Announcement of General Competitive Tender for Contract for Goods Flow Survey Work for the Chukyo Metropolitan Area Comprehensive Urban Transportation System Survey for Reiwa 8
Form No. 1 [Post-Examination Type] Tender Announcement
Announcement of General Competitive Tender for Contract for Goods Flow Survey Work for the Chukyo Metropolitan Area Comprehensive Urban Transportation System Survey
We will conduct a post-examination type general competitive tender for the Contract for Goods Flow Survey Work for the Chukyo Metropolitan Area Comprehensive Urban Transportation System Survey, in accordance with the provisions of Article 127 of the Gifu Prefecture Accounting Regulations (1957, Gifu Prefecture Ordinance No. 19).
This tender will be executed using the electronic bidding system. However, if you have changed your trade name, address, or representative and have not yet updated your IC card, please participate using a paper bid. If you continue to use your IC card, your bid may be invalidated or you may be subject to suspension of bidding qualifications. Please contact us if you have any questions.
September 2, Reiwa 8
Governor of Gifu Prefecture, Yoshihide Ezaki
1. Contract for General Competitive Tender:
(1) Specification Number: No. Logistics 1
(2) Contract Name: Contract for Goods Flow Survey Work for the Chukyo Metropolitan Area Comprehensive Urban Transportation System Survey (Electronic Bidding Target Project)
(3) Contract Location: Throughout Gifu Prefecture
(4) Contract Outline: As per the work specifications
(5) Contract Period: From the date of contract until March 24, Reiwa 9
(6) Estimated Price: 7,156,600 yen (including consumption tax and local consumption tax)
(7) Low Bid Price Investigation System: Yes
(8) Minimum Reserve Price System: No
(9) This contract will be executed using the electronic bidding system.
However, if it is difficult to use the electronic bidding system, written submission may be permitted with prior approval from the disbursing officer.
2. Tender Participation Qualifications:
This work is a general competitive tender for individual entities.
The qualifications required for tender participants are as follows.
Unless otherwise specified, tender qualifications shall be as of the deadline for submission of the tender participation application for the relevant work (hereinafter referred to as "Application Deadline").
Regarding Tender Participation Qualifications:
a. Not falling under the provisions of Article 167-4 of the Local Autonomy Act Enforcement Order (1947, Cabinet Order No. 16) (hereinafter referred to as "Enforcement Order").
b. Must be listed in the Gifu Prefecture Construction Work Tender Participant List under Construction-Related Work (Surveying, Construction Consulting, etc. Work (Urban Planning and Regional Planning)).
c. For those who have filed for commencement of reorganization proceedings under Article 17 of the Corporate Reorganization Act (2002, Act No. 154) (hereinafter referred to as "Corporate Reorganization Act"), a decision to approve the reorganization plan under Article 199 or 200 of the same Act must have been received.
d. For those who have filed for commencement of civil rehabilitation proceedings under Article 21 of the Civil Rehabilitation Act (1999, Act No. 225) (hereinafter referred to as "Civil Rehabilitation Act"), a decision to approve the rehabilitation plan under Article 174, Paragraph 1 of the same Act must have been received.
e. Not subject to tender participation qualification suspension measures (hereinafter referred to as "Qualification Suspension Measures") under the Gifu Prefecture Construction Contract Tender Participation Qualification Suspension Measures Guidelines (April 1, Reiwa 13, Technical Inspection No. 12) during the period from the Application Deadline to the date of award decision for the relevant work.
f. Not subject to tender participation qualification suspension measures under the Gifu Prefecture Measures Guidelines for Exclusion of Violent Groups from Contracts, or not meeting the exclusion criteria listed in the attached table of the same Guidelines, by the bid opening date.
g. There shall be no relationship between tender participants that falls under any of the following criteria. If such a relationship exists, contacting the parties to decide who will withdraw shall not be considered an unfair act such as bid rigging.
① Capital Relationship: In cases falling under any of the following. However, this excludes cases where a subsidiary (as defined in Article 2, Item 3 of the Companies Act (2005, Act No. 86) (hereinafter referred to as "Companies Act")) or a parent company (as defined in Article 2, Item 4 of the Companies Act (hereinafter referred to as "Parent Company")) is subject to a decision to commence rehabilitation proceedings under the Civil Rehabilitation Act or a decision to commence reorganization proceedings under the Corporate Reorganization Act.
a. Relationship between a parent company and a subsidiary.
b. Relationship between subsidiaries with the same parent company.
