts (Heisei 22 Administrative Order Ko No. 41)" between the application deadline for confirmation of bidding eligibility and the bidding date, or not fall under the measures criteria listed in the appendix of the same ordinance. Confirmation of Eligibility Documents (Successful Bidder Only) The successful bidder must submit the following documents by the deadline. - Application for Confirmation of Eligibility for Conditional Public Competitive Bidding [Post-Verification Type] Attached documents - Statement of Business Office Status (Required only when applying from a business office not registered) - Statement of Construction Performance Records as stipulated in the bidding eligibility conditions 3. Department Section Department Name Phone Number Address Bidding Section Mitake Town General Affairs Department General Affairs Division Finance Section 0574-67-2111 (Ext. 2306) Postal Code 505-0192 Mitake, Mitake Town, Kani District 1239-1 Business Section Mitake Town Construction Department Lignite Mine Abandoned Pit Countermeasures Office 0574-67-2111 (Ext. 2231) 4. Bidding Schedule Procedures, etc. Period/Date Method/Location Viewing of Design Documents From 1:00 PM on Wednesday, May 13, Reiwa 8 (2026) until the day of award determination. Download from Mitake Town website or electronic bidding system. Acceptance of Questions From 1:00 PM on Wednesday, May 13, Reiwa 8 (2026) to 12:00 PM on Tuesday, May 19, Reiwa 8 (2026). Via input form on the website. Viewing of Answers As responses are processed, they will be sequentially posted on the Mitake Town website. Application for Bidding Participation From 1:00 PM on Wednesday, May 13, Reiwa 8 (2026) to 4:00 PM on Friday, May 29, Reiwa 8 (2026). Via electronic bidding system. Submit "Application for Confirmation of Eligibility for Conditional Public Competitive Bidding (Construction)" or "Application for Confirmation of Eligibility for Conditional Public Competitive Bidding (Specific Construction Joint Venture)". Confirmation of Eligibility From 9:00 AM on Monday, June 1, Reiwa 8 (2026). Via electronic bidding system. Acceptance of Bid Submission From 9:00 AM on Wednesday, June 3, Reiwa 8 (2026) to 4:00 PM on Thursday, June 4, Reiwa 8 (2026). Via electronic bidding system. Bid Opening From 9:30 AM on Friday, June 5, Reiwa 8 (2026). Via electronic bidding system. Submission of Confirmation Documents for Successful Bidder Candidates By 4:00 PM on Tuesday, June 9, Reiwa 8 (2026). Bring or mail to the bidding section. *For paper bids, all documents must be submitted in person; submission by mail or electronic transmission is not accepted (period and date are the same). *Acceptance of Questions (Mitake Town HP > For Businesses > Bidding Information > Regarding Question Submission Methods for Bidding) *Attendance at bid opening is not required, but please contact the bidding section in advance if you wish to attend. *The successful bidder will be notified by phone on the day of bid opening. The results will generally be posted on the website the following week. 5. Matters Concerning Post-Verification of Bidding Participation Qualifications (1) After the bid opening, the award decision will be suspended, and the bidder who submitted the lowest valid bid within the range of the estimated price and the low bid investigation price or minimum restriction price (hereinafter referred to as "successful bidder candidate") will be required to submit documents necessary for confirming bidding participation qualifications (hereinafter referred to as "confirmation application documents, etc.") for qualification confirmation. (2) Confirmation application documents, etc., must be submitted to the contracting party by the specified deadline. (3) If a bidder who meets the bidding participation qualifications no longer meets them by the bidding date (bid opening), they shall not be allowed to participate in the bid. (4) Those wishing to withdraw their bidding application must submit a written statement with reasons to the Mitake Town General Affairs Division by the day before the bidding date (bid opening). 6. Work with Optional Period Setting In the case of work with an optional period setting, the following items shall apply. (1) This construction is a project with an optional period set to ensure a smooth construction execution system for the contractor, allowing for preparation of construction materials, labor, etc., in advance. The contractor can arbitrarily set the construction start date within the construction start deadline indicated by the contracting party. (2) The construction start date cannot be a holiday. Setting a construction start date where the end of the construction period falls on a holiday is also not permitted. (3) The contractor must notify the construction start date using the format specified by the contracting party within 3 days from the day after the award decision date. (4) An optional period does not require the placement of a chief technical personnel or supervising technical personnel, or a site manager. (5) During the optional period, preparation of materials not brought to the site, etc., can be carried out, but work such as bringing materials to the site or installing temporary structures must not be started. Preparation carried out during the optional period shall be at the contractor's responsibility. (6) If the contract is concluded after the construction start deadline due to low bid price investigation, etc., the optional period cannot be set. 7. Other (1) If bidding or bid opening cannot be conducted due to natural disasters or other unavoidable reasons, it shall be canceled. Also, if there is only one bidder, the bid may be canceled. Any damages incurred in such cases shall be borne by the bidder. (2) Procedures such as submission of applications and viewing of design documents shall be conducted on days other than Sundays, Saturdays, national holidays, and other official holidays, within the bidding schedule above. (For electronic bidding, it shall be conducted via the electronic bidding system.) (3) If a price standard for low bid price investigation is set, and the bid price of the bidder who submitted the lowest bid within the limit of the estimated price is such that the fulfillment of the contract content by that bidder cannot be ensured, or if it is deemed significantly inappropriate to conclude a contract with that bidder as it would disrupt the order of fair trade, that bidder may not be selected as the successful bidder, and the bidder who submitted the lowest bid within the limit of the estimated price may be selected as the successful bidder.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on May 13, 2026. Last refreshed 11 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 岐阜県御嵩町

岐阜県御嵩町 has issued 19 procurement notices on BidsFactory, including 16 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Humanitarian & Emergency Response. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: June 17, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by 岐阜県御嵩町 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Mining & Extractives sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

岐阜県御嵩町
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.