② Personnel Relationship: In cases falling under any of the following. However, case a excludes cases where one of the companies is undergoing reorganization or rehabilitation proceedings.
a. An officer of one company concurrently serves as an officer of the other company.
b. An officer of one company concurrently serves as a trustee (trustee as defined in Article 67 of the Corporate Reorganization Act and trustee as defined in Article 64 of the Civil Rehabilitation Act) of the other company.
③ Other: Cases where it is recognized that the fairness of the tender is hindered, or where there is a capital or personnel relationship equivalent to those described in ① and ② above.
h. Must have experience in PT surveys and logistics surveys commissioned by national, prefectural, or municipal governments, completed and delivered on or after Reiwa 28 (within the 10 fiscal years preceding the fiscal year of the tender announcement) by the Application Deadline.
3. Tender Participation Application Procedures:
(1) Applicants wishing to participate in the tender (hereinafter referred to as "Applicants") must fill in the necessary information on the "Tender Participation Application" screen of the electronic bidding system and submit it by the Application Deadline. For paper bidders, submit the Tender Participation Application (Appendix Form 1) of the Gifu Prefecture Prefectural Development Department General Competitive Tender Trial Guidelines (Construction-Related Work Comprehensive Evaluation Bidding Method) (July 1, Reiwa 23, Technical Inspection No. 231) by the Application Deadline.
(2) Applicants who do not submit the Tender Participation Application by the Application Deadline cannot participate in the tender.
(3) Applicants must receive notification via the Tender Participation Notice.
(4) Errors or omissions in the application submitted by the Application Deadline may result in invalidation.
(5) Applications shall be handled as follows:
a. Must be prepared in the format specified in the tender announcement.
b. Costs for preparation and submission shall be borne by the applicant.
c. Shall not be used for any purpose other than tender participation and application for additional points.
d. Shall not be returned to the applicant.
e. Replacement or resubmission after the Application Deadline is not permitted.
4. Questions and Answers Regarding Design Documents:
(1) If applicants have questions regarding the design documents, they must submit a question form via the electronic bidding system within the submission period specified by the disbursing officer. For paper bidders, submit a question form (free format) in person.
(2) If the disbursing officer receives a question form from an applicant, the answer to the question will be provided via the electronic bidding system. It will also be made available for viewing at the procuring organization.
5. Bid Execution Procedures:
(1) Bidding will be conducted for applicants who have been permitted to participate in the tender via the notification in 3(3) (hereinafter referred to as "Bidders"). Electronic bidding system users must submit tender documents (tender form and breakdown of tender price corresponding to the tender amount indicated in the tender form, hereinafter the same) via the electronic bidding system within the submission period instructed by the disbursing officer. If you wish to withdraw your bid, submit a Bid Withdrawal Notice.
For paper bidders, submit a copy of the Tender Participation Notice along with the tender documents (tender form in Tender Instructions Form 1) at the time of bid opening (if an agent is bidding, refer to Article 2, Paragraph 4 of the Tender Instructions). If you wish to withdraw your bid, submit a Bid Withdrawal Notice (Appendix Form 2 of the Electronic Bidding Operation Standards).
(2) Prior to bid execution, paper bidders must submit a copy of their Tender Participation Notice.
(3) The successful bid price will be the amount obtained by adding 10% of the amount written in the tender form to the amount written in the tender form (rounded down to the nearest yen if there is a fraction of less than 1 yen). Therefore, tenderers, regardless of whether they are taxable or exempt from consumption tax, must write the amount equivalent to 100/110 of their estimated contract amount in their tender documents.
(4) If the estimated price is publicly announced in advance, and the estimated contract amount exceeds the estimated price, please withdraw your bid. Withdrawal of a bid will not result in any disadvantageous treatment.
Furthermore, submitting a tender document with an amount exceeding the estimated price may result in suspension of participation qualifications due to dishonest conduct.
(5) The breakdown of costs shall be prepared based on the specifications in the design documents, but output from the tender participant's cost calculation software is also acceptable. However, the content must clearly indicate at least quantities, unit prices, and amounts. If the breakdown of costs falls under any of the following, it may be invalidated:
a. The total amount in the breakdown does not match the bid amount.
b. Items that should be included are missing.
c. Includes a lump-sum discount.
d. Rounded or adjusted fractions.
e. Other deficiencies.
(6) Bid opening will be conducted immediately after the tender is closed, with the participation of bidders or their agents (hereinafter referred to as "Bidders"). If bidders or their agents are not present, a city employee not involved in the tender procedures will be present. However, the disbursing officer may choose not to have bidders or city employees present if it is deemed that the fairness and proper execution of the tender procedures will not be hindered.
(7) The disbursing officer may select tender documents by lottery if deemed necessary to ensure fair and proper bid execution. The number of tender documents to be selected in this case will be indicated by the disbursing officer at the time of the lottery.
(8) Tenders falling under any of the following shall be invalid:
a. When a bidder submits two or more tenders for the same item.
b. When a bidder acts as an agent for another person, or an agent acts as an agent for multiple persons.
c. When the tender security is not paid in whole or in part, except when it is exempted.
d. When there has been collusion or other unfair practices in the tender.
e. When the tender document is not signed and sealed.
(For electronic bidding systems, when a person who has not obtained electronic certification bids.)
f. When the contents of the tender document cannot be confirmed.
g. When a person who does not have tender participation qualifications submits a tender.
h. When other provisions specified by the disbursing officer in advance are violated.
(9) If the estimated price is publicly announced in advance, re-bids will not be held.
(10) The following system applies as the low bid price system:
Low Bid Price Investigation System: A "Standard Price for Low Bid Investigation" (hereinafter referred to as "Standard Price") and a "Disqualification Judgment Standard by Price" (hereinafter referred to as "Disqualification Standard") are established. If the bid amount of the successful bidder candidate falls below the Standard Price but is above the Disqualification Standard, the bid will be suspended, and a hearing with the successful bidder candidate and consultation with relevant organizations will be conducted to determine whether there is a risk of non-performance of the contract. If the low bid price investigation is not cooperated with, such as by not submitting the investigation form by the deadline or not attending the hearing, the successful bidder candidate will not be awarded the contract. However, the contract period will not be extended due to this investigation period. Furthermore, if the contract is awarded at a price below the Standard Price but above the Disqualification Standard, third-party verification will be required. If it is found that false documents or explanations were submitted during the low bid price investigation, or if there is a significant discrepancy between the content at the time of the investigation and the submitted deliverables (excluding cases where there are reasonable grounds for discrepancy), it will be strictly reflected in the evaluation of the contract performance, and participation qualification suspension measures may be taken. Bidders whose bids fall below the Disqualification Standard will be disqualified. Details are in accordance with the "Gifu Prefecture Guidelines for Low Bid Price Investigation, etc. for Consulting Services".
(11) The successful bidder candidate will be determined as follows:
a. Within the limit of the estimated price prepared in accordance with Article 111 of the Regulations, the lowest bidder will generally be the successful bidder candidate.
b. If there are two or more successful bidder candidates, the successful bidder will be determined by lottery. In this case, withdrawal from the lottery is not permitted.
(12) Tender documents shall be handled as follows:
a. Costs for preparation and submission shall be borne by the bidder.
b. Shall not be used for any purpose other than bid execution.
c. Shall not be returned to the bidder.
d. Replacement, resubmission, or withdrawal of tender documents is not permitted.
(13) Other: Bid execution shall be in accordance with the Enforcement Order and the Regulations.
6. Confirmation of Tender Participation Qualifications:
(1) As a result of the bid opening, the successful bidder candidate must submit confirmation documents (Tender Participation Qualification Confirmation Application (Appendix Form 2) and attached documents as specified in the General Competitive Tender Guidelines) by the submission deadline instructed by the disbursing officer (submission via the electronic bidding system is not possible). If the successful bidder candidate does not meet the tender participation qualifications, the next highest bidder will be considered the successful bidder candidate, and confirmation documents must be submitted by the submission deadline separately instructed by the disbursing officer.
(2) If the successful bidder candidate fails to submit all or any of the confirmation documents by the submission deadline, or if the submitted confirmation documents do not meet the tender participation qualifications, the bid will be invalidated. Furthermore, errors or omissions in the submitted confirmation documents may result in invalidation.
(3) Confirmation documents shall be handled as follows:
a. If a format is specified in the tender announcement, prepare it in that format.
b. Costs for preparation and submission shall be borne by the successful bidder candidate.
c. Shall not be used for any purpose other than confirming tender participation qualifications and additional points.
d. Shall not be returned to the successful bidder candidate.
e. Replacement or resubmission after the submission deadline is generally not permitted.
7. Determination of Successful Bidder and Contract Procedures:
(1) When the successful bidder is determined, a "Successful Bidder Determination Notice" will be sent to the bidder.
(2) If the successful bidder does not conclude the contract (including a provisional contract) within one week from the date of receiving the "Successful Bidder Determination Notice", the bid will be invalidated.
(3) If the resolution of the Gifu Prefectural Assembly is required for the conclusion of this contract, a provisional contract will be concluded after the bid award, and the final contract will be concluded after the resolution. However, even after the provisional contract, the final contract may not be concluded depending on the circumstances of the resolution, etc.
(4) The language and currency used in contract procedures shall be Japanese and Japanese currency, respectively.
(5) Tender security and contract security shall be exempted if they fall under any of the items in Article 114 of the Regulations.